1.1 Construction Progress Up To March 2023
1.1 Construction Progress Up To March 2023
1.1 Construction Progress Up To March 2023
2 Intake Well 14000 14000 14000 0 170 158 158 12 2156 2061 2061 95 100% 93% 96%
PTU 2600 2600 2600 0 45 20 20 25 585 374.5 374.5 210.5 100% 44% 64%
4 SBR Basins 29679 29589 29589 90 830 773.5 773.5 56.5 11605.5 10149.1 10149.1 1456.4 100% 93% 87%
CHLORINATION
5 7200 7200 7200 0 120 100.1 100.1 19.9 1787.5 1665.5 1665.5 122 100% 83% 93%
TANK (CCT)
Sludge
6 3111.5 3111.5 3111.5 0 30 23.9 23.9 6.1 459 372.5 372.5 86.5 100% 80% 81%
Handling Unit
Buildings
Transformer
1
Yard
2 HT Panel Room
3 DG Platform
Platform for
4
DG Exhaust
AIR Blower
5 Room/PMCC 3800 2000 2000 1800 47 12 12 35 690 372.5 372.5 317.5 100% 26% 54%
&C NTR LRM
Centrifuge
6 Feed Pump
house
Centrifuge
7
House
8 Security Room
Administrative
9 271.44 271.44 271.44 0 11 11 11 0 97.7 97.7 97.7 0 100% 100% 100%
Building
Excavation Quantity (Cum) Reinforcement Quantity (MT) Concrete Quantity (Cum) Progress of Work (%)
Structural This This
S.No. Total Total Total Reinforcement Concrete Remarks
Elements Total Balance Total Month Balance Total Month Balance Excavation Work
Cumulative Cumulative Cumulative Work Work
Executed Executed
Process
Unit
Stilling
2
Chamber
Fine Screen
3 Channel -
Mechanical
Fine Screen
4 Channel -
Manual 260 260 0 18.4 0 18.4 0 166 0 166 0 100% 100% 100%
Grit
5 Chambers-
Mechanical
Manual Grit
6
Chamber
Centrate
Sump
Parshall
7
Flume
1750 1750 0 91.5 0 91.5 0 1290 0 1289 1 100% 100% 100%
8 SBR Basins
Buildings
Transformer
1 45 45 0 0 0 0 0 1 0 1 0 100% 0% 100%
Yard
HT Panel
2
Room
SCADA
3 Control
Room
250 250 0 9 0 9 0 105 0 105 0 100% 100% 100%
Office Cum
Laboratory
4
Building &
Head Room
AIR Blower
5
Room 355 355 0 12 0 12 0 156 0 156 0 100% 100% 100%
6 MCC Room
Chlorination
7 Chlorination 590 590 0 13.5 0 13.5 0 180 0 180 0 100% 100% 100%
Tank
Excavation Quantity (Cum) Reinforcement Quantity (MT) Concrete Quantity (Cum) Progress of Work (%)
Structural This This
S.No. Total Total Total Reinforcement Concrete Remarks
Elements Total Balance Total Month Balance Total Month Balance Excavation Work
Cumulative Cumulative Cumulative Work Work
Executed Executed
Chlorine
Tonner
House
DG Room &
8 0 0 0 7 0.5 4.45 2.55 75 13 39 36 0% 64% 52%
Store Room
SHU &
Centrifuge
House and
9
Centrifuge
Feed Pump
House
Chlorination 0 0 0 23 5 17 6 220 34 192 62 0% 74% 87%
10
Tank
Sludge
11
Sump
DWPE
12 Dosing
Tanks
Excavation Work Quantity in Reinforcement Work Quantity in Concrete Work Quantity in Progress of Work
Sl Structural (Cum) (MT) (CUM) (%) Remarks
no Elements
Reinforcement Concrete
Total Executed Cumulative Balance Total Executed Cumulative Balance Total Executed Cumulative Balance Excavation Work
Work Work
Receiving
1
Chamber
Coarse Screen
2
Channel -Manual
5 Stilling Chamber
Fine Screen
6
Channel - Manual
Fine Screen
7 Channel -
Mechanical
8 Grit Chambers
Sequential Batch
9 Reactors (SBR) 9072 0 9072 0 200 0 200 0 319 0 333 -14 100% 100% 100%
Basins
Wall Concrete
9b 1039.5 0 1039.5 0 100%
(1to5 lifts)&WWS
10 Chlorination Tank 1900 0 1900 0 40 1.5 20.5 19.5 268 18 232 34 100% 51.25% 86.50%
Sludge Handling
11 600 0 600 0 50 4.5 4.5 46.5 150 45 54 96 100% 9% 36%
Mechanism
13 HT Sub Station
Diesel Generator
14
Set House
Excavation Work Quantity in Reinforcement Work Quantity in Concrete Work Quantity in Progress of Work
Sl Structural (Cum) (MT) (CUM) (%) Remarks
no Elements
Reinforcement Concrete
