Schneider National and Strategic Accounts Submittal Sample
Schneider National and Strategic Accounts Submittal Sample
Schneider National and Strategic Accounts Submittal Sample
Date:
Preliminary
Architect: TBD
# Change:
Engineer: TBD
Revision:
1
2
3
4
5
Project Number: TBD
5/26/2022
5/26/2022
5/26/2022
Date:
Date:
Date:
Drawing Index:
Designed by:
Software by:
Checked by:
Contractor:
Engineer:
Architect:
Page 000-2 Title Page 2 of 2 Page 408-1 Panel Wall Layouts
Page 101-1 Device and Equipment Legend Page 501-1 ADMIN Equipment Installation Details 1 of 3
Title Page 1 of 2
Page 201-1 PHX11 ADMIN Network Architecture Page 502-1 COLO-AHU Equipment Installation Details 1 of 2
Page 201-2 PHX11 COLO Network Architecture 1 OF 3 Page 502-2 COLO-AHU Equipment Installation Details 2 of 2
Page 201-3 PHX11 COLO Network Architecture 2 OF 3 Page 503-1 COLO Equipment Installation Details 1 of 7
Page 201-4 PHX11 COLO Network Architecture 3 OF 3 Page 503-2 COLO Equipment Installation Details 2 of 7
Page 301-1 ADMIN Systems Diagrams Page 503-3 COLO Equipment Installation Details 3 of 7
Page 302-1 COLO-AHU System Diagram Page 503-4 COLO Equipment Installation Details 4 of 7
Page 303-1 COLO System Diagram Page 503-5 COLO Equipment Installation Details 5 of 7
5/27/2022
5/27/2022
Last Printed
Last Saved
Page 401-1 ADMIN Floorplan Page 503-6 COLO Equipment Installation Details 6 of 7
Page 402-1 COLO 1 CELL 2 & 4 Floorplan Page 503-7 COLO Equipment Installation Details 7 of 7
Job Number
Sheet Number
File Name
000-1
Electric. Their use or reproduction without prior consent of
These drawings and designs are the property of Schneider
National And Strategic Accounts
Date:
Preliminary
Drawing Index:
Page 601-1 ADMIN Panel Power Detail Page 603-8 COLO 1 Panel Layout - Door
Page 601-2 ADMIN Panel IO Detail - 1 & 2 Page 605-1 SHELL Panel Power Detail
Page 601-3 ADMIN Panel IO Detail - 3 Page 605-2 SHELL Panel IO Detail - 1 & 2
# Change:
Page 601-4 ADMIN Panel IO Detail - 4 Page 605-3 SHELL Panel IO Detail - 3
Revision:
Page 601-5 ADMIN Panel Layout - Main Page 605-4 SHELL Panel IO Detail - 4
1
2
3
4
5
Page 601-6 ADMIN Panel Layout - Door Page 605-5 SHELL Panel IO Detail - 5
Page 602-1 COLO-AHU Panel Power Detail Page 605-6 SHELL Panel IO Detail - 6
Page 602-2 COLO-AHU Panel IO Detail - 1 & 2 Page 605-7 SHELL Panel IO Detail - 7
Page 602-3 COLO-AHU Panel IO Detail - 3 Page 605-8 SHELL Panel IO Detail - 8
5/26/2022
5/26/2022
5/26/2022
Page 602-4 COLO-AHU Panel IO Detail - 4 Page 605-9 SHELL Panel Layout - Main
Page 602-5 COLO-AHU Panel IO Detail - 5 Page 605-10 SHELL Panel Layout - Door
Date:
Date:
Date:
Page 602-6 COLO-AHU Panel IO Detail - 6 Page 606-1 ADMIN/AHU Panel Power Detail
Page 602-7 COLO-AHU Panel IO Detail - 7 Page 606-2 ADMIN/AHU Power Panel Layout
Page 602-8 COLO-AHU Panel Layout - Main Page 607-1 COLO Panel Power Detail
Page 603-1 COLO 1 Panel Power Detail Page 607-2 COLO Power Panel Layout
Designed by:
Software by:
Checked by:
Contractor:
Engineer:
Architect:
Page 603-2 COLO 1 Panel IO Detail - 1 & 2 Page 607-3 COLO Remote Power Panel Layout
Page 603-3 COLO 1 Panel IO Detail - 3 Page 608-1 DP Panel Layout
Title Page 2 of 2
Page 603-6 COLO 1 Panel IO Detail - 6 Page 610-1 Battery Room CO Panel Layout
Page 603-7 COLO 1 Panel Layout - Main
5/27/2022
5/27/2022
Last Printed
Last Saved
Job Number
Sheet Number
File Name
000-2
Input/Output Blocks & Reference Tags
Temperature Sensor Temperature Sensor Temperature Sensor Temperature Sensor Temperature Sensor Temperature Sensor Living Space Sensor Living Space Sensor Living Space Sensor Living Space Sensor Living Space Sensor Living Space Sensor Living Space Sensor DC Terminal
Duct Probe Averaging Insertion Outdoor Air Room Bulb (Strap-On) Blank Cover Blank w/PIR Set Point & Override Set Point, Override & PIR Set Point, Override & LCD Set Point, Override & Set Point, Override, PIR & Power Supply Block
Display Touchscreen Touchscreen
Date:
SaTmp MaTmp ChwSTmp OaTmp RmTmp DxSlTmp
Controller Controller Controller Controller Controller Controller ##
Preliminary
UI# RET UI# RET UI# RET UI# RET UI# RET UI# RET LSS# LSS# LSS# LSS# LSS# LSS# LSS#
~ +
~ - Grounding
GRN WHT GRN WHT GRN WHT GRN WHT + - GRN WHT
PS1 Block
TS# TS# TS# TS# TS# TS#
From: Controller From: Controller From: Controller From: Controller From: Controller From: Controller From: Controller
Differential Pressure Transmitter Differential Pressure Transmitter Gauge Pressure Transmitter Gauge Pressure Transmitter Differential Pressure Switch Differential Pressure Differential Pressure Switch High Static Limit Low Static Limit Separable Relay Circuit
3-Wire 24Vac (0-10Vdc) 2-Wire 24Vdc (4-20mA) 3-Wire 24Vac (0-10Vdc) 2-Wire 24Vdc (4-20mA) Transmitter Safety Switch Safety Switch Breaker
Set @ 1.0"
SaStPr SaStPr ExpTnkPt ExpTnkPr FinFilSts
# Change:
13 R# 14
Revision:
Controller Controller Controller Controller CB#
UI# RET UI# RET UI# RET UI# RET UIx RET
Hi Hi NC COM NC COM 9 5
X4H TBPA Y2- TBPA X#N TBPA Y2- TBPA H L L H
HSL# LSL# R#-1
X3H TBPA Y1+ TBPA X#H TBPA Y1+ TBPA DPT# DPS#
1
2
3
4
5
Set @ 3.5" Set @ 3.5" 9 1 Fused
OUT COM PWR OUT PWR WH/YL/GN BU/BK RED BU/BK RED 2-NC 1-COM
High Low High Low High High High Low Lo Lo R#-1 Switch
DPT# DPT# PT# PT# DPS#
12 8
R#-2
FS#
12 4
R#-2
CO2 Duct CO2 Room CO2 Outdoor Current Switch Current Switch Current Transducer Current Monitor Relay Current Switch Relay Point to Point Relay Field Relay Detail
5/26/2022
5/26/2022
5/26/2022
