PNG Operational Performance
Growth backed by increased customer base and coverage area
FY 17 FY 18 FY 19 FY 20 FY 21 FY 22
0.88
0.78 0.81
0.80
0.72
0.67
FY 17 FY 18 FY 19 FY 20 FY 21 FY 22
3
3
Assets Overview
Sr. No. Assets Quantity (Nos.)
1 Steel Network 569 Kms
6 Compressors 346
7 Dispensers 961
14 Commercial & Industrial Installations 4488 (4106 Nos. of Commercial + 382 Nos. of Industrial)
19 CP - ER Probes 91
4
New Initiatives and Promotional Schemes – PNG
Customer initiatives
• Introduction of various promotional schemes to boost
registration, especially in gasified buildings such as Shubh Labh
scheme
• Launching of uploading self-meter reading and bill generation
services
• Multiple digital payment modes
Sales initiatives
• Introduction of various incentive schemes to boost registration,
especially in gasified buildings such as Peak 70 and Udaan.
• For both gasified and non-gasified buildings “Mera Target Meri
Gaadi”
• Introducing Sales Team Management App for better monitoring
of marketing agencies
Receivables Management
• Introduction of new payment modes such as Pay by Link and QR
code
• Start of outbound calling to augment collections in non-due
segment
• Diaphragm meters with G size 1.6 have been replaced with either smart diaphragm
meters (1400 nos.) or smart thermal mass meters (100 nos.)
• Economics
• Network Issues
• Issues with logistics and availability of electronic components owing to the pandemic
and war situation
10
Project Highlights
• Conversion of first Commercial-A Customer (M/s SWAD Restaurant ) at
Ulwe area in GA-III on 07.07.2022
• Commissioning of DRS in Badlapur MIDC East (DRS no -143) which enabled
Looping of DRS 143 with DRS 136 (Addl Ambernath MIDC DRS) in
Sep’2022.
• Completed Augur boring job for railway crossing at New Panvel and
ensuring gas availability for Domestic customers in New Panvel area in
Aug’2022.
• First Domestic Conversion successfully completed in Karanjade area of KPT
zone (GA-II) on 14.10.2022.
• Highest ever connectivity number (LIV) in a single month! In November
2022, we achieved 34,207 connectivity number (LIV). The earlier highest
LIV number was 33,396 achieved in March 2022.
• Fastest ever Connectivity of 2,00,000 numbers on 18th Dec’2022.
• CGS Savroli- CNG/LNG facility technically completed. Expected
commissioning by 31st Dec’2022.
• Completion of critical pipeline connectivity at IIT powai. This would
facilitate security of supply between Eastern and Western parts of
Mumbai city i.e. Vikhroli - Goregaon looping.
Project Highlights
Commissioning of STEEL LINE FROM PAYADE HOTEL, MIRA ROAD TO DRS
104, BHAYANDER WEST AREA- This ensured,
Commissioned 8” NB & 6” NB steel line – 2120 mtrs,
Replacement of DRS 104,
CWIP liquidation of Approx. Rs. 1.5 Crores more than 7 years old.
Augur boring job to lay 2 Nos. casing of 18” and 12” was commenced from 15th
Oct’22 and got successfully completed in first week of Dec’22. This will pave way
for a new CNG station in Sec-2 along with a domestic front of approx.14000 Nos
in Ulwe area.
Laying and commissioning of GAIL pipeline having length of approx. 550 mtrs
from GAIL SV01 to CGS Savroli including hookup with tapping point inside GAIL
SV station.
Laying of steel pipeline network from CGS Savroli to Khalapur Naka (old Mumbai
Pune Highway- NH4) for the length of 4.1 Kms including crossing of Patalganga
River of span 200 mtr. and critical road crossing near Khalapur Village of span
323 mtrs. Network is tested and ready for commissioning.
MGL – PNG Targets
Till 31.01.2023 FY 2023-24
14
Operations – Zone & Districts
Mira Road
Thane
Charkop
Ambernath
Kandivali
Mulund
Laxmi Chakala
Mahape
Taloja
Bandra Sion Sanpada
Uran
Tardero
Geographical Area-1
Geographical Area-2 & 3
Central Zone South Zone Western Zone
15
Maintenance Philosophy
PNG Assets:
16
Zone Operations-PNG
District Activities:
Attending emergencies within stipulated time period
Resolution of PNG and CNG (Dispenser) complaints
Co-ordination with BMC, MMRDA and other utilities/contractors to minimize PE & steel line
damage
Ensuring 100% patrolling on PE and steel network
Daily DRS Monitoring
PE /Steel Valve Chamber Cleaning activity
Monitoring performance of odourant at extreme locations of pipeline network
Commissioning of new pipelines, DRS and Commercial customers in co-ordination with
planning and project department
Executing MP, LP leak survey as per schedule
Involvement in internal and external audits
Preparing and maintaining documents
Emergency PE Line Diversion
17
Centralized Teams-PNG
Steel Execution Monitoring & Control Room
Steel Line Diversion
Process Monitoring
Steel Line Patrolling
Internal and External Audit Compliance and
Preventive Maintenance of Steel Valves (Half Tracking
Yearly)
Emergency Control Room
CP Monitoring & Maintenance
LUAG Monitoring
Installation of TCP & PCP systems to
protect pipeline against corrosion MIS Reporting
Preventive & Breakdown Maintenance of
CP system Training
Regular monitoring of pipe potential
readings
Carrying out CP adequacy surveys
Coating defect rectification
Analyzing & mitigating interferences over
pipeline
Internal Corrosion monitoring
18
Emergency Preparedness & Response System
Mitigation of Emergency
MARG Membership
21
Site Challenges
General Operational