JSA Erection Structure
JSA Erection Structure
JSA Erection Structure
-1-
Revised Job Safety Analysis
Vehicle movement for getting Hit Hazard Access to be cleared from all unwanted materials or
materials inside the site as well as traffic to enter the work area.
material shifting inside the site Mr. R.K. Mishra
Valid licence for the driver.
Inadequate illumination
Proper illumination to be provided while working at
Working at night night as per required.
Defective machines
Personal Injury
-5-
Revised Job Safety Analysis
before starting the work.
-6-
Revised Job Safety Analysis
Proper double earthing to be provided.
-7-
Revised Job Safety Analysis
and proper to avoid fire.
Working at night
Personal Injury
Cutting using DA
-8-
Revised Job Safety Analysis
soap water solution for leakage.
-9-
Revised Job Safety Analysis
the work is going on at height.
- 11 -