Total Executed Cumulative Balance Total Executed Cumulative Balance Total Executed Cumulative Balance Excavation Work
Work Work
MCC Control
16
Building
Chlorination Cum
17 Chlorine Toner
House
19 Centrifuge House
Administrative
Building &
20 laboratory with
equipment &
Furniture
Internal roads/
landscaping/yard
21 lighting/compound
wall/with MS
gates
22 Security Room
Primary Treatment
23
unit
1 Intake Well 1118 1118 1118 0 20 16.5 16.5 3.5 360 127 316 42 100% 83% 88%
Stilling
2 30 30 30 0 2 0.1 0.1 1.9 10 1.5 1.5 8.5 100% 5% 15%
Chamber
Fine Screen
3 Channel - 30 30 30 0 2 0.2 0.2 1.8 10 2 2 8 100% 10% 20%
Mechanical
Fine Screen
4 Channel - 30 30 30 0 2 0.2 0.2 1.8 10 2 2 8 100% 10% 20%
Manual
Grit
5 Chambers- 50 50 50 0 3 0.2 0.2 2.8 20 4 4 16 100% 7% 20%
Mechanical
Manual Grit
6 50 50 50 0 3 0.2 0.2 2.8 20 4 4 16 100% 7% 20%
Chamber
Parshall
7
Flume
8 SBR Basins 3570 3570 3570 0 77 75 75 2 1310 30 1296 14 100% 97% 99%
Chlorine
9 Contact 1500 1500 1500 0 10 9.8 9.8 0.2 200 5 194.5 5.5 100% 98% 97%
Tank
Treated
10
Water Tank
Sludge
11 255 255 255 0 2.5 2.2 2.2 0.3 30 25 25 5 100% 88% 83%
Pump
Centrate
12 150 150 150 0
Sump
Dwpe
13 Dosing 45 45 45 0
Tanks
Buildings
Transformer
14
Yard
HT Panel
15
Room
16 DG Platform
SBR AIR
17 Blower
Room
18 MCC Room
550 550 550 0 40 9 25.7 14.3 430 15 107 322 100% 64% 25%
Admin Cum
Control
19
room
Building
Centrifuge
20 Feed Pump
House 250 250 250 0 25 7 7 18 150 53 53 97
100% 28% 35%
Centrifuge
21
House
Security
22
Room
Chlorination
cum
23 Chlorine
Tonner
Room
Excavation Work Quantity in Reinforcement Work Quantity in Concrete Work Quantity in Progress of Work
Sl Structural (Cum) (MT) (CUM) (%) Remarks
no Elements
Reinforcement Concrete
Total Executed Cumulative Balance Total Executed Cumulative Balance Total Executed Cumulative Balance Excavation Work
Work Work
1 Inlet Chamber
Fine Screen
3 Channel -
Mechanical
Fine Screen
4
Channel - Manual
Grit Chambers-
5
Mechanical
Manual Grit
6
Chamber
7 Parshall Flume
8 SBR Basins 5150 5150 5150 0 150 10 76 74 1720 147 1113 607 100% 51% 65%
9 Chlorination Tank 800 800 800 0 16 2.3 14 2 200 28 167 33 100% 88% 84%
9a Sludge Pump
DWPE Dosing
9b
Tanks
10 Centrate Sump
11 Buildings
12 Transformer Yard
13 HT Panel
14 DG Platform
16 MCC Room
Excavation Work Quantity in Reinforcement Work Quantity in Concrete Work Quantity in Progress of Work
Sl Structural (Cum) (MT) (CUM) (%)
Remarks
no Elements
Reinforcement Concrete
Total Executed Cumulative Balance Total Executed Cumulative Balance Total Executed Cumulative Balance Excavation Work
Work Work
Admin Building
&Control Room
17
Centrifuge Feed
Pump House
18 Centrifuge House
Chlorination Cum
Chlorine Tonner
19
House (Above
Chlorination Tank)
Internal roads/
landscaping/yard
21 lighting/compound
wall/with MS
gates
22 Security Room
1 Intake Well
Stilling
2
Chamber
Fine Screen
3 Channel -
Mechanical
Fine Screen 5000 5000 5000 0 50 30 30 20 550 310 310 240 100% 60% 56%
4 Channel -
Manual
Grit
5 Chambers-
Mechanical
Manual Grit
6
Chamber
Parshall
7 30 30 30 0 3 0 0 3 50 0 0 50 100% 0% 0%
Flume
8 SBR Basins 10343 10343 10343 0 230 165 165 65 3600 1907 1907 1693 100% 72% 53%
Chlorine
9 Contact 1000 900 900 100 25 0 0 25 500 0 0 500 90% 0% 0%
Tank
Treated
10
Water Tank
Sludge
11
Pump
750 750 750 0 12 4 4 8 500 60 60 440 100% 33% 12%
Centrate
12
Sump
Dwpe
13 Dosing
Tanks
Buildings
Transformer
13
Yard
HT Panel
14
Room
15 DG Platform
SBR AIR
16 Blower
Room
17 MCC Room
Admin Cum
Control
18 450 450 450 0 12 6 6 8 250 50 50 100 100% 50% 20%
room
Building
Centrifuge
19 Feed Pump
House
Centrifuge
20
House
