1.1 Construction Progress Up To March 2023

Download as pdf or txt
Download as pdf or txt
You are on page 1of 18

HMWS&SB

MONTHLY REPORT: Package III


MARCH-2023

1.1 Construction progress up to March 2023


1.1.1 Progress of Construction of STPs

1.1.1.1 133 MLD STP - Fathe Nagar

Excavation Quantity Reinforcement Quantity Concrete Quantity Progress of Work


Structural (Cum) (MT) (Cum) (%)
S.No. Remarks
Elements
Reinforcement Concrete
Total Executed Cumulative Balance Total Executed Cumulative Balance Total Executed Cumulative Balance Excavation Work
Work Work
Process Units
1 I & D Structure 4506.51 3200 3200 1306.51 91 71.57 71.57 19.43 2535 1879 1879 656 71% 79% 74%

2 Intake Well 14000 14000 14000 0 170 158 158 12 2156 2061 2061 95 100% 93% 96%

PTU 2600 2600 2600 0 45 20 20 25 585 374.5 374.5 210.5 100% 44% 64%

4 SBR Basins 29679 29589 29589 90 830 773.5 773.5 56.5 11605.5 10149.1 10149.1 1456.4 100% 93% 87%

CHLORINATION
5 7200 7200 7200 0 120 100.1 100.1 19.9 1787.5 1665.5 1665.5 122 100% 83% 93%
TANK (CCT)

Sludge
6 3111.5 3111.5 3111.5 0 30 23.9 23.9 6.1 459 372.5 372.5 86.5 100% 80% 81%
Handling Unit

Buildings
Transformer
1
Yard

2 HT Panel Room

3 DG Platform

Platform for
4
DG Exhaust

AIR Blower
5 Room/PMCC 3800 2000 2000 1800 47 12 12 35 690 372.5 372.5 317.5 100% 26% 54%
&C NTR LRM

Centrifuge
6 Feed Pump
house

Centrifuge
7
House

8 Security Room

Administrative
9 271.44 271.44 271.44 0 11 11 11 0 97.7 97.7 97.7 0 100% 100% 100%
Building

CANAD A | INDIA | ASIA | AFRICA | MIDDLE EAST Page | 1


HMWS&SB
MONTHLY REPORT: Package III
MARCH-2023

1.1.1.2 7 MLD STP - Durgam Cheruvu:

Excavation Quantity (Cum) Reinforcement Quantity (MT) Concrete Quantity (Cum) Progress of Work (%)
Structural This This
S.No. Total Total Total Reinforcement Concrete Remarks
Elements Total Balance Total Month Balance Total Month Balance Excavation Work
Cumulative Cumulative Cumulative Work Work
Executed Executed
Process
Unit

Wet Well &


1 Receiving 1630 1630 0 33 0 33 0 377 0 377 0 100% 100% 100%
Chamber

Stilling
2
Chamber
Fine Screen
3 Channel -
Mechanical
Fine Screen
4 Channel -
Manual 260 260 0 18.4 0 18.4 0 166 0 166 0 100% 100% 100%
Grit
5 Chambers-
Mechanical
Manual Grit
6
Chamber
Centrate
Sump
Parshall
7
Flume
1750 1750 0 91.5 0 91.5 0 1290 0 1289 1 100% 100% 100%
8 SBR Basins

Buildings
Transformer
1 45 45 0 0 0 0 0 1 0 1 0 100% 0% 100%
Yard
HT Panel
2
Room
SCADA
3 Control
Room
250 250 0 9 0 9 0 105 0 105 0 100% 100% 100%
Office Cum
Laboratory
4
Building &

Head Room

AIR Blower
5
Room 355 355 0 12 0 12 0 156 0 156 0 100% 100% 100%

6 MCC Room

Chlorination
7 Chlorination 590 590 0 13.5 0 13.5 0 180 0 180 0 100% 100% 100%
Tank

