Quotation

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

S/N

Description of works Part One - GENERAL WORKS A 1 2 3 4 General Works Remove and dispose living and dining area floor tiles and skirting. Remove and dispose kitchen and service balcony area floor tiles . Loading and unloading of building materials. Clearing of debris for entire project/protection works. (Haulage of sand subjected to HDB haulage contractor)

Unit

Qty

Price($)

Ls

1,750.00

B Wet Works 1 Supply and lay homogenous floor tiles at living and dining area. 2 Supply and install homogenous floor tiles at kitchen and service balcony.c/w waterproofing system 3 Supply and construct 50mm kitchen cabinet base. 4 Supply and construct 50mm washing machine base with tiles finish. 5 Supply and install shower kerb for both bathroom.(50mm height,width 60mm) 6 Supply labour to change wall tiles at kitchen.(For conceal wiring) C Plumbing Works Kitchen 1 Supply labour to install kitchen sink and tap at kitchen. 2 Supply labour to install washing machine and all basins pvc outlets. Bathrooms 3 Supply labour to install basin tap at both bathroom. 4 Supply labour to install central heater.

Ls Ls Ls Ls Ls Ls

280sf

$ $ $ $ $ $

2,180.00 1,300.00 350.00 120.00 220.00 250.00

Ls Ls Ls Ls

1 no. 1 lot 2 no. 1no.

$ $ $ $

80.00 80.00 80.00 120.00

D Other Works 1 Supply labour and materials to provide acid wash and general cleaning for whole house. 2 Supply and install frameless top hung sliding door shower screen at master bathroom. 3 Supply and install frameless top hung corner entry sliding door shower screen at common bathroom. 4 Supply and install powder coated 4 panel sliding window with green glass at service yard. 5 Grind and varnish existing 3 bedrooms parquet flooring. 6 Supply labour to stain existing skirting to dark walnut at living area. (Remove and reinstall) 7 Supply and install parquet flooring at new platform at master bedroom. 8 Supply and install 10mm tempered glass swing door at kitchen entrance.(H-handle) 9 Supply and install tempered glass fixed panel at kitchen cabinet edge. (600mm x 1700mm) Frosted glass E Electrical works (Estimate)

Ls Ls Ls psf Ls Ls Ls Ls Ls 40sf

$ $ $ $ $ $ $ $ $

200.00 600.00 690.00 640.00 500.00 280.00 850.00 550.00 230.00

1 Refer to annexe A F Painting and ceiling works 1 Supply labour and materials to paint whole house using ICI / Nippon paints including 2 Supply and install false ceiling at master entrance. 3 Supply and install vertical panel partiton at kitchen entrance for storage cabinet. 4 Supply and install horizontal L- box up at kitchen pipe. 5 Supply and install cove lighting L-box at living area as per design. 6 Supply and install box up above master vanity area. 7 Supply and install curtain pelmets. 8 Supply and box up specific aircon pipings.

2,876.00

Ls Ls Ls Ls Ls Ls Ls Ls Sub-Total for Part A

KIV $ $ $ $ $ $ $ $

150.00 250.00 250.00 380.00 160.00 400.00 280.00 15,816.00

Part TWO - FIXTURES & FITTINGS G Carpentry Works Kitchen 1 Supply and install solid core plywood laminated bottom kitchen cabinet c/w white pvc interior. (as per design) c/w ( abs trimming door.) Include 4sets blum retractable drawer tracks. (34.5" height from floor to top.) c/w soft closing hinges. (To use profile handles) pfr 2 Supply and install solid surface kitchen worktop. (greenish colour) pfr 3 Supply and install wooden platform at master bedroom.(2.7m x 2.8m) 4 Supply and install solid core plywood laminated wardrobe with swing doors at master bedroom.All abs trimming doors. Use top hung track. 5 Supply and install solid core plywood laminated wardrobe with swing doors at master bedroom platform.All abs trimming doors.(400mm depth) Use top hung track 6 Supply and install 1 unit bedside table at master bedroom. 7 Supply and install vanity wall hung cabinet,solid surface top and mirror panel at common bathroom and master bathroom 8 Design and fabricate laminated full height shoe cabinet at living area. 9 Supply and install storage cabinet shelves with full panel door at kitchen entrance area. 10 Supply and install bedroom 2 TV console and side cabinet. 11 Supply and install side ledge and shelf at master cabinet area. Ls 17ft $ $ 1,190.00 980.00 17ft $ 2,550.00

pfr pfr Ls Ls pfr Ls Ls Ls

6ft 9ft 1 unit 6ft 6ft

$ $ $ $ $ $ $ $

1,620.00 2,250.00 280.00 1,560.00 1,500.00 380.00 1,200.00 280.00

Sub-Total for Part B Total (A+B)

$ $

13,790.00 29,606.00

E. & O.E Contract does not include 3rd party fee unless stated. Inclusive HDB permit application