Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Ljdalbsnlabskbs

Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

lOMoARcPSD|1265725

Final Project in Building System Design

Civil Engineering (New Era University)

Studocu is not sponsored or endorsed by any college or university


Downloaded by Joell Jeff (joelljeff34@gmail.com)
lOMoARcPSD|1265725

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS
TABLE CONTENTS AND HIGHWAYS

OFFICE OF THE BUILDING OFFICIAL

SHT. NO. SHEET CONTENT

A-1 PERSPECTIVE

VICINITY MAP
DISTRICT/CITY/MUNICIPALITY
A-2 GROUND FLOOR PLAN

SECOND FLOOR PLAN

ROOF PLAN

FRONT ELEVATION

RIGHT SIDE ELEVATION LAND USE AND ZONING

LEFT SIDE ELEVATION

REAR ELEVATION

SECTIONAL PLAN

S-1 FOUNDATION PLAN LINE AND GRADE

PERSPECTIVE FLOOR FRAMING PLAN

ROOF FRAMING PLAN

E-1 LIGHTING LAYOUT

POWER LAYOUT ARCHITECTURAL


SINGLE LINE DIAGRAM

P-1 WATERLINE LAYOUT

SANITARY SEWAGE LAYOUT


64.0m

STRUCTURAL
42.0m
46.10m

SANITARY
64.20m

ELECTRICAL
SITE DEVELOPMENT PLAN VICINITY MAP

MECHANICAL

DRAWN BY: PROJECT TITLE: SUBMITTED TO: SHEET CONTENTS: SHEET NO: RATINGS:

DENI ZUCHIWEI M. SANCHO SANCHO RESIDENCE PROF. RODEL C. ANGKAHAN PERSPECTIVE


SCHEDULE: F 1:00 PM - 4:00 PM FINAL PROJECT IN BSD
VICINITY MAP
COURSE: BSCE INSTRUCTOR / BUILDING SYSTEM DESIGN
YEAR: 3RD YEAR SECTION: 3CE-4

Downloaded by Joell Jeff (joelljeff34@gmail.com)


lOMoARcPSD|1265725

17.7 19.7
17.7
2.6 15.2 6.6 11.2 17.7

ROOF RIDGE
LAUNDRY
KITCHEN GARDEN TERRACE

7.2

7.2
7.6
DINING SPANISH TILES ROOFING
5.9
7.6

AREA ROOF RIDGE

TOP PLATE
UP DOWN
0.3 CONTINUOUS GUTTER
5.9 SPANISH TILES ROOFING TOP OF THE WALL

4.8
2 PANEL HORIZONTAL SLIDER
BEDROOM 2 BEDROOM 4 TOP PLATE
4 PANEL SLIDING DOOR

8.3

8.3
CONTINUOUS GUTTER

8
0.3

WORKOUT DANCING TOP OF THE WALL SECOND FFL


8

SPACE AREA
HORIZONTAL SLIDER SINGLE GLASS PANEL

29.2

29.2

29.2
4.8
WINDOW UNITS

29.2
31.2
5.9
SECOND FFL GUARDRAILS 3 PANEL HORIZONTAL SLIDER
29.2

BRICK TILES ON COLUMN


BATHROOM 1 BATHROOM 2 FIRST FFL

5.5
HW 0.6
BRICK TILES ON COLUMN
5.5

5.9 GRADE LINE


13.7 GLASS PANEL WINDOW

13.7
FIRST FFL SLIDING DOOR UNIT
0.6
LIVING BAR
ROOM GRADE LINE

BEDROOM 1 8.1 BEDROOM 3


5 REAR ELEVATION
A 2
8.1

SCALE 1cm:2.25m

4 FRONT ELEVATION
6.6 1.9 9.2 6.6 1.9 9.2
17.7 17.7 A 2 SCALE 1cm:2.25m

1 GROUND FLOOR PLAN 2 SECOND FLOOR PLAN 3 ROOF PLAN ROOF RIDGE

A 2 SCALE 1cm:2.25m A 2 SCALE 1cm:2.25m A 2 SCALE 1cm:2.25m


5.9

SPANISH TILES ROOFING


TOP PLATE
ROOF RIDGE 0.3 CONTINUOUS GUTTER
TOP OF THE WALL
Y
4.8
5.9

Y
17.7
SECOND FFL GUARD RAILS
2.6 15.2
TOP PLATE 0.2m THICK SLAB
0.3 17.7
TOP OF THE WALL 6.6 11.2 BRICK TILES ON COLUMN
BEDROOM 4 5.9
BAR
LAUNDRY