CANAD A | INDIA | ASIA | AFRICA | MIDDLE EAST Page | 2


HMWS&SB
MONTHLY REPORT: Package III
MARCH-2023

Excavation Quantity (Cum) Reinforcement Quantity (MT) Concrete Quantity (Cum) Progress of Work (%)
Structural This This
S.No. Total Total Total Reinforcement Concrete Remarks
Elements Total Balance Total Month Balance Total Month Balance Excavation Work
Cumulative Cumulative Cumulative Work Work
Executed Executed
Chlorine
Tonner
House

DG Room &
8 0 0 0 7 0.5 4.45 2.55 75 13 39 36 0% 64% 52%
Store Room

SHU &
Centrifuge
House and
9
Centrifuge
Feed Pump
House
Chlorination 0 0 0 23 5 17 6 220 34 192 62 0% 74% 87%
10
Tank
Sludge
11
Sump
DWPE
12 Dosing
Tanks

CANAD A | INDIA | ASIA | AFRICA | MIDDLE EAST Page | 3


HMWS&SB
MONTHLY REPORT: Package III
MARCH-2023

1.1.1.3 22 MLD STP - Khajakunta:

Excavation Work Quantity in Reinforcement Work Quantity in Concrete Work Quantity in Progress of Work
Sl Structural (Cum) (MT) (CUM) (%) Remarks
no Elements
Reinforcement Concrete
Total Executed Cumulative Balance Total Executed Cumulative Balance Total Executed Cumulative Balance Excavation Work
Work Work
Receiving
1
Chamber

Coarse Screen
2
Channel -Manual

Coarse Screen 3250 0 3250 0 40 0 39 1 490.55 12 486.55 4 100% 97.50% 99.18%


3 Channel -
Mechanical

Raw Sewage Sump


4
& Pump House

5 Stilling Chamber

Fine Screen
6
Channel - Manual

Fine Screen
7 Channel -
Mechanical

8 Grit Chambers

Sequential Batch
9 Reactors (SBR) 9072 0 9072 0 200 0 200 0 319 0 333 -14 100% 100% 100%
Basins

9a Raft concrete 1173.5 0 1173.5 0 100%

Wall Concrete
9b 1039.5 0 1039.5 0 100%
(1to5 lifts)&WWS

10 Chlorination Tank 1900 0 1900 0 40 1.5 20.5 19.5 268 18 232 34 100% 51.25% 86.50%

Sludge Handling
11 600 0 600 0 50 4.5 4.5 46.5 150 45 54 96 100% 9% 36%
Mechanism

12 DWPE Dosing Tank

13 HT Sub Station

Diesel Generator
14
Set House

CANAD A | INDIA | ASIA | AFRICA | MIDDLE EAST Page | 4


HMWS&SB
MONTHLY REPORT: Package III
MARCH-2023

Excavation Work Quantity in Reinforcement Work Quantity in Concrete Work Quantity in Progress of Work
Sl Structural (Cum) (MT) (CUM) (%) Remarks
no Elements
Reinforcement Concrete
Total Executed Cumulative Balance Total Executed Cumulative Balance Total Executed Cumulative Balance Excavation Work
Work Work

SBR Air Blower


15 50 15 15 35 10 1 1 9 150 20 20 130 30% 1% 13.33%
Room

MCC Control
16
Building

Chlorination Cum
17 Chlorine Toner
House

Sludge Pump &


18
Blower House

19 Centrifuge House

Administrative
Building &
20 laboratory with
equipment &
Furniture
Internal roads/
landscaping/yard
21 lighting/compound
wall/with MS
gates

22 Security Room

Primary Treatment
23
unit

CANAD A | INDIA | ASIA | AFRICA | MIDDLE EAST Page | 5


HMWS&SB
MONTHLY REPORT: Package III
MARCH-2023

1.1.1.4 7 MLD STP - Miyapur Patel Cheruvu:

Excavation Quantity Reinforcement Quantity Concrete Quantity Progress of Work


Structural (Cum) (MT) (Cum) (%)
S.No. Remarks
Elements
Reinforcement Concrete
Total Executed Cumulative Balance Total Executed Cumulative Balance Total Executed Cumulative Balance Excavation Work
Work Work
Process
Unit

