1 Demoltion work
Removing tiles at toilet floors, Kitchen area, windows
and Brick wall
35000
sweeping up the entire waste from the area.(include
Lumpsum
tractor loading)
Labour charge for loading & Unloading (include rental
mechines)

2 Civil works & Plumbing


115mm thk 9' ht Brick wall include all materials like red
1600 Sq.ft 360 576000
bricks, cement & Sand.
10mm thk plastering (1:4) on both side of wall labour
3200 Sq.ft 150 480000
charges.
Waterproofing grouting for toilets 400 Sq.ft 110 44000
as per
75mm thk.8'ht Cement board partiotions with installation 600 Sq.ft 170 102000
design
Total 1202000

3 Plumbing works
Toilet equipment like taps, wasbasin, Kitchen sink & wc
150000 Lumpsum
etc (Kerovit/ Cera/Jaquar)
Plumbing works with material like pipe connection for
45000
washing michine and 5 nos of drain traps in toilets

4 Tile area 7140 Sq.ft


Tiles cost approximately 8,50,000 Lumpsum
Tile laying, kitchen & toilet wall tile installation with grout
finish and bonding materials not include like laticrete, 6430 Sq.ft 40 257200
grout, cement and dust.
20mm thk. Polished steel gray granite work at kitchen
area with material 85 Sq.ft 350 29750

20 kg MYK laticrete tile grout 170 bags 650 110500


Total 397450

5 False celing work


False ceiling area 2400 sq.ft include ground floor, first as per
and second floor with material like gypsum boards & 7000 Sq.ft 55 385000 basic
aluminium channel. design
PVC panels are not include the cost
Total

6 Glass works
10mm thk.8' ht toughen glass partition with sliding door
1200 Sq.ft 1100 1320000
with installation
Total with material
7 Electrical Works
a labour work 45000
As per
b Switches,wiring, Ceiling lights & profile lights 500000
design
7a Centralised Ac with duct service 2000000

7 Furniture
work stations, seats with pedestal storage 78 nos
10'x4'size conference table, 2 nos of meeting table with
chairs 2600000 lumpsum
Desk with side runners for each cabin 5 nos
chairs at pantry area 25 nos
A+L Studio architects 14th March 2023

9 Carpentory work
Cupboards at kitchen area, toilets and storage cabin
Cub.ft
etc as per design

Doors, Reception desk, Sofa as per design


15,00,000 As per
include labour work with material like ply wood (green
design
ply/duro), laminates (royal touch/ merino / sunmica),
hardware (hettich / hafele /titus) and edgebands.
HPl boards for toilets
Material warrenty on client name
10 Painting works with material emulsion/ enamel 8000 sq.ft 30 240000
With putty 2 times, primer coat 2 times and final coat 2
times
colors will be finalized by architect/ client

11 Consultance charge 350000


Preparing concept plans in 2d
interior 3d Views
Preparing working drawings, co ordinarion with vendors
& Consultants, Site supervision etc
Selecting materials like laminates, tiles , colors & lights
etc

Payment method
An advance of 40% of the total fee to be released of total budget.
After finished civil works 40% of the total fee to be released
Before interior starting 20% of the total fee to be released
The service charges are applicable 18% extra of that total fee or as per Government rules in force at that time.(Gst:
xxxxxxxxxxxxxxxxxxx61)
Terms & Conditions
Architect designs & drawings will be followed.
Materials/color’s/brands will be finalized by architect.
Loading & Unloading charges will not include above cost.
Client must take permissions & approval from Associations/ building owners
Water & power must be set up by the client at site area.
Chimney / Hob or any other Kitchen appliances are not include in the quotation.
Client / Architect won’t be responsible for any damage or accidents in the location.
Please maintain safety measures to avoid accidents and damages.
The task should be finished in three months.