CV 2023
CV 2023
CV 2023
General information
NAME : AMIT KUMAR SAH
NATIONALITY : INDIAN
Experience summary.
Career:
A competent professional with 14 years of experience in executing various Asset Integrity
maintenance and Quality assurance activities for enhancing the effectiveness in multiple
domains.
Certified Sr. Welding Inspector - PQR /WPS Preparation, Review, Approval, Welder
Qualification, Welding Inspection & NDE Inspection, RT Film interpretation, Hands own
experience in NDT Methods, Procedures of Advanced NDT technics
Certified API Inspector -Proven skills in Turn around Inspection of Above ground Storage Tanks,
Pressure vessels, Heat Exchanges and Piping. Comprehensive knowledge in preparing inspection
plans, inspection tests and Report documenting in adherence to procedures & specifications.
Knowledge on construction codes and inspection standards such as: API,ASME &ASTM
specification and BSEN Standards.
Certifications &Training.
API 653 -Authorized Tank inspector certification May 2023.
CSWIP 3.2 –TWI Senior welding inspector -3.2 .2,With RTFI-, 2022
ASNT LEVEL-2 in UT, RT ,PT, MPT- 2008
T-BOSIT, HUET, H2S,
MS OFFICE & EXCEL
TechnicalStrengths
Turn around Inspection of Above ground Storage Tanks, Pressure vessels, Heat Exchanges and
Piping.
On-stream/ External Inspections of fixed equipment- Visual, Painting, Insulation Inspection and
UTTG.
Tank - Out of Service/Turnaround- Bottom Plate Replacement, Maintenance
inspection/Supervision.
CURRICULUM VITAE
AMIT KUMAR SAH QA/QC ENGINEER
EXPERIENCE SUMMARY:
1. Employer : M/s Cape East Ltd, Doha Qatar
Company / Employer’s Profile:
Cape is an international leader in the provision of critical
industrial services like Mechanical tank, Piping &
structural, painting, etc. to the energy and natural
resources sectors.
Designation : QA/QC ENGINEER
DURATION : NOV 2018 ONWARD
SITE ASSIGNED: -
Responsibilities:
All Inspection Documents (Method statement of Tank, Piping ,ITP, NDT Procedure, Vacuum
box Procedure, Hydro test Procedure, PQR, WPS & WQT) are prepared, reviewed and
Submitted for client Approval.
QA/QC Documents (Project Quality Plan, Fabrication Inspection Procedure, Welding Control
Procedure, Welding consumable control procedure & Material Control Procedure ) are prepared,
reviewed and Submitted for client Approval.
Performed Initial Inspection of Tank and submit report to client for approval.
As per Client Recommendation next Tank Maintenances activities performed
CURRICULUM VITAE
AMIT KUMAR SAH QA/QC ENGINEER
Witness & Review the Initial Survey Report include Roundness, Plumbness and Shell Settlement
as per API 653.
After Door sheet welding carried out Peaking & Banding as per API 653.
Close monitored on activities of Fabrication, Erection & Installation as per Scope of Work &
Drawing requirement
Mechanical Inspection activity (Material Inspection, Consumable Inspection, Fit-up, Welding
inspection, NDT witness, Hydro test and Painting) as per ITP is perform and as per Code
accepted.
Tank Integrity Inspection is carried out after all mechanical activity completed.
Employment History:
Responsibilities:
Preparation and Qualification of WPS & PQR as per the project Specification ,Conducting
Welder Performance Qualification Tests, and Certification, Inspection of joint preparation, weld
parameter & visual Inspection welding, Monitoring NDT activities for compliance with project
specification & Report verification, Monitoring production welders performance & repair
tracking ,Weld report documentation ,and other QC report documentation, Test pack preparation
with all the required documents
Responsibilities:
Verify Integrity of structure, piping and vessel connected Nozzles and piping with P & ID
/AFC Drawings, as per our contract and scope.
Check the straightness, levelness, alignments and plumbness of Structural Platform.
Submission of Inspection Document including Vessel Repair Procedure, ITP, NDT
Procedure, WPS & WQT, Hydrostatic Procedure, Flushing Procedure, Drain and Drying
Procedure, Method statement for Structural Work.
Inspect structural work Welding activity including fit-up, alignment, Plumbness, final visual
inspection and NDT as per AFC Drawing, Client specification and AWS D1.1.
Inspect Piping, Welding activity including fit-up, alignment, NDT witness, Hydrostatic test,
flushing, Drain & Drying as per AFC Isometric Drawing, client specification and ASME B31.3.
Inspect Horizontal Vessel welding activity including fit-up alignment, NDT witness, and
Hydrostatic test, Flushing, Drain and Drying as per AFC GA Drawing, Client Specification and
ASME Sec VIII div 1.
Closed all Punch items with respect to hydrostatic testing, Mechanical Completion and
Construction Completion before handover the Unit. Submit Final Dossier of Project.
CURRICULUM VITAE
AMIT KUMAR SAH QA/QC ENGINEER
Responsibilities:
Submitted Inspection Document included ITP, NDT Procedure, PWHT Procedure, WPS &
WQT, Hydrostatic Procedure, Flushing Procedure, Drain and Drying Procedure, Method
statement for Structural Work.
Inspected structural welding activity including fit-up, alignment, Plumbness levelness, final
weld visual and NDT as per AFC Drawing, Client specification and AWS D1.1.
Inspected piping and welding activity including fit-up, alignment, final visual, NDT witness,
Hydrostatic test, flushing, Drain & Drying as per AFC Isometric Drawing, client specification
and ASME B31.3.
Inspect Vertical Vessel and welding activity including fit-up, alignment, NDT witness, PWHT,
Hydrostatic test, Flushing, Drain and Drying as per AFC GA Drawing, Client Specification
and ASME Sec VIII div 1.
Closed all Punch items with respect to hydrostatic testing, Mechanical Completion and
Construction Completion before handover the Unit. Submit Final Dossier of Project.
Responsibilities:
Preparation and Qualification of WPS & PQR as per the project Specification ,Conducting
Welder Performance Qualification Tests, and Certification, Inspection of joint preparation,
weld parameter & visual Inspection welding, Monitoring NDT activities for compliance with
project specification & Report verification, Monitoring production welders performance &
repair tracking ,Weld report documentation ,and other QC report documentation, Test pack
preparation with all the required documents
Responsibilities
CURRICULUM VITAE
AMIT KUMAR SAH QA/QC ENGINEER
Inspection of Joint preparation & production welding, NDT co-ordination, and follow-up,
Weld report documentation, Repair tracking, execution of weld repair, Test pack preparation,
Line check and Punch listing, Witnessing pressure Test activities ,Punch point Reinstatements
Responsibilities:
Inspection of joint preparation & welding, Material Inspection for fabrication, NDT co-
ordination, Weld report documentation, , piping Inspection- Punch list ,Pre-commissioning
activities
Employer : INSPECTION NETWORK, THANE
Responsibilities:
Inspection of joint preparation & welding, Weld visual Inspection, NDT Inspection witness,
Material Inspection for fabrication, NDT co- ordination, Weld report documentation,report
reviews , piping Inspection- Punch list ,Pre-commissioningactivities