1 Intake Well 1118 1118 1118 0 20 16.5 16.5 3.5 360 127 316 42 100% 83% 88%

Stilling
2 30 30 30 0 2 0.1 0.1 1.9 10 1.5 1.5 8.5 100% 5% 15%
Chamber

Fine Screen
3 Channel - 30 30 30 0 2 0.2 0.2 1.8 10 2 2 8 100% 10% 20%
Mechanical

Fine Screen
4 Channel - 30 30 30 0 2 0.2 0.2 1.8 10 2 2 8 100% 10% 20%
Manual

Grit
5 Chambers- 50 50 50 0 3 0.2 0.2 2.8 20 4 4 16 100% 7% 20%
Mechanical

Manual Grit
6 50 50 50 0 3 0.2 0.2 2.8 20 4 4 16 100% 7% 20%
Chamber

Parshall
7
Flume

8 SBR Basins 3570 3570 3570 0 77 75 75 2 1310 30 1296 14 100% 97% 99%

Chlorine
9 Contact 1500 1500 1500 0 10 9.8 9.8 0.2 200 5 194.5 5.5 100% 98% 97%
Tank

Treated
10
Water Tank

Sludge
11 255 255 255 0 2.5 2.2 2.2 0.3 30 25 25 5 100% 88% 83%
Pump
Centrate
12 150 150 150 0
Sump
Dwpe
13 Dosing 45 45 45 0
Tanks
Buildings
Transformer
14
Yard
HT Panel
15
Room

CANAD A | INDIA | ASIA | AFRICA | MIDDLE EAST Page | 6


HMWS&SB
MONTHLY REPORT: Package III
MARCH-2023

Excavation Quantity Reinforcement Quantity Concrete Quantity Progress of Work


Structural (Cum) (MT) (Cum) (%)
S.No. Remarks
Elements
Reinforcement Concrete
Total Executed Cumulative Balance Total Executed Cumulative Balance Total Executed Cumulative Balance Excavation Work
Work Work

16 DG Platform

SBR AIR
17 Blower
Room

18 MCC Room
550 550 550 0 40 9 25.7 14.3 430 15 107 322 100% 64% 25%
Admin Cum
Control
19
room
Building

Centrifuge
20 Feed Pump
House 250 250 250 0 25 7 7 18 150 53 53 97
100% 28% 35%
Centrifuge
21
House
Security
22
Room
Chlorination
cum
23 Chlorine
Tonner
Room

CANAD A | INDIA | ASIA | AFRICA | MIDDLE EAST Page | 7


HMWS&SB
MONTHLY REPORT: Package III
MARCH-2023

1.1.1.5 14 MLD STP - Shivalayam Cheruvu:

Excavation Work Quantity in Reinforcement Work Quantity in Concrete Work Quantity in Progress of Work
Sl Structural (Cum) (MT) (CUM) (%) Remarks
no Elements
Reinforcement Concrete
Total Executed Cumulative Balance Total Executed Cumulative Balance Total Executed Cumulative Balance Excavation Work
Work Work

1 Inlet Chamber

Intake Well &


2 3500 3000 3000 500 22 5.5 5.5 16.5 450 140 140 310 86% 25% 31%
Receving Chamber

Fine Screen
3 Channel -
Mechanical

Fine Screen
4
Channel - Manual

Grit Chambers-
5
Mechanical

Manual Grit
6
Chamber

7 Parshall Flume

8 SBR Basins 5150 5150 5150 0 150 10 76 74 1720 147 1113 607 100% 51% 65%

9 Chlorination Tank 800 800 800 0 16 2.3 14 2 200 28 167 33 100% 88% 84%

9a Sludge Pump

DWPE Dosing
9b
Tanks

10 Centrate Sump

11 Buildings

12 Transformer Yard

13 HT Panel

14 DG Platform

SBR AIR Blower


15
Room

16 MCC Room

CANAD A | INDIA | ASIA | AFRICA | MIDDLE EAST Page | 8


HMWS&SB
MONTHLY REPORT: Package III
MARCH-2023

Excavation Work Quantity in Reinforcement Work Quantity in Concrete Work Quantity in Progress of Work
Sl Structural (Cum) (MT) (CUM) (%)
Remarks
no Elements
Reinforcement Concrete
Total Executed Cumulative Balance Total Executed Cumulative Balance Total Executed Cumulative Balance Excavation Work
Work Work
Admin Building
&Control Room
17
Centrifuge Feed
Pump House

