Energy and Petroleum Regulatory Authority Commencement of work notice

NO. CWN/KPLC/532092/2023

COMMENCEMENT OF WORK NOTICE

To:- THE KENYA POWER AND LIGHTING COMPANY P.O BOX 30099 - 00100 NAIROBI

In accordance with Rule 8 of Electric Power (Electrical Installation work) Rules 2006, I/We hereby give
notice that the undermentioned work in connection with the installation at the premises of:

Name Hunan Road & Bridge Construction Group Company Limited

Address P.O BOX 12293 - 00100 Nairobi

Situation of property Shanzu

Longitude: 39.740 Latitude: 3.973

Land Office reference No: N/A

Nature of work New Installation No. of Installations: 3

I/We propose to commence the work on 2023-01-31

Proposed situation of meter-board(s) in the case of a new installation or if the site of an existing board is to
changed OUTSIDE

(A plan of the premises indicating the proposed meter position should be attached) I confirm that an
"Enquiry for A Supply of Electricity" form has/has not been completed.

Service Line Ref No: N22112022090003

Signature (of the Licenced Electrician)........................Electrical Contractor's stamp............................

Electrical Contractor's Name SANJUD CONTRACTORS LIMITED

Licence Class. Class A-1 Licence No. EPRA/EC/03046

Address 80102 - 93781

N:B This Notice should be sent to the above power supplier as soon as work on the installation is started.

Page 1
Energy and Petroleum Regulatory Authority Completion Certificate

NO. CC/KPLC/532092/1535796/2023

THE ELECTRIC POWER (ELECTRICAL INSTALLATION WORK) RULES 2006

Completion Certificate

To:- THE KENYA POWER AND LIGHTING COMPANY P.O BOX 30099 - 00100 NAIROBI

(Name and Address of authorised distributor or Electrical Inspector)

I/We hereby give notice that the undermentioned work in connection with the installation at the premises
of:

Name Hunan Road & Bridge Construction Group Company Limited

Address P.O BOX 12293 - 00100 Nairobi

is now completed and ready for testing and connection.

A service line is/is not required. Service Line Ref No: N22112022090003

Details of installation (stating if new or additional) This is a New Installation of Hunan R&B
Construction Ltd : 3 phase installation for a yard

The work has been carried out and tested strictly in accordance with the Energy Act 2019 and
Rules/Regulations for the time being in force thereunder. An installation Test Certificate to this effect is
attached hereto:-

Name of Licensed Electrician

Name Samuel Njuguna Ngugi Class A-1 Licence No. EPRA/EW/07332


(Signature of Licenced
..............................................
Electrician)
Electrical Contractor SANJUD CONTRACTORS LIMITED Class A-1 Licence No. EPRA/EC/03046
Date: 2023-01-30 23:29:32.533

Electrical Contractor's Stamp and Date

(For office use by Power Utility/Supplier)

Installation Report No. .............................................Date....................................................................

N.B. Any person who submits a Completion Form which is false in a material particular is liable to
prosecution

(Vide Rule 10 of Electric Power (Electrical Installation work) Rules 2006.)

Page 1
Energy and Petroleum Regulatory Authority Completion Certificate

Installation Test Certificate


1 Earth Resistance Test (Ohms) 3
2 Insulation Resistance test between phases (MegaOhms) 85
3 Insulation Resistance test phase to neutral (MegaOhms) 75
4 Insulation Resistance test Neutral to Earth (MegaOhms) 70
5 Insulation Resistance test Earth to phase (MegaOhms) 75
6 Continuity of CPC Conducted? Yes
7 Polarity test conducted? Yes
8 Earth loop impendance test, Zs (Ohms) 0.3

Page 2