I. GENERAL
1. The project shall be built in line with the plans and specifications of the techniques or
procedures stated herein.
2. The owner or his authorized representative, along with the contractor, will oversee the
project overall.
3. The construction of the project shall be done in accordance with the sound and accepted
engineering practice and in conformity with the existing building codes and regulations.
4. The owner or his duly authorized representatives shall be allowed to inspect the progress
of the work accomplishments and decide on matters in conflict which may seem inconsistent
to the contractor.
1. STAKING: Fill staking of the building shall be done by the contractor with the presence of
the owner or his duly authorized representative.
2. EXCAVATION: The contractor shall make all the necessary excavation for the foundation
to grades indicated in the plans; the bottom of excavation for foundation and footing shall be
free of water before placement of reinforcing bars and pouring of concrete.
3. BACKFILL: Fill materials shall be select burrow from wood stumps, roots, or other foreign
matters, property tamped to achieve sufficient loan bearing capacity for concrete floor slabs.
4. Filling shall be done only when the concrete for foundation has set sufficiently so as not to
impair its strength.
1. Wood must be well-seasoned, devoid of big, loose, or unstable knots, saps, fractures,
shakes, or other flaws that might reduce its strength, longevity, or aesthetic appeal. It must
also be of the appropriate types needed for the various sections of the project. The designs
may include some preliminary measurements for some structural and framing lumber.
However, all exposed woodwork has to be sandpapered and smoothed up as needed.
2. All lumber in contact with masonry shall be painted with an approved wood preservatives
and termites proofing compound.
V. ROOFING
1. Roofing shall be of Ribtype Profile Longspan Coloroof (8 ft x 1 m x 0.4mm) sheets and its
equivalent flushing securely fastened to edges of fascia.
VI. PLUMBING
1. Plumbing work shall be in accordance with the plan. It includes installation of soil pipes,
septic tank, accessories, floor drains, kitchen sink, water supply pipes, drainage pipes, etc.
VII. ELECTRICAL
1. All electrical installations shall be made or done in accordance with the rules and
regulations of the National Electrical Code of the Philippines.
2. All electrical installation shall be done be experienced electricians only under the
supervision of a Licensed Electrical Engineer.
3. All wires embedded on concrete must be in PVC conduit pipes or its equivalent and all
intersecting wires must be insulated with electrical tapes.
4. Fixtures and accessories must be brand-new, no cracks and other defects to avoid
electrical shocks and accidents.