3-Wire 24Vac (0-10Vdc) 3-Wire 24Vac (0-10Vdc) 3-Wire 24Vac (0-10Vdc) 2-Wire 24Vdc (4-20mA) Reference
Output Input
RaCO2 RmCO2 OaCO2 SaFanSts SaFanAmp FR#
R Status
Controller Controller Controller Controller CS# Controller ##
FR#
UI# RET UI# RET UI# RET UI# RET UI# RET BLU
13 FR# 14
X4H TBPA X#N TBPA X#N TBPA Y2- TBPA Status R ORG YEL
X3H TBPA X#H TBPA X#H TBPA Y1+ TBPA Output Input
Date:
Date:
Date:
Current Transducer Panel Relay Fluid Type &
120 VAC
OUT GND V+ OUT GND V+ OUT GND V+ + - + - CMR# CSR#
WHT/BLU
WHT/YEL
WHT/BLK
24 VAC
Directional
CO2_# CO2_# CO2_# CS# CT#
Indicator
R#
CT# CMR# CSR# CHWS
13 R# 14
Valve Actuator 2-Position Actuator Floating Actuator Floating Actuator Proportional Actuator Proportional Actuator Tranformer Interlock
4-Wire 3-Wire 4-Wire 3-Wire Reference
Designed by:
Software by:
Checked by:
ACT ACT ACT
Contractor:
Engineer:
Architect:
BLK RED RED
CV# DprCmd DO# TB-PA X#N COM TB-PA X#N COM TB-PA X#H HOT TB-PA X#H HOT
RED BLK BLK XXX 1
Controller COM TB-PA X#H HOT TB-PA X#H Close ACT TB-PA X#N COM TB-PA X#N COM
RED YEL/blk GRY WHT
TB-PA X#H HOT Controller COM CCW Controller COM Open CtrlrName COM COM CtrlrName COM (Y1) AI
BLK BLU GRN/yel ORG WHT BRN
TB-PA X#N COM ACT DrvCls DO# CW DrvCls DO# ActPos UO# GND ActPos UO# (U) AO
GRN/yel GRN/yel YEL/blk BLU
GND DrvOpn DO# GND DrvOpn DO# AI L R CCW CW
Legend
2-Way Valve 3-Way Valve Fan Chilled Water Coil Heat Pump Coil Electric Heating Coil Dual Temp Coil Duct Humidifier Thermal Dispersion Airflow Opposed Blade Damper Butterfly Damper Insertion Impeller/Turbine Insertion Mag Meter Multi-Tap
Normally Closed Station Flow Meter Transformer
HEAT ELEC DUAL D1 FM# FM#
CV# CV#
N.O.
AB A AB A
See Valve Schedule GRY BRN
B PUMP HEAT TEMP
YEL BLU
See Valve Schedule
ORG
2-Way Valve Hydronic Pump Fan Array Hot Water / Steam Coil DX Cooling Coil Gas Heat Exchanger Hot Gas Coil Airflow Measuring Station VAV Air Flow Sensor Parallel Blade Damper Duct Air Filter Inline Flow Meter Inline Usage Meter
WHT
Normally Open or No Failsafe
BLK
CV# ChwP# DX GAS HOT D1
AFS1 PRI XFR# SEC
N.O.
AB A
See Valve Schedule FM# WM#
CLG HEAT GAS
5/27/2022
5/27/2022
Filter
Last Printed
Last Saved
Chiller Air Cooled Chiller Single Cell Cooling Tower Dual Cell Cooling Tower Fluid Cooler Boiler Shell and Tube Heat Exchnager Plate & Frame Heat Variable Motor Duct Smoke Detector
Exchanger Frequency Starter
CT-# CT-#A CT-#B FC-# Drive SD#
CH-#
Job Number
B-#
Sheet Number
HX-# (Add coil type)
File Name
101-1
SP1 L1 L2 L3 L1 L2 L3
M
Electric. Their use or reproduction without prior consent of
Standards and Symbols
• Should a situation arise wherein the rules and requirements in this drawing set are in direct conflict • All room thermostats/sensors/controllers shall be installed at 48" above finished floor for ADA • Refer to Customer’s master specifications section 25 05 00 for installation standards.
with a specific clause in the contract, NEC, or project specifications, said conflict will be resolved by compliance for new installations unless noted otherwise in the contract documents. For
the Schneider Electric project manager on a case-by-case basis. replacement of existing devices, leave sufficient rolled coil of wire above the ceiling should the • The master specifications are based on US codes and standards, namely ICC International Codes
device need to be moved down to meet this requirement in the future. Install one LON / BACnet / (Building, Plumbing, Mechanical, Fire), National Electric Code (NEC), Underwriter's Laboratory (UL)
• All work is to be installed professionally in a neat, workmanlike manner. When completed, all panels Infinet / I/P drop at t-stat per floor or wing. standards and certification directories, FM Global Property Loss Prevention Data Sheets and
and devices are to be cleaned (vacuumed), with all wire duct closed and no debris in the panel. approval guides, among others.
Panel is to be locked when applicable. • All panel keys will be collected daily and removed from the panels installed. These keys are to be
given to the project manager or Schneider Electric representative. • The specified codes and standards are considered minimum acceptable design standards. The
• No penetrations should be made into live equipment. When drilling into control cabinets (Schneider project A/E is responsible to review the master specifications in conjunction with local applicable
or otherwise) every effort should be made to protect the equipment inside from debris as a result of • All thermowells shall be filled with thermal conductive compound, prior to the sensors being codes and standards for the project site and identify applicable differences. In general, if an
this penetration; ideally penetrations should be made prior to installation of sub-panel/backplane inserted/installed. applicable local code or standard is less restrictive than specified requirement; comply with specified
and equipment. requirements. If an applicable local code or standard is more restrictive than the specifications;
Date:
• Wiring Terminations designated as ‘X’, ‘XX’ or ‘TBD’ indicate information was unavailable at time of comply with local applicable code. Review differences between specified and local applicable codes
• Unless specifically stated otherwise, the electrical subcontractor is responsible for the complete submittal. The electrical subcontractor shall document the final terminations for use in record and standards with Owner for resolution of which requirements to follow.