4.8
KITCHEN GLASS PANEL WINDOW

7.2
7.6

DINING FIRST FFL


SECOND FFL
AREA 0.6

GARDEN TERRACE GRADE LINE

7.2
LIVING

7.6
ROOM 1mX1m FOOTING
BEDROOM 2
UP
X X
5.9

RIGHT SIDE ELEVATION


FIRST FFL DOWN 6
BEDROOM 2
X X A 2

8.3
0.6
SCALE 1cm:2.25m
8

GRADE LINE
WORKOUT
SPACE BEDROOM 4

8.3
29.2

29.2

8
DANCING
AREA
10 SECTION AT X-AXIS

29.2

29.2
ROOF RIDGE
A 2 SCALE 1cm:2.25m BATHROOM 1
5.5

HW

BATHROOM 2

5.5
5.9
ROOF RIDGE
13.7

SPANISH TILES ROOFING


LIVING TOP PLATE
ROOM 0.3 CONTINUOUS GUTTER

13.7
TOP OF THE WALL
8.1

5.9
BEDROOM 1
GLASS PANEL WINDOW
BAR
4.8
BRICK TILES ON COLUMN
TOP PLATE

8.1
0.3
BEDROOM 3
SECOND FFL GUARD RAILS
TOP OF THE WALL TERRACE
4.8 BAR 6.6 1.9 9.2 GLASS PANEL WINDOW
17.7
5.9
SECOND FFL WOOD PLANKS
0.2m THICK SLAB 6.6 1.9 9.2
Y 17.7 FIRST FFL
SLIDING WINDOW UNIT

LIVING AREA DINING 0.6 3 STEP STAIR


AREA
Y GRADE LINE
5.9

FIRST FFL 3-STEP STAIRS


0.6 @0.2m RISE,0.25m RUN
9 GROUND SECTIONAL PLAN
GRADE LINE
1mX1m FOOTING
A 2 SCALE 1cm:2.25m
8 SECOND SECTIONAL PLAN 7 LEFT SIDE ELEVATION

SECTION AT Y-AXIS A 2 SCALE 1cm:2.25m A 2 SCALE 1cm:2.25m


11
A 2 SCALE 1cm:2.25m

DRAWN BY: PROJECT TITLE: SUBMITTED TO: SHEET CONTENTS: SHEET NO: RATINGS:

DENI ZUCHIWEI M. SANCHO SANCHO RESIDENCE PROF. RODEL C. ANGKAHAN


AS SHOWN
COURSE: BSCE SCHEDULE: F 1:00 PM - 4:00 PM FINAL PROJECT IN BSD INSTRUCTOR/BUILDING SYSTEM DESIGN
YEAR: 3RD YEAR SECTION: 3CE-4

Downloaded by Joell Jeff (joelljeff34@gmail.com)


lOMoARcPSD|1265725

FOOTING SCHEDULE
A B C D E F G MAIN BARS 12mm
NUMBER LENGTH WIDTH DEPTH VARIED SPACING C/C B.W.
18
2 4 2 3 3 3
CF1 1.20m 1.20m 0.30m BENT @ L/4 A B C D E F G
CF1 CF1 CF1 CF1 CF1 CF1 CF1
WF1 VARIES 0.40m 0.20m 18
8 WF1 WF1 WF1 WF1 WF1 WF1 WF2 VARIES 0.30m 0.20m 2 4 2 3 3 3
WF1 WF2 WF1
8
4