18 Centrifuge House

Chlorination Cum
Chlorine Tonner
19
House (Above
Chlorination Tank)
Internal roads/
landscaping/yard
21 lighting/compound
wall/with MS
gates

22 Security Room

CANAD A | INDIA | ASIA | AFRICA | MIDDLE EAST Page | 9


HMWS&SB
MONTHLY REPORT: Package III
MARCH-2023

1.1.1.6 25 MLD STP - Mullakathuva Cheruvu:

Excavation Quantity Reinforcement Quantity Concrete Quantity Progress of Work


Structural (Cum) (MT) (Cum) (%)
Sno Remarks
Elements
Reinforcement Concrete
Total Executed Cumulative Balance Total Executed Cumulative Balance Total Executed Cumulative Balance Excavation Work
Work Work
Process
Unit

1 Intake Well

Stilling
2
Chamber

Fine Screen
3 Channel -
Mechanical

Fine Screen 5000 5000 5000 0 50 30 30 20 550 310 310 240 100% 60% 56%
4 Channel -
Manual

Grit
5 Chambers-
Mechanical

Manual Grit
6
Chamber

Parshall
7 30 30 30 0 3 0 0 3 50 0 0 50 100% 0% 0%
Flume

8 SBR Basins 10343 10343 10343 0 230 165 165 65 3600 1907 1907 1693 100% 72% 53%

Chlorine
9 Contact 1000 900 900 100 25 0 0 25 500 0 0 500 90% 0% 0%
Tank

Treated
10
Water Tank

Sludge
11
Pump
750 750 750 0 12 4 4 8 500 60 60 440 100% 33% 12%
Centrate
12
Sump
Dwpe
13 Dosing
Tanks
Buildings
Transformer
13
Yard
HT Panel
14
Room

CANAD A | INDIA | ASIA | AFRICA | MIDDLE EAST Page | 10


HMWS&SB
MONTHLY REPORT: Package III
MARCH-2023

Excavation Quantity Reinforcement Quantity Concrete Quantity Progress of Work


Structural (Cum) (MT) (Cum) (%)
Sno Remarks
Elements
Reinforcement Concrete
Total Executed Cumulative Balance Total Executed Cumulative Balance Total Executed Cumulative Balance Excavation Work
Work Work

15 DG Platform

SBR AIR
16 Blower
Room

17 MCC Room

Admin Cum
Control
18 450 450 450 0 12 6 6 8 250 50 50 100 100% 50% 20%
room
Building

Centrifuge
19 Feed Pump
House

Centrifuge
20
House
Security
21
Room
Chlorination
cum
22 Chlorine
Tonner
Room

CANAD A | INDIA | ASIA | AFRICA | MIDDLE EAST Page | 11


HMWS&SB
MONTHLY REPORT: Package III
MARCH-2023

1.1.1.7 10 MLD STP Vennelagadda:

Excavation Quantity Reinforcement Quantity Concrete Quantity Progress of Work


Structural (Cum) (MT) (Cum) (%)
S.No. Remarks
Elements
Reinforcement Concrete
Total Executed Cumulative Balance Total Executed Cumulative Balance Total Executed Cumulative Balance Excavation Work
Work Work

Process Unit

1 Intake Well 2800 2800 2800 0 30 26 26 4 360 340 340 20 100% 87% 94%

Stilling
2 0
Chamber
Fine Screen
3 Channel - 0
Mechanical
Fine Screen
4 Channel - 0
Manual
Grit
5 Chambers- 600 100 100 500 27 4 4 23 97 15 15 82 17% 0% 94%
Mechanical