Preliminary
installation of all sensors, damper motors and supplemental devices. Any union or jurisdictional drawings.
overlap is the responsibility of the electrical contractor to resolve.
• Remote control devices, not in local panels, shall be accessible for adjustment and service - below
• It is standard industry practice for the BAS contractor is to be responsible for interlock wiring of 6' above finished floor whenever possible or as shown on the provided construction prints.
miscellaneous systems (i.e. Generator dampers, boiler interlocks, make-up water, refrigerant leak
alarm systems, fuel oil interlocks, booster/sump pump interlock wiring). The electrical contractor • Only prints marked Construction are to be used during installation. If the prints are not marked
should be aware of this and shall carry this work as part of their scope unless specifically instructed Construction, the installer will correct any discrepancies between prints used and Construction at no
otherwise in writing. It is understood that specific wiring diagrams for this equipment are often not cost to Schneider Electric.
available at time of bid.
• All new BAS controller panels shall have dedicated 120VAC power sources. This source shall be
• The electrical subcontractor will always follow all safety requirements based on minimum standards located and marked in the electrical and control panel as well as on the control prints returned to
set forth by Schneider Electric, The General Contractor/Construction Manager, Customer, and site. Schneider Electric for Record prints.
In all cases, the most stringent rules and regulations will apply
# Change:
Revision:
• The electrical subcontractor shall be responsible for maintaining the functionality of existing safeties
• It is the responsibility of the electrical subcontractor to provide a foreman for all work. The foreman after BAS installation – electrically or pneumatically connected. Schneider Electric will not bypass
is responsible for attending all applicable meetings (foreman meeting). The foreman is responsible any existing safety interlocks.
for coordinating with Schneider Electric field staff as well as other trades. The foreman is
1
2
3
4
5
responsible for providing manpower information to the Schneider Electric project staff on a daily • All field device cables and wires shall be labeled by the electrical subcontractor using Brady
basis. PermaSleeve or equivalent; cables and wires shall be labeled with its corresponding point name as
shown on the input/output block.
• Unless specifically instructed otherwise, it is the responsibility of the electrical subcontractor to
receive and store all material and to get it to the project site. • For VFD control wiring, use shielded cable and metallic conduit only. Do not run control and power
wiring in the same conduit. Separate metallic conduits carrying power wiring from conduits carrying
• Finally, it is the responsibility of the electrical subcontractor to mobilize to work when work is control wiring by at least 6". Separate existing, non-metallic conduits or cable trays used to carry
available to complete. It is understood that a construction environment can often be crowded and power wiring from metallic conduit carrying control wiring by at least 12". Whenever power and
5/26/2022
5/26/2022
5/26/2022
difficult place to work; this is not an excuse not to properly staff available work and complete within control wiring cross, the metallic conduits and nonmetallic conduits or trays must cross at right
schedule requirements. angles.
Date:
Date:
Date:
Pipe Color HEX Code RGB Code Color Abbreviations
Primary Chilled Water 3-Letter 3-Letter 3-Letter 2-Letter 2-Letter 2-Letter 1-Letter 1-Letter
Color Stripe
Caps Mixed Lower Caps Mixed Lower Cap Lower
CHWS 0000FF 0, 0, 255
Black BLK Blk blk BK Bk bk B b
Designed by:
Software by:
Checked by:
Contractor:
Blue BLU Blu blu BU Bu bu U u
Engineer:
CHWR 00CCFF 0, 204, 255
Architect:
Brown BRN Brn brn BR Br br N n
Secondary Chilled Water Gold GLD Gld gld GL Gl gl D d
Gray GRY Gry gry GY Gy gy A a
SCHWS 008080 0, 128, 128 Use
Green GRN Grn grn GN Gn gn G g
Lower
Orange ORG Org org OR Or or O o
5/27/2022
5/27/2022
Last Printed
H
Last Saved
SHWR F59D56 234, 157, 86
Low Pressure Steam A Actuator
LPS FFC000 255, 192, 0
F Flow Meter
Job Number
COND 000000 0, 0, 0
Sheet Number
GWS 800080 128, 0, 128
File Name
101-2
GWR D98CFF 204, 102, 255 BAS/AHU Control Panel
Make Up Water
MUW 996633 153, 102, 51 DP Panel
Electric. Their use or reproduction without prior consent of
Cable Specification
Date:
Input 22ga Minimum shielded, 600 V protection required for entry into VFD or other high voltage cabinets I/O 2-wire I/O Shielded 18/2 Shielded White KEL-W181P-2040B (5-9)
induction loads, high heat sources, or any equipment or wiring that could cause damage to
installation or interference with signals.
Preliminary
Output 18ga Minimum shielded, 600 V protection required for entry into VFD or other high voltage cabinets I/O 3-wire I/O Shielded 18/3 Shielded White KEL-W183C-2058B (5-9)
• Plenum wiring is not to be directly secured to ceiling grid or all thread.
I/O 4-wire I/O Shielded 18/4 Shielded White KEL-W184C-2059B (5-9)
Installation
• All wall and shaft penetrations will be fire stopped using approved fire stop 2-wire I/O
Network I/O 18/2 Non Shielded White KEL-W181P-2051RIB (5-9)
• All external penetrations (whether into structures, boxes or equipment) to be weather tight and Unshielded
protected as defined by the specifications and NEC. 3-wire I/O
CAT-6 CAT-6 as standard, unless otherwise called for by specifications I/O 18/3 Non Shielded White KEL-W183C-2052B (5-9)
• No splices unless specifically approved in writing by the Schneider project manager. Said approved Unshielded
splices to be clearly indicated on redline drawings with labeled junction boxes. NO COLOR 4-wire I/O
I/O 18/4 Non Shielded White KEL-W184C-2059B (5-9)
CHANGES AT SPLICES Unshielded
(3) (5-7)
Fiber Optic T-Stat S-Link 22/2P Non-Shielded Purple KEL-W221P-2005PRB
Fill and Spare Wire (9)
• All work is to include room for expansion and future changes as such, maintain no more then 2/3rd of (4) (5-7)
Fiber Optic Refer to job spec. for fiber type and ends T-Stat Sensor Bus 24/4P Non-Shielded w/PVC Blue KEL-W244P-2274BL
# Change:
max wires permitted in conduit. Larger or multiple conduit runs to be used to same location if 2/3rd (9)
Revision:
fill rule would be exceeded.