CF1 CF1 CF1


7 1.2m HT-2 HT-2

4
WF1 WF2 WF1
7
4

16mmO @5" C/C HT-2 HT-2


CF1 CF1 CF1 CF1 CF1 CF1 CF1 0.5m
16mmO @5" C/C

6 A A
1.2m

4
WF2 WF2 WF2 WF2 WF2
HT-1 HT-1
0.3m
WF1 WF2 WF1 MAIN BARS 12mm
6
4

SPACING VARIES/SLAB
CF1 CF1 CF1 CF1 1.2m C/C B.W.
5 BENT @ L/4 T-1

4
COLUMN FOOTING SECTIONAL PLAN COLUMN FOOTING PLAN
WF1 WF2 WF2 WF1 VT-1
5
4

CF1 CF1
29

CF1 CF1 CF1 CF1 CF1


4 TWO-WAY SLAB DETAILS ONE-WAY SLAB DETAILS

4
WF2 WF2
2 COLUMN FOOTING DETAILS 7 8 T-1

29
WF1 WF2 WF1 E1 SCALE NTS E1 SCALE NTS E1 SCALE NTS 4
6

VT-1
CF1 CF1 CF1 CF1 CF1
3

6
WF2 WF2
PURLINS@1m SPACING
T-1
WF2
3
WF1 WF1
4

SLAB SCHEDULE
CF1 CF1 CF1 CF1
2 NAME THK. LENGTH WIDTH L/W TYPE SHORT DIRECTION LONG DIRECTION
HT-1 HT-1

4
@ SUPPORT(L/4) @ MIDSPAN(L/2) @ SUPPORT(L/4) @ MIDSPAN(L/2)

WF1 WF2 WF2 WF1 l TB @ 200mm l TB @ 200mm l TB @ 300mm l TB @ 300mm


2
0.2 S1 100 4.00m 2.00m 2.00m 1-WAY 10mm O 10mm O 10mm O 10mm O
4

0.2 HT-2 HT-2


CF1 CF1 CF1 CF1 CF1 CF1 CF1 0.4 0.3 l TB @ 100mm
10mm O l TB @ 400mm
10mm O l TB @ 100mm
10mm O l TB @ 400mm
10mm O

1
0.3 S2 100 4.00m 4.00m 1.00m 2-WAY
l BB @ 400mm
10mm O l BB @ 100mm
10mm O l BB @ 400mm
10mm O l BB @ 300mm
10mm O

4
WF1 WF1 WF1 WF1 WF1 0.4
l TB @ 100mm
10mm O l TB @ 400mm
10mm O l TB @ 100mm
10mm O l TB @ 400mm
10mm O HT-2 HT-2
WF1 S3 100 4.00m 3.00m 1.33m 2-WAY
CROSS SECTION WALL FOOTING PLAN CROSS SECTION WALL FOOTING PLAN l BB @ 400mm
10mm O l BB @ 100mm
10mm O l BB @ 400mm
10mm O l BB @ 300mm
10mm O

WF1 WF1 WF2 WF2 S4 100 4.00m 2.20m 1.82m 2-WAY l TB @ 200mm
10mm O l TB @ 200mm
10mm O l TB @ 300mm
10mm O l TB @ 300mm
10mm O 1
1 FOUNDATION PLAN
l TB @ 100mm
10mm O l TB @ 400mm
10mm O l TB @ 100mm
10mm O l TB @ 400mm
10mm O

E1 SCALE 1cm:2m
S5 100 3.80m 2.60m 1.46m 2-WAY
l BB @ 400mm
10mm O l BB @ 100mm
10mm O l BB @ 400mm
10mm O l BB @ 300mm
10mm O

3 WALL FOOTING DETAILS S6 100 6.00m 2.00m 3.00m 1-WAY l TB @ 200mm


10mm O l TB @ 200mm
10mm O l TB @ 300mm
10mm O l TB @ 300mm
10mm O
9 ROOF FRAMING PLAN
E1 SCALE NTS
l TB @ 200mm l TB @ 200mm l TB @ 300mm l TB @ 300mm E1 SCALE 1cm:2m
A B C D E F G
S7 100 6.00m 4.00m 1.50m 2-WAY 10mm O 10mm O 10mm O 10mm O

l TB @ 200mm
10mm O l TB @ 200mm
10mm O l TB @ 300mm
10mm O l TB @ 300mm
10mm O
18 S8 100 6.00m 3.00m 2.00m 1-WAY

2 4 2 3 3 3
B1 B2 B1 B3 B3 B3
8 5.7
S1 S2 S1 S3 S3 S3 17.7

B2 B2 B2 B2 B2 B2 B2
4

8.9 8.9 1.4 1.4 1.4 1.4

B1 B2 B1 B3 B3 B3
7 0.8 1.2 1.2 1.6 2 2 2 2 1.6 1.2 1.2 0.8
S1 S2 S1 S3 S3 S3
B2 B2 B2 B2 B2 B2 B2 5 BEAM DETAIL AT COLUMN SUPPORT
4

