Revised Job Safety Analysis

PROJECT / TASK: Fabrication work Date: 18/09/07

Structural Engineer: Himanshu, Ratan Location : All around Site.

JOB STEP HAZARDS CONTROL MEASURE ACTION


Break the job into steps. List the hazard or type of harm List the necessary control measures to be followed to eliminate/ Person who will ensure
Listing work which may be hazardous. identified with each step reduce the identified hazards this happens

-1-
Revised Job Safety Analysis

Vehicle movement for getting Hit Hazard Access to be cleared from all unwanted materials or
materials inside the site as well as traffic to enter the work area.
material shifting inside the site Mr. R.K. Mishra
Valid licence for the driver.

Entry will be done at the gate before entering the


site.

Helper to be provided for controlling the traffic by


signal.

Continuous supervision to be provided.

PPE’s to be provided (Safety Shoes, Helmet, Hand


gloves, Goggles, If required dust mask will also be
provided.

Documents of the equipment to be checked and


Loading, Unloading & Shifting of Mobile Plant
cleared.
Steel Using Hydra/Crane
Valid licence for the operator.

Proper access to be provided and with the help of


a helper equipment to be placed on a flat base.

Equipment with the lifting tools, tackles to be


certified by a competent person before started
using.

All the tools and tackles to be certified by a


-2-
Revised Job Safety Analysis
Material Fall Hazard competent person.

Authorised operator is allowed to operate the


Crane/Hydra

Proper SWL to be followed. Do not over load..

Only one man is allowed to control the signal.

Trained riggers are allowed to tie the material


And the same to be checked before lifting.

Continuous supervision to be provided.

Proper Stacking of materials inside the vehicle


as well as at storage area.

Do not over load.

Hit Hazard Gay rope to be provided to avoid tilting and for


guiding

Material shifting area should isolated and continuous


supervision to be provided.

Person Fall hazard Access to be cleared from all unwanted materials


from Vehicle to the stack yard or vice versa & from
-3-
Revised Job Safety Analysis
By Manually stack yard to the work area.

PPE’s Helmet, Shoes, Reflective Vest, Hand gloves,


goggles to be provided for all those who are engaged
on the work.

Stacking area to be barricaded and proper sign


boards to be displayed.

Daily tool box to be followed and to be recorded


Eye Hazard
Continuous supervision to be provided.

Safety Goggles to be given to avoid eye hazard.

Inadequate illumination
Proper illumination to be provided while working at
Working at night night as per required.

Site First aid centre provided incase of any first aid


and emergency vehicle is available at site during the
time of work.

Defective machines

Welding Proper cables to be provided for holder and earthing.

Cables to be fixed using lugs and should be tightly


connected to the machine.

No loose connections are not allowed to avoid fire


-4-
Revised Job Safety Analysis
and other disaster.

Machines are to be properly covered and should be


sealed from electrical cables touching the cover or
body of machine to avoid electrical shock.

All the machines to be checked by the electrical in


charge and put green tag showing machine is in
good condition to use before using the machine.

In case of Defective machines, should be removed


from the site as soon as possible or put “NOT IN
USE” board showing the same removing the cable
from the panel with the help of electrician as soon
the machine got any complaint while working.

Machines should be properly placed away for


flammable or combustible materials and should be
properly barricaded.

Provided with suitable Fire Extinguishers.

Daily checklist to be maintained for the same.

Personal Injury

Only authorized and skilled welder to be deployed for


the same.

Aprons and other Personal Protective equipments


like Face shield, leather hand gloves to be provided

-5-
Revised Job Safety Analysis
before starting the work.

Proper insulated welding holder should be used for


holding welding rod and earthing should be given
through cable fixed with insulated welding holder.

Joints on welding cables and earthing through steel


rod should be strictly prohibited.

Area should isolated form other activities with proper


signboards.

Work area should be cleared out from flammable or


explosive materials near by vicinity.

Helper should be provided for making alteration on


current while working.

Suitable fire extinguisher to be provided on the work


area.

Machine should be properly kept and all the cable,


welding cables as well as electric cables will keep
properly near the machine after disconnecting it form
the panel.