Network & Communication Cabling
• Spare wire to be included in conduit runs from BMS panels to any large equipment AHUs, fuel Pump
skids, cooling towers, Boilers, chillers, generator, etc. Spare Min of 1- shielded 18/4 cable. (1-2) (5-7)
Serial Communication (RS-485, Lon) Comm. BACnet 24/2 Shielded Lo Cap Orange KEL-W241P-2000FRIB
1
2
3
4
5
• Spare wire to be included in any long conduit runs from BMS panel serving multiple points in remote (9)
locations. Example: Basement to roof equipment. Spare Min of 1- shielded 18/4 cable. (2) (5-7)
Protocol Size Impedence Capacitance Maximum Length Comm. Modbus 24/2 Shielded Lo Cap Yellow KEL-W241P-2050FYLRB
• In the case of simple 2 conductor zone sensors, a minimum of a shielded 18/4 is to be pulled unless (9)
otherwise specified (3) (5-7)
BACnet 22/24 awg 120 Ohms <14 pf/ft 4000 ft Comm. LON Bus 22/1P Non-Shielded Echelon Purple KEL-W221P-2001PB
• A drag line will be left in all conduit runs for future expansion or changes. (9)
(1-2) (5-7)
Modbus 22/24 awg 120 Ohms <14 pf/ft 4000 ft Comm. Infinet 24/2 Shielded Lo Cap Rasberry KEL-W241P-2000FBRSP
(9)
(4) (5-7)
LON 22 awg 100 Ohms 17 pf/ft 4600 ft Comm Ethernet 24/4P Non-Shielded w/PVC Blue KEL-W244P-2274BL
(9)
5/26/2022
5/26/2022
5/26/2022
Keyed Notes
(1) Capacitance between conductors is approximately 12pF per foot.
Cable Legend Network & Communications (2) Shielded Twisted Pair.
• Every Schneider Electric IP level control panel is to have a Cat6 Ethernet or fiber connection as needed to a network switch or (3) Unshielded Twisted Pair.
BACnet MS-TP next control panel as shown in the approved control drawings. See the appropriate network and control drawings for (4) Category-6 Ethernet cabling between Network Controllers and Network Switch.
Date:
Date:
Date:
BACnet MS-TP (RS-485) clarification. (5) Plenum or Non-Plenum version shall be field determined.
• Always coordinate with a Schneider field technician or project manager for details and general layout regarding network (6) Recommended colors shown; field confirm with Schneider Electric project manager.
Modbus architecture prior to install. Any deviation from approved Schneider riser diagrams and Network architecture drawings must (7) Equivalent cables from Belden, Windy City Wire, etc. are acceptable.
Modbus RTU (RS-485 be approved by Schneider personal only. (8) Use shielded cable as required for specific installations.
• In addition, Electrical contractor is to keep a legible copy of as-builts of specific network route(s) on Mechanical drawings. These (9) Cable jacket colors are recommended. Coordinate with Schneider Electric
LonWorks as-builts should show exactly which devices are on the communication segment, the order in which each device is located on
LonWorks (FTT-10) the segment, location, and how/where the cables are routed between devices. See Electrical Subcontractors Handbook for Terminations
examples. • All panel wiring to be run inside of wire duct.
• Wires in wire duct should not cross each other excessively.
Designed by:
• Communication cables are to be run separate from power wiring, and never in the same conduit.
Software by:
Checked by:
Infinet
Contractor:
• Maintain maximum distance from any high voltage wiring (lighting ballasts, VFDs, and/or other electrical equipment which will • Limit the use of cable ties within the wire duct. They usually get cut off when troubleshooting.
Engineer:
Infinet (RS-485)
Architect:
create “noise” on network) or cable to eliminate noise/interference on network. • Do not run wire over other devices.
• Inside of any enclosures or VFD where communication cabling would inevitably come in relative close proximity with high voltage • Leave service loop – field wire should be long enough to reach any point inside the panel.
EOL RS-485 End of Line Resistor (120Ω) • The slack has to be hidden out of sight within the wire duct
cable (greater than 24 AC/DC) it is critical that the wiring be passed through the enclosure in such a way to create the
maximum allowable space between it and the power wiring. Above shall be accomplished through use of cable ties and cable • Strip back approximately 4 inches of cable jacket so that each conductor can be easily accessed for service (removal, testing,
TERM2 LonWorks FTT-10 Bus Topology Terminator
Cable Specification
equipment is to have been calibrated within the past 6 months.
##
BOM Software
2-Conductor Cable • Wires must exit the terminal strips straight.
Tag Tag ##
End-1 Standard Patch Cable Standard End-2 Cross Over End-2
BOM Software ##
2-Conductor Shielded Cable 1 Orange/White 1 Cable Length Guideline
Tag Tag ## 1 2 3 4 5 6 7 8 2 Orange 2 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
3 Green/White 3 Universal inputs/outputs as digital inputs 22 AWG 650 ft.
##
BOM Software 4 Blue 4
Tag Tag
## 3-Conductor Cable 5 Blue/White 5 Universal inputs/outputs as analog inputs 22 AWG 330 ft.
##
6 Green 6
7 Brown/White 7 Universal inputs/outputs as temperature (thermistor)
18 AWG 250 ft.
##
8 Brown 8 inputs, up to 167 °F
BOM Software
Tag Tag
## 3-Conductor Shielded Cable Universal inputs/outputs as temperature (thermistor)
14 AWG 500 ft.
## Cross Over Cable inputs, up to 167 °F
1 1 Universal inputs/outputs as temperature (thermistor)
14 AWG 250 ft.
##
2 2 inputs, up to 302 °F
BOM Software ## b B 3 3 b B b B Universal inputs/outputs, for actuators and transmitters
4-Conductor Cable 18 AWG 65 ft.
5/27/2022
5/27/2022
Tag Tag ## o O g B b G o O g B b G g G o B b O powered from the same transformer as the Controller
