Following is the Quotation for Interior work For - kalyan

ITEM UNIT QTY RATE AMOUNT


A FURNITURE

1 TV unit 9x7 Sq.Ft 56 1500 84000


2 Safety Door 7 x 3 =21
3 x3= 9
2 x 9 = 18 = 48 Sq.Ft 48 1500 72000
3 Main Door 7x4 Sq.Ft 28 1200 33600
Door framing 5 Sq.Ft 14 850 11900
4 Toilet Door's 7 x 4 x 2no. Sq.Ft 56 550 30800
5 Wardrobe 9 x 7 =63
7'1 x 8 = 56'8
9 x 5 = 45 = 164'8 Sq.Ft 164.8 1500 247200
6 Bed 6.5 x 6 Sq.Ft 39 1800 70200
Bed Head Board 6 x 2.5 Sq.Ft 15 850 12750
7 Study Table 3' x 2.5 Sq.Ft 7.5 1000 7500
TOTAL 569950

A2 Kitchen Furniture
1 Platform Furniture 9 x 2.5 Sq.Ft 22.5
2 Service above Platform 9 x 2.5 Sq.Ft 22.5
3 Loft Upon Platform 5.8 x 2.5 Sq.Ft 14.5
4 Service Platform furniture 5.8 x 2.5 Sq.Ft 14.5
5 Storage Ceiling Side 9x3 Sq.Ft 27
6 Storage Ceiling Side 5.8 x 3 Sq.Ft 17.4
Total Sq.Ft 128 2500 320000
7 Hardware Costs 150000
Complete Kitchen Funiture 470000

B CIVIL WORK

1 Actual Flooring Area Sq.Ft 723.5


2 Skirting Sq.Ft 144.4
3 Common Bathroom Area Sq.Ft 227
4 Window Sq.Ft 21
5 Master Bedroom .Area Sq.Ft 371.9
6 Window 21 x 2 no. Sq.Ft 42
7 Kitchen Wall Tile Area Sq.Ft 275
8 Flooring Tile Area Sq.Ft 63
9 Granite Platform
Main Platform Sq.Ft 20.24
Service Platform Sq.Ft 34.74
10 Window Framing Working
Living Granite Frame R.Ft 100
Bedroom Granite Frame R.Ft 80
Bedroom Granite Frame R.Ft 90
Complete Civil Work 450000

B2 Demolition Work
Entire Flat Flooring
Kitchen Demolition
Lumsum 140000
Bathroom Demolition
Desposal of Debries 6th floor to Gr.floor from stairs

C PLUMBING WORK

Material - UPVC Tubes & Elbows Fittings


Flush Tank
Commodes 2 No.
1 WashBasin 2 No. 140000
Kitchen Sink 1 No.
Consealed Flush tank
Water Tank
Plumbing Labour 55000
Total 195000

D GRILL WORK

1 Box Grill + Extensions 74000


2 GI Holding shade to all grills 35000
Total 109000

E ELECTRICAL WORK

1 Material cost = Junctions + MCBs 75000


2 Switches 25000
3 Lights 28000
4 Electrical Labour 65000
Total 193000

5 False Ceiling Work Sq.Ft 1013 125 126625


6 PVC Ceiling Bathroom & Balcony Work Sq.Ft 128.2 200 25640
7 Painting Work Sq.Ft 2506 43 107758
8 Polish Work Lumsum 10000

F Sofa Set Lumsum 75000


G Inverter 24000

GRAND TOTAL ₹ 24,95,973


IN WORDS : TWENTY FOUR LAKH NINTY FIVE THOUSAND NINE HUNDRED SEVENTY THREE