What are the roles & responsibilities for the end users?
Planners:
o To set Saudization business plan target for their organization
o To extract Saudization report
Contract Advisors
o Administrative activities, such as; Contract award, and deduction rate adjustment
o Approve workflows, such as; approve the timesheet
Saudization Officers
o To review Saudization and training plan, approve the timesheet and monitor the
Saudization.
eLearning details:
When contractor assign workforce to the contract, the workflow is triggered for
proponent approval. But what happened if contractor assign multiple workforce to the
contract,is one workflow trigger for all or separate for each workforce?
Workflow will be triggered Separate for each workforce
When submitting the neccessary documents, why does the contractor provide overall
Saudization targets?.
Overall Saudization targets are provided to determine the Headcount KPI calculation.
When the Saudi workforce release and go to deployment pool, is it available for the
same contractor only to utilize OR to all contractors?
All contractors.
Once CSMART go live, will still be required to generate Saudization & other reports
from the old systems?
The Service Entry sheet will be no longer used to track Saudization. The Saudization will be
tracked using timesheet in CSMART, the Saudization will be calculated automatically in CSMART
and the deduction should be made through MCM.
How the system will calculate the deductions ? that would be helpful since we have
two types by time unit rate & work unit rate.
CSMART will calculate the Saudization deduction based on the selected method; by (manhour/
or headcount).
Note: CSMART will not process the deduction, deduction will be processed outside CSMART via
MCM.
If the contractor have not met the KPI for a certain quarter, is there a documentation
must be filled by proponent or contractor to be filled ?or directly take action ?
No, any actions for noncompliance to Saudization should be done outside CSMART.
How do the system calculate the headcount if the employee did not completed the
whole no. of days in a month like example, in 26 working days in a month and if the
employee work only 12 days. what will be the calculation in the end of the month? do
the system counted it?
Yes, the system will count the headcount according to the work schedule days.