Pre-job briefing to be given before starting the job


and tools box talks to be done on daily basis.

Continuous supervision to be provided.


Electrical Hazard

Proper Cables (armoured cable) without any joint to


be used for electric supply through ELCB.

-6-
Revised Job Safety Analysis
Proper double earthing to be provided.

Power to be cut-off while not working and the cable


to be removed from the panel and kept properly.

Electrical in charge should check the machine and


put green sticker before starting the job.

Daily toolbox talks to be followed.

Skilled and trained welder should be deployed for the


same.
Working at height

Proper work platform to be provided and welding


cables should be properly secured before starting the
work.

Proper fall protection like Safety harness to be


provided and lifeline to be provided where ever
necessary.

Suitable PPE’s to be provided with aprons, leather


hand gloves etc.

Area below the welding should be barricaded and


should be isolated from access and other things.

Proper sign board to be displayed and continuous


supervision to be provided.

Welding cable lugs to be fixed tight to the machine

-7-
Revised Job Safety Analysis
and proper to avoid fire.

Storage of flammable or combustible materials is


strictly prohibited underneath or near by area when
the work is going on at height.

Nobody is allowed to stand underneath when the


work is going on at height.

Underneath area should be isolated and cleared


Eye hazard from other activities.

Fire Hazard 11Adin glass on face shield to be used & 5A din


glass for helper.

CO2 /DCP Fire extinguisher to be provided.

Pre-job Briefing to be done before starting the job


Inadequate illumination and toolbox talks to be done on daily basis.

Working at night

Sufficient illumination to be provided.

Personal Injury

Cutting using DA

Only skilled and trained cutter should be deployed.

Only DA is allowed to use along with Oxygen.

Daily Cylinder as well as hose connections using

-8-
Revised Job Safety Analysis
soap water solution for leakage.

Through Visual checking for hoses before starting


the work.

Cylinders should in a vertical trolley tied with chain.


DA will be covered and should be wet always.

Cutting hoses to be identified with a colour code of


Blue for oxygen and Red for DA.

No joints on gas hoses and cutting torch is of trade


mark one.

Proper flash back arrestor and non return valve


should be used on both cylinder side and the torch
side respectively.

Should wear all the PPE’s including leather hand


gloves and goggles.
Eye hazard
Proper housekeeping to be provided by removing
cutting scraps and all as soon as the work ends.

Cutting 5Adin glass to be provided.

Pre-job briefing to be done before the work starts


and tool box to be given on daily basis.
Fire Hazard
Continuous supervision to be provided.

Proper Cutting lighter to be used.

Storage of flammable or combustible materials is


strictly prohibited underneath or nearby area when

-9-
Revised Job Safety Analysis
the work is going on at height.

Nobody is allowed to stand underneath when the


work is going on at height.

Underneath area should be isolated, barricaded and


cleared from other activities.

Working at night CO2/DA fire extinguishers to be provided.

Pre-job briefing to be done before starting the job


and tool box talks to be done on daily basis.

Using defective hand tools /


power tools. Sufficient illumination to be provided
Grinding & Drilling
Electrical hazard

Proper hand tools/ power tools to be used for


grinding. All the rotating parts of the tools should be
guarded.

Proper connection with earthing through ELCB to be


provided.

Each and every power tools should be checked by


the electrician and put green sticker before using the
tools.

All the tools should be checked daily before use. Pre-


job briefing to be done before starting the job and
- 10 -
Revised Job Safety Analysis
tool box talks to be given on daily basis.

Proper cables to be used. No loose cables, proper


earthing should be there and connection through
ELCB only.

Storage of flammable or combustible materials is


strictly prohibited underneath or nearby area when
the work is going on at height.

Nobody is allowed to stand underneath when the


work is going on at height.
Fire hazard
Underneath area should be isolated and cleared
from other activities.

Eye Hazard CO2 / DCP fire extinguisher to be provided.

Tool box talks to be done on daily basis and to be


recorded.

Face Shield/Safety goggles to be provided.

Job Hazard Analysis Attendees: R.K. Mishra/Himanshu/Ratan


Date : 18/09/07
Written by: R. Pradeep
Reviewed by:

- 11 -