Security
21
Room
Chlorination
cum
22 Chlorine
Tonner
Room
Process Unit
1 Intake Well 2800 2800 2800 0 30 26 26 4 360 340 340 20 100% 87% 94%
Stilling
2 0
Chamber
Fine Screen
3 Channel - 0
Mechanical
Fine Screen
4 Channel - 0
Manual
Grit
5 Chambers- 600 100 100 500 27 4 4 23 97 15 15 82 17% 0% 94%
Mechanical
Manual Grit
6 0
Chamber
Parshall
7 0
Flume
8 SBR Basins 2800 2800 2800 0 150 130 130 20 1484 1334 1334 150 100% 87% 94%
Chlorine
9 0
Contact Tank
Treated
10 0
Water Tank
Sludge
11 500 500 500 0 30 5 30 25 100 50 50 50 100% 100% 94%
Handling Unit
Centrate
12 0
Sump
Dwpe Dosing
13 0
Tanks
Buildings
16 DG Platform 0
SBR AIR
17 400 400 400 0 25 4 4 21 89 50 50 39 100% 16% 94%
Blower Room
18 MCC Room 0
Admin Cum
19 Control room 300 300 300 0 15 10 10 5 70 40 40 30 100% 67% 94%
Building
1 Intake Well 1022.58 1022.58 1022.58 0 20 7.2 7.2 14 328 139 139 233 100% 36% 42%
Stilling
2
Chamber
Fine Screen
3 Channel -
Mechanical
Fine Screen
4 Channel -
Manual
Grit
5 Chambers-
Mechanical
Manual Grit
6
Chamber
Parshall
7
Flume
8 SBR Basins 2542.6 2542.6 2542.6 0 95 74 74 34 1267 906 906 843 100% 78% 72%
Chlorine
9 Contact
Tank
Treated
10
Water Tank
Sludge
11
Pump
Centrate
12
Sump
Dwpe
13 Dosing
Tanks
Buildings
Transformer
14
Yard
HT Panel
15
Room
16 DG Platform
SBR AIR
17 Blower
Room
18 MCC Room
Admin Cum
Control
19 390 390 390 0 38.08 4.5 4.5 33.58 160 58.5 58.5 109.5 100% 12% 37%
room
Building
Centrifuge
20 Feed Pump
House
Centrifuge
21
House
Security
22
Room
Chlorination
cum
23 Chlorine
Tonner
Room
Excavation Quantity (Cum) Reinforcement Quantity (MT) Concrete Quantity (Cum) Progress of Work (%)
Structural This This
S.No. Total Total Total Reinforcement Concrete Remarks
Elements Total Balance Total Month Balance Total Month Balance Excavation Work
Cumulative Cumulative Cumulative Work Work
Executed Executed
Process
Unit
Wet Well
1 &Receiving
Chamber
Stilling
2
Chamber
Fine Screen
3 Channel -
Mechanical
Fine Screen
4 Channel -
Manual
Grit
5 Chambers-
Mechanical
Manual Grit
6
Chamber
Centrate
Sump
Parshall
7
Flume 17500 17500 0 578 0 0 578 3885 272 272 3613 100% 0% 7%
8 SBR Basins
Buildings
Transformer
1
Yard
HT Panel
2
Room
SCADA
3 Control
Room
Office Cum
Laboratory
4 Building &
Head Room
AIR Blower
5
Room
6 MCC Room
Chlorination
7 Chlorination
Tank
Chlorine
Tonner
House
1.1.1.10 37 MLD STP - Amber Cheruvu: Construction Activities on hold – Court Case
Process Unit
Receiving
1
Chamber
Coarse Screen
2 Channel -
Mechanical
Coarse Screen
3 Channel -
Manual
Raw Sewage
4
Sump
Stilling
5
Chamber
Fine Screen
6 Channel -
Mechanical
Fine Screen
7 Channel -
Manual
Grit
8 Chambers-
Mechanical
Manual Grit
9 Chambers-
Mechanical
10 Inlet Chamber 2500 1250 1250 1250 38.8 0 0 38.8 708 0 0 708 50% 0% 0%
11 Parshall Flume
12 SBR Basins 11560 11560 11560 0 324 220 220 104 4910 3345 3345 1565 100% 68% 68%
Chlorination
13 1350 0 0 1350 31 0 0 31 584 0 0 584 0% 0% 0%
Tank
Sludge
14
Holding Tank
DWPE Dosing
15
Tanks
Buildings
Metering
16
Room
HT Panel
17
Room
Transformer
18
Yard
DG Room &
19
Control Room
SBR AIR
20
Blower Room
21 MCC Room
Administrative
22 243 243 243 0 15.6 3 3 12.6 141 38 38 103 100% 19% 27%
Building
Centrifuge
23 Feed Pump
House
Centrifuge
24
House
25 Staff Quarter
Chlorination
26 cum Chlorine
Tonner Room
27 Security Room
1.1.1.11 28 MLD STP - Pariki Cheruvu: Construction Activities on hold – Court Case
Process Unit
7 SBR Basins 3500 3000 3000 500 1500 1340 1340 160 86% 0% 89%
8 UV Channel 100
Buildings
13 HT Panel 165
14 DG Platform 165
20 UV Panel Room 50