Manual Grit
6 0
Chamber

Parshall
7 0
Flume
8 SBR Basins 2800 2800 2800 0 150 130 130 20 1484 1334 1334 150 100% 87% 94%

Chlorine
9 0
Contact Tank
Treated
10 0
Water Tank

Sludge
11 500 500 500 0 30 5 30 25 100 50 50 50 100% 100% 94%
Handling Unit

Centrate
12 0
Sump
Dwpe Dosing
13 0
Tanks
Buildings

16 DG Platform 0

SBR AIR
17 400 400 400 0 25 4 4 21 89 50 50 39 100% 16% 94%
Blower Room

18 MCC Room 0

Admin Cum
19 Control room 300 300 300 0 15 10 10 5 70 40 40 30 100% 67% 94%
Building

CANAD A | INDIA | ASIA | AFRICA | MIDDLE EAST Page | 12


HMWS&SB
MONTHLY REPORT: Package III
MARCH-2023

1.1.1.8 7 MLD STP - Nallagandla:

Excavation Quantity Reinforcement Quantity Concrete Quantity Progress of Work


Structural (Cum) (MT) (Cum) (%)
S.No. Remarks
Elements
Reinforcement Concrete
Total Executed Cumulative Balance Total Executed Cumulative Balance Total Executed Cumulative Balance Excavation Work
Work Work
Process
Unit

1 Intake Well 1022.58 1022.58 1022.58 0 20 7.2 7.2 14 328 139 139 233 100% 36% 42%

Stilling
2
Chamber

Fine Screen
3 Channel -
Mechanical

Fine Screen
4 Channel -
Manual

Grit
5 Chambers-
Mechanical

Manual Grit
6
Chamber

Parshall
7
Flume

8 SBR Basins 2542.6 2542.6 2542.6 0 95 74 74 34 1267 906 906 843 100% 78% 72%

Chlorine
9 Contact
Tank

Treated
10
Water Tank

Sludge
11
Pump
Centrate
12
Sump
Dwpe
13 Dosing
Tanks
Buildings
Transformer
14
Yard
HT Panel
15
Room

CANAD A | INDIA | ASIA | AFRICA | MIDDLE EAST Page | 13


HMWS&SB
MONTHLY REPORT: Package III
MARCH-2023

Excavation Quantity Reinforcement Quantity Concrete Quantity Progress of Work


Structural (Cum) (MT) (Cum) (%)
S.No. Remarks
Elements
Reinforcement Concrete
Total Executed Cumulative Balance Total Executed Cumulative Balance Total Executed Cumulative Balance Excavation Work
Work Work

16 DG Platform

SBR AIR
17 Blower
Room

18 MCC Room

Admin Cum
Control
19 390 390 390 0 38.08 4.5 4.5 33.58 160 58.5 58.5 109.5 100% 12% 37%
room
Building

Centrifuge
20 Feed Pump
House

Centrifuge
21
House
Security
22
Room
Chlorination
cum
23 Chlorine
Tonner
Room

CANAD A | INDIA | ASIA | AFRICA | MIDDLE EAST Page | 14


HMWS&SB
MONTHLY REPORT: Package III
MARCH-2023

1.1.1.9 43.5 MLD STP – Rainbow Vistas:

Excavation Quantity (Cum) Reinforcement Quantity (MT) Concrete Quantity (Cum) Progress of Work (%)
Structural This This
S.No. Total Total Total Reinforcement Concrete Remarks
Elements Total Balance Total Month Balance Total Month Balance Excavation Work
Cumulative Cumulative Cumulative Work Work
Executed Executed
Process
Unit
Wet Well
1 &Receiving
Chamber
Stilling
2
Chamber
Fine Screen
3 Channel -
Mechanical
Fine Screen
4 Channel -
Manual
Grit
5 Chambers-
Mechanical
Manual Grit
6
Chamber
Centrate
Sump
Parshall
7
Flume 17500 17500 0 578 0 0 578 3885 272 272 3613 100% 0% 7%
8 SBR Basins

