For Office Use :

APPLICATION FOR ELECTRICITY SUPPLY CA No.:


SR No.:

Please note that only submitted application with complete and correct information will be processed.

PART 1 : TO BE COMPLETED BY APPLICANT

For Application Under Individual Name :


Name of Applicant : NG HUAN NEE MyKad / Pasport : 761117-07-5097
(Mr/Mrs/Ms) MR.
("the Consumer")

Mother's Name : Date of Birth : 17-Nov-1976


(For Security Verification) (Below 18 years is not entitled to apply)

Next Of Kin : Next of Kin Phone No :


(The person as an alternative to be contacted if we are unable to reach you)

Home/Office No. : Fax No. :

Mobile No. : 0164461188 Email : hnng6138@gmail.com

Communication Options: Letters Email Both

Billing Delivery Options: Byhand Post Email


(Please select one (1))

Details of Premises
a. Address of Premises : M TREE HILL, 9-6-2, LORONG SUNGAI BATU 3A, SUNGAI BATU, 11920 PULAU PINANG, PULAU PINANG
(where supply is required)

("the Premises")

b. Premises Ownership Owned Rented

c. Premises Type : Residential Use - Residence description : Residence: Apt/Condominium (> 3 rooms)
(This activity will determine the (For example, Two storey terrace)
appropriate tariff)

Non-Residential Use Commercial Manufacturing Agriculture

Mining Streetlight

Main activity at premise:


(For examples: Bakery Shop, Sawmill, etc.)

d. Correspondence Address : M TREE HILL, 9-6-2, LORONG SUNGAI BATU 3A, SUNGAI BATU, 11920 PULAU PINANG, PULAU PINANG
(If different from premises address above)

e. Supply required date : 20-Jul-2023 (Electricity supply by TNB is subject to consumers’ site readiness)

TYPE OF APPLICATION * Please select ( / )

New Electricity Supply (Permanent) Temporary Electricity Supply

Additional Electricity Supply Estimated Supply End Date :

Change of Tariff (Do not fill section 2)


Others : Supply Application - Group Move In

APPLICANT'S DECLARATION
1. I / We hereby attest that the contractor appointed by me / us / the housing developer as stated herein is a contractor registered with Energy Commission. I / We also give permission to the contractor
to do all necessary works related to my / our application.
2. I / We hereby attest that the electrical wiring is in a good condition.
3. I understand and agree that as the registered consumer for electricity at the said premise I will be liable for any electricity consumed during the tenancy and/or occupancy period including any loss or
damage suffered by TNB as permitted under the Electricity Supply Act.
4. I agree to ensure the meter, TNB’s installation and/or equipment at the said premises is not tempered at any time during the tenancy or occupancy period except with a written approval from TNB.
5. I / We hereby acknowledge that all information given are true and accurate and TNB shall have the right to take any necessary action if the information given are false or inaccurate.
6. I / We agree to all the Terms and Conditions of Supply as attached herein ("The Terms and Conditions of Supply for Consumer")and it shall become part of a binding
7. I / We as the signatory below do hereby consent to TNB, its agents and / or its permitted assigns for collecting, recording, holding or storing my / our personal data in accordance to Personal Data
Protection Act 2010 for a lawful purpose or necessary for any matters related to electricity supply by TNB.
8. I / We acknowledge that the telephone number / mailing address / e‐mail address provided is true and accurate and TNB will be notified if there is any change in the information. My / our failure to
update the telephone number / mailing address / e‐mail address will not cause the TNB to be liable for any failure to deliver the notices under this Contract.

Name of Applicant:
Applicant's Signature / Company Stamp (signing for the company)
(whichever applicable) Designation :
Date : MyKad No :

Page1/1