B1 B2 B1 B3 B3 B3 E1 SCALE NTS
6
STAIRS
S1 S2 S1 S3 S4
B2 B2 B2 B2 B2 B2
4

S5

B1 B2 B1 B3 B3 B3
5 9.9
S1 S2 S1 S3 S3 S3
B2 B2 B2 B2 B2 B2 B2
10 TRUSS DIAGRAM
4

0.5 0.8 0.8 1.1 1.1 1.3 1.3 1.3 1.3


29

11 TRUSS AND GUTTER DETAILS


4
B1 B2 B1 B3 B3 B3
6 BEAM DETAIL AT GIRDER SUPPORT E1 SCALE NTS
E1 SCALE NTS
S6 S7 S6 S8 S8 S8 E1 SCALE NTS

B4 B4 B4 B4 B4 B4 B4
6

B1 B2 B1 B3 B3 B3
3 BEAM SCHEDULE
S1 S2 S1 S3 S3 S3 100

B2 B2 B2 B2 B2 B2 B2
4

BEAM LENGTH WIDTH THICKNESS

900
B1 B2 B1 B3 B3 B3
2
4.5

576
B1 2.00m 0.20m 0.30m

1400
S1 S2 S1 S3 S3 S3 0.6 0.8 1 1 1.2

100
B2 B2 B2 B2 B2 B2 B2
4

B2 4.00m 0.20m 0.30m

500
B1 B2 B1 B3 B3 B3 469

1 1075

B3 3.00m 0.20m 0.30m 200

4 SECOND FLOOR FRAMING PLAN B4 6.00m 0.20m 0.30m


E1 SCALE 1cm:2m

DRAWN BY: PROJECT TITLE: SUBMITTED TO: SHEET CONTENTS: SHEET NO: RATINGS:

DENI ZUCHIWEI M. SANCHO SANCHO RESIDENCE PROF. RODEL C. ANGKAHAN


AS SHOWN
COURSE: BSCE SCHEDULE: F 1:00 PM - 4:00 PM FINAL PROJECT IN BSD INSTRUCTOR/BUILDING SYSTEM DESIGN
YEAR: 3RD YEAR SECTION: 3CE-4

Downloaded by Joell Jeff (joelljeff34@gmail.com)


lOMoARcPSD|1265725

SD SMOKE DETECTOR, HARD-WIRED TOGETHER

CM CARBON MONOXIDE DETECTOR


GAS STUB (SIZE AS REQ'D)
ELECTRIC SUB-PANEL

FAN
HOSE BIB
LEGEND
BIB

FLOOD LIGHT

FL CEILING MOUNTED EXHAUST FAN TO EXTERIOR FL WALL MOUNTED LIGHT FIXTURE

115 V DUPLEX RECEPTACLE @ +18" AFF. U.O.N. FL WALL MOUNTED EXTERIOR FIXTURE, DOWNCAST
115 V GFIC DUPLEX RECEPTACLE

AFCI WP GFI
CEILING MOUNTED PENDANT FIXTURE
115 V WATER PROOF GFIC OUTLET
FL CEILING MOUNTED LIGHT FIXTURE
115 V ARCH FAULT CIRCUIT INTERRUPTER
OUTLET

2
2-WAY SWITCH
CEILING MOUNTED FAN w/ LIGHT FIXTURE
FL
3
3- WAY SWITCH PROVIDE SEPARATE SWITCH FOR FAN & LIGHT
SINGLE POLE SWITCH
5 GROUND ROD WELL DETAILS
6 POWER SINGLE LINE DIAGRAM
FL RECESSED CAN LIGHT FIXTURE, FLUORESCENT
FL
E1 SCALE NTS
E1 SCALE NTS
FL RECESSED CAN LIGHT FIXTURE, STD RECESSED 2X4 FLUORESCENT LIGHT FIXTURE

