Challenges
Achievement of service level bench mark.
Equal Water quantity supply- (55-70lpcd) to all houses in habitations.
Residual Pressure of +7 m.
Reduction in non revenue water.
Revenue recovery improvement to 100%
Complaints redressal in 48 hrs.
2
17-06-2022
Methodology Adopted
Engineering solutions
Creations of Minimum 4 Zones in each village.
Installation of low cost Flow control valves.
Fixing and changing water supply timing in each village from 1 hour in whole
village to 2 hours i.e. 30 minutes in four zones separately.
Mobile complain redressal van deployment.
Social solution
One valve man for approximately 700 connections and minimum wages as
per collector rate to ensure employment and dedicated service which was not
there when only honorarium of only Rs 3000 was paid.
Involvement of Women SHG.
Demonstration of service level bench mark to all villagers.
Affidavit during new connection for economical use and preventing misuse .
3
17-06-2022
4
17-06-2022
Mohkhed MVS- new additional valves fixing in each village for zoning and flow control
No. of Valves
S.No. Name Of Village Increase in no. of Valves
2018 2022
1 Saroth 5 7 2
2 Mahalpur 4 7 3
3 Shakarjhiri 1 1 0
4 Lohangi 4 7 3
5 Sonmau 3 4 1
6 Khari 2 2 0
7 Palakhed -1 5
8 13
8 Palakhed -2 0
9 Pathrakhokhar 3 5 2
10 Shankarpur 1 4 3
11 Ambamali 2 4 2
12 Chabadi 4 5 1
13 Satnur 3 5 2
14 Rajegaon 6 15 9
15 Suhagpur 1 2 1
16 Khapa 1 1 0
17 Rajada 5 11 6
18 Mohkhed - 1 9
11 20
19 Mohkhed - 2 0
20 Singpur 5 8 3
21 Murdai 1 2 1
22 Urdhan 1 2 1
23 Mau 6 11 5
24 Gadmau 4 5 1
25 Khedi 3 5 2
26 Tansra Mal 8 16 8
27 Tinkhuhi 1 3 2
28 Tara 3 7 4
29 Umranala 5 11 6
30 Ekalbihari - 1 15
20 35
31 Ekalbihari - 2 0
32 Jam 4 8 4
33 Anjani 4 6 2
Total 129 232 103
Additional Sluice valves fixed, zones made and details of water supply timings
No. of flow control washers fixed and details of revenue collection person
Valve Zones Water Supply Timing Flow Control Water Collection person &
washer fixed Honorarium
2018 2022 2018 2022 2018 2022
5 7 4 7 01:00:00 Min 01:30:00 Min 35 Gajanand Kadve
5
17-06-2022
Mohkhed MVS- Formation of Zones and appointment of Valve men for equal water
distribution and revenue recovery
UNIPRO TECHNO INFRASTRUCTURE PVT.LTD
Mohkhed . Saroth Dist. Chhindwara MP
Monthly Gross
Tank Capacity Number of Connections Name & Contact No.
S.No. OHT Name Of Village Salary
(Lacs Litres) upto Jan. 2022 Of Volve man
Of@Rs.Volve Man
1 Saroth Village 0.6 Saroth Village 349
Raju Uikey
Sonmau Village 260 8700
3 Sonmau Village 0.5 8718001750
Khari Village 69
Achievements
Mahalpur Village 248
Rupesh Uikey
2 Mahalpur Village 1.8 Shakarjhiri Village 86 8700
9285001418
Lohangi Village 73
4 Palakhed -1 0.6 Palakhed -1
621
5 Palakhed -2 1.6 Palakhed -2
Deepak Mankar
Patrakhokar Village 88 8700
8839931406
6 Patrakhokar Village ,1.0 Shankarpur Village 94
Ambamalli Village 181
Chabdi Village 109 Pandurang Charpe
7 Chabdi Village 0.8
Satnur Village 163 7879332886 8700
8 Rajegaoun Village 0.6 Rajegaoun Village 381
Suhagpur Village 135 Ramesh Vishyakarma
9 Suhagpur Village 0.6
Khapa Village 31 9285001425 8700
10 Rajada Village 0.5 Rajada Village 227 8109761421
6
17-06-2022
7
17-06-2022
Collection of
water tariff from
household
Capacity
Building
Activities
8
17-06-2022
9
17-06-2022
Achievements
Water consumption reduced from 40 lakh liters to 32 lakhs liters par
day.(80-90 lpcd to 60-70lpcd)
Revenue collection increased to 114% .
VWSC got richer as low water bill raised to them .
Self sustainable model for VWSC and operation and maintenance of
MVS.
Electric bill reduced in spite of increase in tariff.
Water production cost for MVS is Rs 12/KL. Water consumption
reduced by 8 lakh liters from FY 18-19 to 21-22. Hence amount saved
is Rs 35 lakhs per year for a population of about 40 lakh.
FY 21-22
10
17-06-2022
FY 21-22
FY 21-22
11
17-06-2022
FY 21-22
FY 21-22
12
17-06-2022
THANK YOU
13