Shelter
Shelter
Shelter
CERTIFICATE
Certified that the above estimate has been prepared based on KPWD SR for the year 2022 and prevailing
market rate, duly inspecting the spot in most economical way of execution.
2 M7.5
Col 10 1 1 0.1 1
0
SSM 2 12 0.8 0.1 1.92
EnD wall 2 6.47 0.8 0.1 1.0352
Duct 1 12 3.4 0.1 4.08
Deductions 0
Col -10 0.8 0.8 0.1 -0.64
Flooring 2 12 3.05 0.1 7.32
1 12 1.42 0.1 1.704
4.3 13 16.4192
3 M15
Columns 10 0.6 0.6 0.75 2.7
10 0.45 0.45 0.75 1.51875
Ramp 1 1.2 1.8 0.15 0.324
Flooring 5 2 3.05 0.1 3.05
1 2 1.42 0.1 0.284
4.6 13 7.87675
10 2.4 0.75 18
10 1.8 0.75 13.5
4.28 16 31.5
5 SSM
Side wall 2 12 0.45 1.2 12.96
End wall 2 6 0.45 1.2 6.48
Deduction -2 2 0.45 0.6 -1.08
0
Duct 2 12 0.6 0.4 5.76
2 12 0.45 1 10.8
Deduction -10 0.45 0.45 1.2 -2.43
Ramp 2 1.2 0.45 0.55 0.594
5.6 25 33.084
8 Truss
ISMB150 10 5.1 14.9 759.9
ISA 0
65X65X6 5 2 7.22 5.8 418.76
Top chord 5 2 3.85 5.8 223.3
0
Vertical members 0
ISA50*50*6 5 1.3 1.3 4.5 38.025
5 2 1.2 4.5 54
5 2 1 4.5 45
5 2 0.6 4.5 27
Inclained 0
ISA45*45*6 5 2 1.4 4 56
5 2 1.2 4 48
5 2 1 4 40
Cleats 10 5 0.1 4 20
Base platw 10 0.15 0.15 39.2 8.82
0
Purlins 0
ISA 50*50*6 10 12 4.5 540
7.3 43 2278.805
9 Colour galvalium Sheet
2 12 3.9 93.6
2 0.5 7.22 1.3 9.386
2 7.22 1 14.44
2 12 1 24
8.31 49 141.426
10 Ridge 1 12 0.5 6
8.32 49
11 MS Grill
12 Refilling
Electrification
26 Pvc pipes mtr 36 36
20mm
32 DP 1 4
33 Socket 2 6
34 ceiling rose 6 4
35 lamp holder 6 2
36 mCB Board each 1 1
35 MCBs 2 2
37 leD TUBE 6 8
38 Fixing tubes 6 6
33 led round lamp Each 2 2
34 porcelain fuse
Each 1 1
37 earthing
38 gi wire mtr 1 1