Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

ESHS Weekly Report - 11 Agt 2023

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 5

A.

ESHS ACTIVITY

Add details from Monthly Report – Cut n Paste

Page |1
ATTACHMENT ESHS

A – Employment

B – ESHS Personnel

C – Induction & Training

D – Covid-19 Handling Management

E – Daily Toolbox Meetings

F – ESHS Meetings

G – ESHS Non-Conformances (This Week)

H – ESHS Non-Conformances Statistics

I – Social communication report

J – ESHS Pictures
Attachments ESHS

A – Employment
Total Employees : 39
Total Employees Resigned :7
Total ESHS Employees :3
Total Local Employees :8
Total Female Employees :4
Total Disadvantaged Employees :0

B - ESHS Personnel
Rudy Hermana
Rendy Z. Sahroni
Nia Magdalena

C – Induction & Training


Current Week Cumulative
Induction 0 42
Defensive Driver Training 0 24
Emergency Procedure 0 1
JCM Covid 19 Protocol 0 367
Fire Extinguisher 0 28
Penalty System 0 41
Sexual Harassment 0 24

D – Covid-19 Handling Management


Current Week Cumulative
Antigent Test 0 30
PCR Test 0 0
Positif Covid-19 0 2

E – Daily Toolbox Meetings


Day Date Topic
Saturday 05 Agt 2023 n/a
Sunday 06 Agt 2023 n/a
Monday 07 Agt 2023 n/a
Tuesday 08 Agt 2023 n/a
Wednesday 09 Agt 2023 n/a
Thursday 10 Agt 2023 n/a
Friday 11 Agt 2023 n/a
F - ESHS Meetings

ITDC Meetings
Day Date Topic
N/A N/A N/A

Package 1 – PP-Wika-BRL
Day Date Topic
Friday August 11, 2023 ESHS Weekly Meeting

Package 2 – HK-Adhi
Day Date Topic
Thursday August 10, 2023 ESHS Weekly Meeting

PMC
Day Date Topic
N/A N/A N/A

Social P1-P2
Day Date Topic
N/A N/A N/A

Other Meetings
Day Date Topic
N/A N/A N/A

G – ESHS Non-Conformances (This Week)


Description of Nonconformance

H – ESHS Non-Conformances Statistics

Category Current Week Cumulative


Fatality 0 0
Lost Time Injury (LTI) 0 0
Medically Treated Injury (MTI) 0 2
1st Aid Injury (FAI) 0 4
Incident (Property Damage) 0 4
Near Miss 0 2
Social 0 1
Environmental Issue 0 0
Health Issue ` ` 0 2

I. Social communication report


Social Communications Reports
This Week Cumulative
00 278
Mandalika Urban and To urism Infrastructure Project

J. ESHS Pictures

ESHS CMC ESHS CMC

ESHS Weekly Meeting – MUTIP-1 ESHS Weekly Meeting – MUTIP-2

Joint Safety Inspection – MUTIP-1 Joint Safety Inspection – MUTIP-2

You might also like