Buildings
Transformer
1
Yard
HT Panel
2
Room
SCADA
3 Control
Room
Office Cum
Laboratory
4 Building &
Head Room
AIR Blower
5
Room
6 MCC Room

Chlorination
7 Chlorination
Tank

Chlorine
Tonner
House

CANAD A | INDIA | ASIA | AFRICA | MIDDLE EAST Page | 15


HMWS&SB
MONTHLY REPORT: Package III
MARCH-2023

1.1.1.10 37 MLD STP - Amber Cheruvu: Construction Activities on hold – Court Case

Excavation Quantity Reinforcement Quantity Concrete Quantity Progress of Work


Structural (Cum) (MT) (Cum) (%)
S.No. Remarks
Elements
Reinforcement Concrete
Total Executed Cumulative Balance Total Executed Cumulative Balance Total Executed Cumulative Balance Excavation Work
Work Work

Process Unit

Receiving
1
Chamber

Coarse Screen
2 Channel -
Mechanical

Coarse Screen
3 Channel -
Manual

Raw Sewage
4
Sump

Stilling
5
Chamber

Fine Screen
6 Channel -
Mechanical

Fine Screen
7 Channel -
Manual

Grit
8 Chambers-
Mechanical

Manual Grit
9 Chambers-
Mechanical

10 Inlet Chamber 2500 1250 1250 1250 38.8 0 0 38.8 708 0 0 708 50% 0% 0%

11 Parshall Flume

12 SBR Basins 11560 11560 11560 0 324 220 220 104 4910 3345 3345 1565 100% 68% 68%

Chlorination
13 1350 0 0 1350 31 0 0 31 584 0 0 584 0% 0% 0%
Tank

CANAD A | INDIA | ASIA | AFRICA | MIDDLE EAST Page | 16


HMWS&SB
MONTHLY REPORT: Package III
MARCH-2023

Excavation Quantity Reinforcement Quantity Concrete Quantity Progress of Work


Structural (Cum) (MT) (Cum) (%)
S.No. Remarks
Elements
Reinforcement Concrete
Total Executed Cumulative Balance Total Executed Cumulative Balance Total Executed Cumulative Balance Excavation Work
Work Work

Sludge
14
Holding Tank

DWPE Dosing
15
Tanks

Buildings
Metering
16
Room
HT Panel
17
Room
Transformer
18
Yard

DG Room &
19
Control Room

SBR AIR
20
Blower Room

21 MCC Room

Administrative
22 243 243 243 0 15.6 3 3 12.6 141 38 38 103 100% 19% 27%
Building

Centrifuge
23 Feed Pump
House

Centrifuge
24
House

25 Staff Quarter

Chlorination
26 cum Chlorine
Tonner Room

27 Security Room

CANAD A | INDIA | ASIA | AFRICA | MIDDLE EAST Page | 17


HMWS&SB
MONTHLY REPORT: Package III
MARCH-2023

1.1.1.11 28 MLD STP - Pariki Cheruvu: Construction Activities on hold – Court Case

Excavation Quantity Reinforcement Quantity Concrete Quantity Progress of Work

S.No. Structural Elements (Cum) (MT) (Cum) (%) Remarks


Reinforcement Concrete
Total Executed Cumulative Balance Total Executed Cumulative Balance Total Executed Cumulative Balance Excavation Work
Work Work

Process Unit

1 Stilling Chamber 250

Fine Screen Channel -


2 100
Mechanical

Fine Screen Channel -


3 100
Manual
Grit Chambers-
4 100
Mechanical

5 Manual Grit Chamber 100

6 Parshall Flume 100

7 SBR Basins 3500 3000 3000 500 1500 1340 1340 160 86% 0% 89%

8 UV Channel 100

9 Sludge Pump 250

10 DWPE Dosing Tanks 50

11 Centrate Sump 100

Buildings

12 Transformer Yard 165

13 HT Panel 165

14 DG Platform 165

15 SBR AIR Blower Room 165

16 MCC & Control Room 165


17 Admin Building 165
Centrifuge Feed Pump
18 500
House

19 Centrifuge House 800

20 UV Panel Room 50