r R r R r R
Last Printed
4 4
Last Saved
##
5 5 Universal inputs/outputs, for actuators and transmitters
22 AWG 650 ft.
6 6 powered from their own transformer (external or internal)
##
7 7 Sensor Bus CAT5 or CAT6 200 ft. Total
BOM Software ##
4-Conductor Shielded Cable 8 8
Tag Tag ##
Job Number
IP/Ethernet/BACnet IP CAT5 or CAT6 100 m per segment
Sheet Number
File Name
101-3
Pin-1 Pin-8
Electric. Their use or reproduction without prior consent of
PHX11 ADMIN Network Architecture
1 11 13 23 25 35 37 47 1 11 13 23 25 35 37 47
TAHUYA TAHUYA
NETWORK 2 12 14 24 26 36 38 48 2 12 14 24 26 36 38 48 NETWORK
1 11 13 23 25 35 37 47 1 11 13 23 25 35 37 47
BAS BAS
Date:
NETWORK 2 12 14 24 26 36 38 48 2 12 14 24 26 36 38 48 NETWORK
Preliminary
PHX11CEH02 PHX11CEH01
1
Virtual Machine 01: EcoStruxure Building Operation Enterprise Server
1
Virtual Machine 02: External Log Storage [Database Server]
# Change:
Revision:
PHX11 ADMIN FACILITY CABLE ROOM PHX11 ADMIN FACILITY CABLE ROOM
1
2
3
4
5
PHX11-ADMIN-BAS WORKSTATION02 PHX11-ADMIN-BAS WORKSTATION01
MEDIA CONVERTER
(BY OTHERS)
5/26/2022
5/26/2022
5/26/2022
PHX11 ADMIN OPEN OFFICE PHX10 ADMIN FACILITY OPERATIONS CENTER
Date:
Date:
Date:
1 2 3 4 5 6 7 8 9 10 11 12
TX/RX+
TX/RX+
TX/RX+
TX/RX+
TX/RX-
TX/RX-
TX/RX-
TX/RX-
BIAS+
RET
RET
RET
UI-16 UI8/DO-FC-4-H
RS232/RS485
Com A Com B RS-485 TP/FT
TAHUYA DEVICE
RS-485 LON
Schneider Electric Schneider Electric Schneider Electric Schneider Electric
SXW PS-24V SXW AS-P SXW IO SXW IO
PS-1 Device
5VDC
Host
10/100 10/100
Ethernet 1 Ethernet 2
SL3 SL4
Designed by:
Software by:
Checked by:
Contractor:
Engineer:
Architect:
DOAS
Architecture
To EPMS
Network Switch DX VRF
EPMS
System
GATEWAY DIII-NET
PHX11 ADMIN FACILITY CABLE ROOM
PHX11-ADMIN-FCR-MCG ENCLOSURE
MEDIA CONVERTER
1 2 3 4 5 6 7 8 9 10 11 12
TX/RX+
TX/RX+
TX/RX+
TX/RX+
TX/RX-
TX/RX-
TX/RX-
TX/RX-
BIAS+
RET
RET
RET
5/27/2022
5/27/2022
Com A Com B RS-485 TP/FT
RS-485 LON
Last Printed
Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric
Last Saved
Schneider Electric
SXW PS-24V SXW AS-P SXW IO SXW IO SXW IO SXW IO SXW IO SXW IO
PS-1 Device
Host
10/100 10/100
Ethernet 1 Ethernet 2
SL3 SL4 SL5 SL6 SL7 SL8
Job Number
Sheet Number
BAS CAMPUS NETWORK Part Number Qty Description Manufacturer
File Name
----------------------------------------------------------------------------------------------------------------------------------------------------
201-1
BAS CAT6 ETHERNET
SXWSWESDBTS001 1 TIMESCALE DB OPTION - ES Schneider Electric
TAHUYA CAT6 ETHERNET NOTES SXWSWESXX00250 1 ENTERPRISE SERVER - 250 Schneider Electric
SINGLE MODE FIBER SXWSWWORK00002 1 WRKSTN PRO 1 USER NO MAINT Schneider Electric
SERIAL (RS-485) 1 High availability virtual machines.
TYPICAL:
TAHUYA TAHUYA
1 11 13 23 25 35 37 47
NETWORK 2 12 14 24 26 36 38 48 NETWORK
1 11 13 23 25 35 37 47
BAS BAS
NETWORK 2 12 14 24 26 36 38 48 NETWORK
Date:
Preliminary
1 2 3 4 5 6 7 8 9 10 11 12
TX/RX+
TX/RX+
TX/RX+
TX/RX+
TX/RX-
TX/RX-
TX/RX-
TX/RX-
BIAS+
RET
RET
RET
UI16 UI16 UI8/AO-4-H UI16
RS232/RS485
Com A Com B RS-485 TP/FT
TAHUYA DEVICE
RS-485 LON
Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric
SXW PS-24V SXW AS-P SXW IO SXW IO SXW IO SXW IO
PS-1 Device
5VDC
DIII-NET
# Change:
Revision:
1 2 3 4 5 6 7 8 9 10 11 12
TX/RX+
TX/RX+
TX/RX+
TX/RX+
TX/RX-
TX/RX-
TX/RX-
TX/RX-
BIAS+
RET
RET
RET
UI16 UI16 UI8/AO-4-H AO-8-H DO-8-H
RS232/RS485
Com A Com B RS-485 TP/FT
TAHUYA DEVICE
RS-485 LON
Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric
SXW PS-24V SXW AS-P SXW IO SXW IO SXW IO SXW IO SXW IO
PS-1 Device
1
2
3
4
5
5VDC
Host
10/100 10/100
Ethernet 1 Ethernet 2
SL3 SL4 SL5 SL6 SL7
1 2 3 4 5 6 7 8 9 10 11 12
TX/RX+
TX/RX+
TX/RX+
TX/RX+
TX/RX-
TX/RX-
TX/RX-
TX/RX-
BIAS+
RET
RET
RET
UI16 UI16 UI8/AO-4-H AO-8-H DO-8-H
RS232/RS485
Com A Com B RS-485 TP/FT
TAHUYA DEVICE
RS-485 LON
Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric
SXW PS-24V SXW AS-P SXW IO SXW IO SXW IO SXW IO SXW IO
PS-1
5/26/2022
5/26/2022
5/26/2022
Device
5VDC
Host
10/100 10/100
Ethernet 1 Ethernet 2
SL3 SL4 SL5 SL6 SL7
1 2 3 4 5 6 7 8 9 10 11 12
Date:
Date:
Date:
TX/RX+
TX/RX+
TX/RX+
TX/RX+
TX/RX-
TX/RX-
TX/RX-
TX/RX-
BIAS+
RET
RET
RET
UI16 UI16 UI8/AO-4-H AO-8-H DO-8-H
RS232/RS485
Com A Com B RS-485 TP/FT
TAHUYA DEVICE
RS-485 LON
Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric
SXW PS-24V SXW AS-P SXW IO SXW IO SXW IO SXW IO SXW IO
PS-1 Device
5VDC
Host
10/100 10/100
Ethernet 1 Ethernet 2
SL3 SL4 SL5 SL6 SL7
Designed by:
Software by:
Checked by:
1 2 3 4 5 6 7 8 9 10 11 12
Contractor:
TX/RX+
TX/RX+