A B C D E F G A B C D E F G A B C D E F G A B C D E F G
18 18 18 18
2 4 2 3 3 3 2 4 2 3 3 3 2 4 2 3 3 3 2 4 2 3 3 3

8 8 8 GFCI
WP WP
8 WP WP WP
GARDEN 12
FL FL FL FL FL FL FL FL FL

GARDEN 7
4

4
LPP
LAUNDRY

GFCI
LPP 6 DINING TERRACE
KITCHEN DINING TERRACE
7 7 7 7
FL
LPP
AREA
FL FL FL

LAUNDRY
FL FL
FL
AREA
KITCHEN LPP

5
4

4
FL FL FL FL FL FL FL FL FL

6 6 6 6
3

UP DOWN WP
UP WP
DOWN
FL FL FL FL
LPP LPP
FL FL FL FL FL FL

4 11
4

4
BEDROOM 2
BEDROOM 4 BEDROOM 2 BEDROOM 4
5 5 5 5
FL FL FL FL FL FL

3 10
WORKOUT DANCING LPP WORKOUT LPP
DANCING
AREA AREA
FL FL

SPACE SPACE
4

4
29

29

29

29
FL FL FL FL
WP WP

4 4 4 4
2 2

FL FL

FL FL FL FL

BATHROOM 1 HW BATHROOM 2 BATHROOM 1 HW BATHROOM 2


6

6
2 2

FL FL

3 3 3 3
FL FL FL FL

FL FL
FL
FL FL
FL
WP WP
2 2

LIVING
4

4
ROOM
FL FL FL FL
LPP LPP
BEDROOM 1 2 9
2 FL FL FL LIVING ROOM
2 FL
BEDROOM 3
FL FL
2 BEDROOM 1 2 BEDROOM 3
1 8
FL FL FL FL
LPP LPP
4

4
FL FL FL FL
WP WP

1 2

1 2

1 1

1 GROUND FLOOR LIGHTING LAYOUT 2 SECOND FLOOR LIGHTING LAYOUT 3 GROUND FLOOR POWER LAYOUT 4 SECOND FLOOR POWER LAYOUT
E1 SCALE 1cm:1.5m E1 SCALE 1cm:1.5m E1 SCALE 1cm:1.5m E1 SCALE 1cm:1.5m

DRAWN BY: PROJECT TITLE: SUBMITTED TO: SHEET CONTENTS: SHEET NO: RATINGS:

DENI ZUCHIWEI M. SANCHO SANCHO RESIDENCE PROF. RODEL C. ANGKAHAN LIGHTING LAYOUT
POWER LAYOUT
COURSE: BSCE SCHEDULE: F 1:00 PM - 4:00 PM FINAL PROJECT IN BSD INSTRUCTOR/BUILDING SYSTEM DESIGN
YEAR: 3RD YEAR SECTION: 3CE-4

Downloaded by Joell Jeff (joelljeff34@gmail.com)


lOMoARcPSD|1265725

A B C D E F G A B C D E F G A B C D E F G A B C D E F G
18 18 18 18
2 4 2 3 3 3 2 4 2 3 3 3 2 4 2 3 3 3 2 4 2 3 3 3

WM
8 8
SINK SINK

4
7 7

4
UP 6 UP 6

4
4

5 5 5 5

4
4

29

29
29

29

4 F 4 F 4 4
SINK SINK SINK SINK
SEPTIC TANK
WC WC WC WC

6
5
6

FD FD
SINK SINK SINK SINK

BT BT BT FD BT FD

3 3 3 3

4
4

2 2 2 2

4
4

1 1 1 1

1 GROUND FLOOR WATERLINE LAYOUT 2 SECOND FLOOR WATERLINE LAYOUT 3 GROUND FLOOR SANITARY SEWAGE LAYOUT 4 SECOND FLOOR SANITARY SEWAGE LAYOUT
P1 SCALE 1cm:2.0m P1 SCALE 1cm:2.0m P1 SCALE 1cm:2.0m P1 SCALE 1cm:2.0m

DRAWN BY: PROJECT TITLE: SUBMITTED TO: SHEET CONTENTS: SHEET NO: RATINGS:

DENI ZUCHIWEI M. SANCHO SANCHO RESIDENCE PROF. RODEL C. ANGKAHAN


AS SHOWN
COURSE: BSCE SCHEDULE: F 1:00 PM - 4:00 PM FINAL PROJECT IN BSD INSTRUCTOR/BUILDING SYSTEM DESIGN
YEAR: 3RD YEAR SECTION: 3CE-4

Downloaded by Joell Jeff (joelljeff34@gmail.com)