Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

SHORT

Download as pdf or txt
Download as pdf or txt
You are on page 1of 10

PROJECT PROPOSAL

PROPER DESIGNATED TRASH


CANS FOR WASTE MANAGEMENT

John Vincent C. Manila


BSEE-1A

NSTP CWTS
TABLE OF CONTENTS:

NAME OF ACTIVITY:
RATIONALE:
OBJECTIVES:
TARGET PARTICIPANTS:
PROCEDURE:
WHERE:
WHEN:
MATERIALS:
EXPECTED OUTPUT:
NAME OF ACTIVITY:

GENERAL CLEANING AND PLACEMENTS


OF SACK BAGS IN SEVERAL
NEIGHBORHOODS TO SERVE
AS A SUBSTITUTE FOR THEIR NORMAL
TRASH CANS.
Rationale:
Improper waste management is one of the main problems every
community faces. A prime example is Barangay Maroroy wherein the
collection of garbage trucks only happens once a week. This only means
that households must throw their garbage or else it will be piled in their
home, which results in improper waste disposal.

I will conduct a series of general cleaning and placements of sack


bags in neighborhoods in chosen streets in Barangay Maroroy ; that will
serve as their temporary trash cans until the garbage truck has arrived to
collect their waste.
Objectives:
The purpose of this activity is to encourage every individual living in a community
to maintain cleanliness as well as proper waste management, by placing temporary sack
bags that will be labeled out as biodegradable, nonbiodegradable and recyclable. This
will help them practice the proper management and segregation of wastes.

Specific Learning Objectives


At the end of this campaign, students must be able to:
A. Identify the specific streets in Barangay Maroroy,Daraga,Albay that are most in
need of segregated trash cans.
B. Self-reflect on the importance of a clean surroundings and the significance of
being an aid to a community, by performing civic services.
C. Improve the cleanliness and discipline of individuals by being
responsible to their trashand surroundings.
Target Participants:
The Target Participants are the residents of
Barangay Maroroy, Daraga, Albay.
Procedure:
In order to achieve the objectives, I constructed a
time frame that stated the flow of my project.

Planning - Brainstorming of ideas through the internet or make a research.


and start planning for the project.

Gathering - Gathering materials for the project such as trash bins, sack bags,
brooms, dustpans, cleaning materials and other things necessary for the
execution of the project.

Applying - Having a brief visit to Barangay Maroroy to be able to decide which


streets are the most in need of the civil service and finally, executing the
project to the target community. (With the proper practice of social distancing,
wearing masks and other personal protective equipment and observing
utmost caution in this crucial situation.
Where:
Barangay Maroroy, Daraga, Albay

When:
March 2023

Materials:
The Materials needed for the project such as trash bins,
sack bags, brooms, dustpans, cleaning materials and other
things necessary for the execution of the project.
Expected Output:

Proper waste removal helps improve


air and water quality as well as reduces
greenhouse gas emissions.
It helps in minimising the extraction of
resources along with reducing pollution
and energy consumption which is
associated with manufacturing new
materials.
THANK YOU

You might also like