TX/RX+
TX/RX+
TX/RX-
TX/RX-
TX/RX-
TX/RX-
BIAS+
RET
RET
RET
UI16 UI16 UI8/AO-4-H AO-8-H DO-8-H
Engineer:
Architect:
RS232/RS485
RS-485 LON
Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric
SXW PS-24V SXW AS-P SXW IO SXW IO SXW IO SXW IO SXW IO
PS-1 Device
5VDC
Host
10/100 10/100
Ethernet 1 Ethernet 2
SL3 SL4 SL5 SL6 SL7
TX/RX+
TX/RX+
TX/RX+
TX/RX+
TX/RX-
TX/RX-
TX/RX-
TX/RX-
BIAS+
RET
RET
RET
UI16 UI16 UI8/AO-4-H AO-8-H DO-8-H
RS232/RS485
RS-485 LON
Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric
SXW PS-24V SXW AS-P SXW IO SXW IO SXW IO SXW IO SXW IO
PS-1 Device
5VDC
Host
10/100 10/100
Ethernet 1 Ethernet 2
SL3 SL4 SL5 SL6 SL7
1 2 3 4 5 6 7 8 9 10 11 12
TX/RX+
TX/RX+
TX/RX+
TX/RX+
TX/RX-
TX/RX-
TX/RX-
TX/RX-
BIAS+
RET
RET
RET
RS-485 LON
Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric
SXW PS-24V SXW AS-P SXW IO SXW IO SXW IO SXW IO SXW IO
PS-1 Device
5VDC
Host
10/100 10/100
Ethernet 1 Ethernet 2
SL3 SL4 SL5 SL6 SL7
5/27/2022
5/27/2022
Last Printed
Last Saved
1 2 3 4 5 6 7 8 9 10 11 12
TX/RX+
TX/RX+
TX/RX+
TX/RX+
TX/RX-
TX/RX-
TX/RX-
TX/RX-
BIAS+
RET
RET
RET
RS-485 LON
Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric
SXW PS-24V SXW AS-P SXW IO SXW IO SXW IO SXW IO SXW IO
PS-1 Device
5VDC
Host
10/100 10/100
Ethernet 1 Ethernet 2
SL3 SL4 SL5 SL6 SL7
Job Number
PHX11 COLO(X) CELL(Y) MECHNICAL GALLERY
Sheet Number
BAS CAMPUS NETWORK 1 2 3 4 5 6 7 8 9 10 11 12
TX/RX+
TX/RX+
TX/RX+
TX/RX+
File Name
TX/RX-
TX/RX-
TX/RX-
TX/RX-
BIAS+
RET
RET
RET
201-2
RS232/RS485
RS-485 LON
Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric
SXW PS-24V SXW AS-P SXW IO SXW IO SXW IO SXW IO SXW IO
5VDC
TAHUYA TAHUYA
1 11 13 23 25 35 37 47
NETWORK 2 12 14 24 26 36 38 48 NETWORK
1 11 13 23 25 35 37 47
BAS BAS
NETWORK 2 12 14 24 26 36 38 48 NETWORK
Date:
Preliminary
1 2 3 4 5 6 7 8 9 10 11 12
TX/RX+
TX/RX+
TX/RX+
TX/RX+
TX/RX-
TX/RX-
TX/RX-
TX/RX-
BIAS+
RET
RET
RET
UI16 UI16 UI16 UI16 UI16 AO-8-H
RS232/RS485
Com A Com B RS-485 TP/FT
TAHUYA DEVICE
RS-485 LON
Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric
SXW PS-24V SXW AS-P SXW IO SXW IO SXW IO SXW IO SXW IO SXW IO
PS-1 Device
5VDC
DIII-NET
# Change:
Revision:
1 2 3 4 5 6 7 8 9 10 11 12
TX/RX+
TX/RX+
TX/RX+
TX/RX+
TX/RX-
TX/RX-
TX/RX-
TX/RX-
BIAS+
RET
RET
RET
UI16 UI16 UI8/AO-4-H AO-8-H DO-8-H
RS232/RS485
Com A Com B RS-485 TP/FT
TAHUYA DEVICE
RS-485 LON
Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric
SXW PS-24V SXW AS-P SXW IO SXW IO SXW IO SXW IO SXW IO
PS-1 Device
1
2
3
4
5
5VDC
Host
10/100 10/100
Ethernet 1 Ethernet 2
SL3 SL4 SL5 SL6 SL7
1 2 3 4 5 6 7 8 9 10 11 12
TX/RX+
TX/RX+
TX/RX+
TX/RX+
TX/RX-
TX/RX-
TX/RX-
TX/RX-
BIAS+
RET
RET
RET
UI16 UI16 UI8/AO-4-H AO-8-H DO-8-H
RS232/RS485
Com A Com B RS-485 TP/FT
TAHUYA DEVICE
RS-485 LON
Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric
SXW PS-24V SXW AS-P SXW IO SXW IO SXW IO SXW IO SXW IO
PS-1
5/26/2022
5/26/2022
5/26/2022
Device
5VDC
Host
10/100 10/100
Ethernet 1 Ethernet 2
SL3 SL4 SL5 SL6 SL7
1 2 3 4 5 6 7 8 9 10 11 12
Date:
Date:
Date:
TX/RX+
TX/RX+
TX/RX+
TX/RX+
TX/RX-
TX/RX-
TX/RX-
TX/RX-
BIAS+
RET
RET
RET
UI16 UI16 UI8/AO-4-H AO-8-H DO-8-H
RS232/RS485
Com A Com B RS-485 TP/FT
TAHUYA DEVICE
RS-485 LON
Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric
SXW PS-24V SXW AS-P SXW IO SXW IO SXW IO SXW IO SXW IO
PS-1 Device
5VDC
Host
10/100 10/100
Ethernet 1 Ethernet 2
SL3 SL4 SL5 SL6 SL7
Designed by:
Software by:
Checked by:
1 2 3 4 5 6 7 8 9 10 11 12
Contractor:
TX/RX+
TX/RX+
TX/RX+
TX/RX+
TX/RX-
TX/RX-
TX/RX-
TX/RX-
BIAS+
RET
RET
RET
UI16 UI16 UI8/AO-4-H AO-8-H DO-8-H
Engineer:
Architect:
RS232/RS485
RS-485 LON
Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric
SXW PS-24V SXW AS-P SXW IO SXW IO SXW IO SXW IO SXW IO
PS-1 Device
5VDC
Host
10/100 10/100
Ethernet 1 Ethernet 2
SL3 SL4 SL5 SL6 SL7
TX/RX+
TX/RX+
TX/RX+
TX/RX+
TX/RX-
TX/RX-
TX/RX-
TX/RX-
BIAS+
RET
RET
RET
UI16 UI16 UI8/AO-4-H AO-8-H DO-8-H
RS232/RS485
RS-485 LON
Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric
SXW PS-24V SXW AS-P SXW IO SXW IO SXW IO SXW IO SXW IO
PS-1 Device
5VDC
Host
10/100 10/100
Ethernet 1 Ethernet 2
SL3 SL4 SL5 SL6 SL7
1 2 3 4 5 6 7 8 9 10 11 12
TX/RX+
TX/RX+
TX/RX+
TX/RX+
TX/RX-
TX/RX-
TX/RX-
TX/RX-
BIAS+
RET
RET
RET
RS-485 LON
Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric
SXW PS-24V SXW AS-P SXW IO SXW IO SXW IO SXW IO SXW IO
PS-1 Device
5VDC
Host
10/100 10/100
Ethernet 1 Ethernet 2
SL3 SL4 SL5 SL6 SL7
5/27/2022
5/27/2022
Last Printed
Last Saved
1 2 3 4 5 6 7 8 9 10 11 12
TX/RX+
TX/RX+
TX/RX+
TX/RX+
TX/RX-
TX/RX-
TX/RX-
TX/RX-
BIAS+
RET
RET
RET
RS-485 LON
Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric
SXW PS-24V SXW AS-P SXW IO SXW IO SXW IO SXW IO SXW IO
PS-1 Device
5VDC
Host
10/100 10/100
Ethernet 1 Ethernet 2
SL3 SL4 SL5 SL6 SL7
Job Number
PHX11 COLO(X) CELL(Y) MECHNICAL GALLERY
Sheet Number
BAS CAMPUS NETWORK 1 2 3 4 5 6 7 8 9 10 11 12
TX/RX+
TX/RX+
TX/RX+
TX/RX+
File Name
TX/RX-
TX/RX-
TX/RX-
TX/RX-
BIAS+
RET
RET
RET
201-3
RS232/RS485
RS-485 LON
Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric
SXW PS-24V SXW AS-P SXW IO SXW IO SXW IO SXW IO SXW IO
5VDC
TAHUYA TAHUYA
1 11 13 23 25 35 37 47
NETWORK 2 12 14 24 26 36 38 48 NETWORK
1 11 13 23 25 35 37 47
BAS BAS
NETWORK 2 12 14 24 26 36 38 48 NETWORK
Date:
Preliminary
BATT
VRF
MCG
DIII-NET
# Change:
Revision:
1 2 3 4 5 6 7 8 9 10 11 12
TX/RX+
TX/RX+
TX/RX+
TX/RX+
TX/RX-
TX/RX-
TX/RX-
TX/RX-
BIAS+
RET
RET
RET
UI16 UI16 UI8/AO-4-H AO-8-H DO-8-H
RS232/RS485
Com A Com B RS-485 TP/FT
TAHUYA DEVICE
RS-485 LON
Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric
SXW PS-24V SXW AS-P SXW IO SXW IO SXW IO SXW IO SXW IO
PS-1 Device
1
2
3
4
5
5VDC
Host
10/100 10/100
Ethernet 1 Ethernet 2
SL3 SL4 SL5 SL6 SL7
1 2 3 4 5 6 7 8 9 10 11 12
TX/RX+
TX/RX+
TX/RX+
TX/RX+
TX/RX-
TX/RX-
TX/RX-
TX/RX-
BIAS+
RET
RET
RET
UI16 UI16 UI8/AO-4-H AO-8-H DO-8-H
RS232/RS485
Com A Com B RS-485 TP/FT
TAHUYA DEVICE
RS-485 LON
Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric
SXW PS-24V SXW AS-P SXW IO SXW IO SXW IO SXW IO SXW IO
PS-1
5/26/2022
5/26/2022
5/26/2022
Device
5VDC
Host
10/100 10/100
Ethernet 1 Ethernet 2
SL3 SL4 SL5 SL6 SL7
1 2 3 4 5 6 7 8 9 10 11 12
Date:
Date:
Date:
TX/RX+
TX/RX+
TX/RX+
TX/RX+
TX/RX-
TX/RX-
TX/RX-
TX/RX-
BIAS+
RET
RET
RET
UI16 UI16 UI8/AO-4-H AO-8-H DO-8-H
RS232/RS485
Com A Com B RS-485 TP/FT
TAHUYA DEVICE
RS-485 LON
Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric
SXW PS-24V SXW AS-P SXW IO SXW IO SXW IO SXW IO SXW IO
PS-1 Device
5VDC
Host
10/100 10/100
Ethernet 1 Ethernet 2
SL3 SL4 SL5 SL6 SL7
Designed by:
Software by:
Checked by:
1 2 3 4 5 6 7 8 9 10 11 12
Contractor:
TX/RX+
TX/RX+
TX/RX+
TX/RX+
TX/RX-
TX/RX-
TX/RX-
TX/RX-
BIAS+
RET
RET
RET
UI16 UI16 UI8/AO-4-H AO-8-H DO-8-H
Engineer:
Architect:
RS232/RS485
RS-485 LON
Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric
SXW PS-24V SXW AS-P SXW IO SXW IO SXW IO SXW IO SXW IO
PS-1 Device
5VDC
Host
10/100 10/100
Ethernet 1 Ethernet 2
SL3 SL4 SL5 SL6 SL7
TX/RX+
TX/RX+
TX/RX+
TX/RX+
TX/RX-
TX/RX-
TX/RX-
TX/RX-
BIAS+
RET
RET
RET
UI16 UI16 UI8/AO-4-H AO-8-H DO-8-H
RS232/RS485
RS-485 LON
Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric
SXW PS-24V SXW AS-P SXW IO SXW IO SXW IO SXW IO SXW IO
PS-1 Device
5VDC
Host
10/100 10/100
Ethernet 1 Ethernet 2
SL3 SL4 SL5 SL6 SL7
1 2 3 4 5 6 7 8 9 10 11 12
TX/RX+
TX/RX+
TX/RX+
TX/RX+
TX/RX-
TX/RX-
TX/RX-
TX/RX-
BIAS+
RET
RET
RET
RS-485 LON
Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric
SXW PS-24V SXW AS-P SXW IO SXW IO SXW IO SXW IO SXW IO
PS-1 Device
5VDC
Host
10/100 10/100
Ethernet 1 Ethernet 2
SL3 SL4 SL5 SL6 SL7
5/27/2022
5/27/2022
Last Printed
Last Saved
1 2 3 4 5 6 7 8 9 10 11 12
TX/RX+
TX/RX+
TX/RX+
TX/RX+
TX/RX-
TX/RX-
TX/RX-
TX/RX-
BIAS+
RET
RET
RET
RS-485 LON
Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric
SXW PS-24V SXW AS-P SXW IO SXW IO SXW IO SXW IO SXW IO
PS-1 Device
5VDC
Host
10/100 10/100
Ethernet 1 Ethernet 2
SL3 SL4 SL5 SL6 SL7
Job Number
PHX11 COLO(X) CELL(Y) MECHNICAL GALLERY
Sheet Number
BAS CAMPUS NETWORK 1 2 3 4 5 6 7 8 9 10 11 12
TX/RX+
TX/RX+
TX/RX+
TX/RX+
File Name
TX/RX-
TX/RX-
TX/RX-
TX/RX-
BIAS+
RET
RET
RET
201-4
RS232/RS485
RS-485 LON
Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric Schneider Electric
SXW PS-24V SXW AS-P SXW IO SXW IO SXW IO SXW IO SXW IO
5VDC
SL4
EF01.SS
NO1
COM
TB4-17
T4-9AC
N
120 VAC
L
R1
EF01
R2
TB4-2
TB4-1
UI1
RET
SL4
Exhaust Air
EF01.STS
Compactor Room Hydrogen Sensor Flow Diagram
Alarm
Hydrogen
HDT
L
N
TB4-8
TB4-7
RET
Shunt Trip
ST
Forklift Charger
Integral
SL4
Horn/Strobe
UI4 EF01-HDT01.ALM
ADMIN Systems Diagrams
N
120 VAC
L
EF02
Admin Toilet Exhaust Fan Diagram
TB4-4
TB4-3
UI2
RET
SL4
Exhaust Air
EF02.STS
Job Number
National And Strategic Accounts Architect:
Revision: Preliminary
Engineer:
# Change: Date:
File Name Last Saved Contractor:
1
301 ADMIN Flow Diagram.vsd 5/27/2022 Designed by: Date: 5/26/2022 2
3 These drawings and designs are the property of Schneider
Sheet Number Last Printed Software by: Date: 5/26/2022 Electric. Their use or reproduction without prior consent of
4
the company is strictly forbidden.
ADMIN Systems Diagrams Checked by: Date: 5/26/2022 5
301-1 5/27/2022
Mounted in Panel
14
13
R1
1 10
1.6.3a
RLFA-A N.C.
NO COM Mounted in Panel
H L
PH01
Set @ 0.3"
RLFA-B N.C.
1.6.3b
Date:
R1:6 X3H SL5
PD01
TB5:18 X4N
Preliminary
TB5:17 VO1 PD01.CMD
TB3:9 UI5 PD01.FB
Mechanical Gallery
VO2 TB6:3 N.O.
TD03.CMD
X6N TB6:4 TD03
SL6 X5H TB6:2AC
TD03.FB UI3 TB3:3 1.6.2
# Change:
Revision:
TD01.FB UI3 TB3:5 FT01.SAF
TD01.CMD VO3 TB6:5 TT02.MAT SL3 NT01.SAH TT01.SAT
X6N TB6:6 RA SL3 UI13 RET SL3 SL3
SL6
1
2
3
4
5
X5H TB6:3AC UI10 Y1+ UI11 Y1+ UI1 Y1+
TB3:25 TB3:26
TB3:13 UI7 ND01.FB
TB3:19 TB3:10DC TB3:21 TB3:11DC TB3:1 TB3:1DC
TB6:7AC X5H SL6
1.6.11 + -
- + TB6:14 X6N 4-20mA VIN - +
TD01 ND01 ND01.CMD FT01
TT02 TB6:13 VO7 NT01 TT01
3 EC
1.6.1a OA N.O. SA
N.C.
5/26/2022
5/26/2022
5/26/2022
TBx:## UI# SF0#.STS NT02
N.O. 1.6.12 SF##
TBx:## RET SL# 4-20mA VIN
1.6.1b OA
N.C. VO8 TB6:15 X4N TBPA Typical of 6
+ -
ND02.CMD ND02 WS01 TB3:23 TB3:12DC
X6N TB6:16 X3H TBPA
SL6
TD02.CMD VO4 TB6:7
TD02
X5H TB6:8AC NO C
1.1.2 SC01
TB7:15 NO5 SC01.SS UI12 Y1+
X6N TB6:8 ND02.FB UI8 TB3:15 TB7:14 X8N SL7 SL3
Date:
Date:
Date:
SL6 1.1.3
X5H TB6:4AC X4N TBPA TB4:1 TB4:2 SC01.FB UI14 TB3:27 TB6:1 VO1 SC01.SPD NT02.SAH
+ -
WS02
TD02.FB UI4 TB3:7 X3H TBPA SL3 RET TB3:28 VFD TB6:2 RET SL6
UI1 RET
NO C SC01.FLT UI16 TB4:31
SL4
SL4 RET TB4:32
WS01.WD
TB4:3 TB4:4 TB4:29 UI15 SC01.STS
TB4:30 RET SL4
UI2 RET
SL4
Designed by:
Software by:
Checked by:
WS02.WD
Contractor:
Engineer:
Architect:
CT01
5/27/2022
5/27/2022
LL01.LL UI7 TB4:13 X3H TBPA TB7:9 NO3 CCV01.OC
Last Printed
AI-13 FT01.SAF SUPPLY AIR FLOW TBD CFM 0-50,000
Last Saved
CCV01
SL4 RET TB4:14 TB7:8 X8N SL7
HL OL LL
LN01.NL UI5 TB4:9 Bleed AI-14 SC01.FB SUPPLY FAN SPEED FEEDBACK TBD % 0-100
SL4 RET TB4:10
LH01.HL UI6 TB4:11 Overflow
AO-01 SC01.SPD SUPPLY FAN SPEED COMMAND TBD % 0-100
SL4 RET TB4:12 EC Basin P1 AO-02 TD03.CMD RETURN AIR DAMPER COMMAND 2-10 VDC % 0-100
Job Number
N.O.
Sheet Number
EP01 TB7:5 X8N SL7
TB7:11 X8N SL7
File Name
AO-05 PD01.CMD RELIEF AIR DAMPER A COMMAND 2-10 VDC % 0-100
302-1
TB4:15 UI8 EP01.STS
EP01 TB4:7 UI4 LCV02.FB
TB4:16 RET SL4 AO-06 PD02.CMD RELIEF AIR DAMPER B COMMAND 2-10 VDC % 0-100
TB4:8 RET SL4
AO-07 ND01.CMD FACE DAMPER COMMAND TBD % 0-100
AO-08 ND02.CMD BYPASS DAMPER COMMAND TBD % 0-100
Electric. Their use or reproduction without prior consent of
COLO System Diagram
Date:
2 TBPA
Mounted in Panel
PD01 Actuator Power 6 10 X5H
PB1
Preliminary
Set Reset
1
TB3:9 UI5 PD01.FB 13 LR1 14 9 LR1 12 NO COM
PD02 Actuator Power 5 9 X4N TBPA
R1:6 X3H SL6 X3H TBPA
TB6:18 X4N
PD01 PD01.CMD
TB5:17 VO1 LR1-1
14
13
R1
1 10
1.6.3a
RLFA N.C.
NO COM Mounted in Panel
H L
PH01
Set @ 0.3"
RLFA N.C.
1.6.3b
# Change:
Revision:
TB5:19 VO2 PD02.CMD
PD02
TB5:20 X4N
R1:5 X3H SL5
TB3:11 UI6 PD02.FB
1
2
3
4
5
5/26/2022
5/26/2022
5/26/2022
Date:
Date:
Date:
Designed by:
Software by:
Checked by:
Contractor:
Engineer:
Architect:
National And Strategic Accounts
5/27/2022
Last Printed
Last Saved
Job Number
Sheet Number
File Name
DESIGNATION EBO POINT NAME DESCRIPTION SIGNAL TYPE UNIT RANGE
303-1
AI-28 PD01.FB RELIEF DAMPER 01 FEEDBACK 2-10 VDC % 0-100
AI-29 PD02.FB RELIEF DAMPER 02 FEEDBACK 2-10 VDC % 0-100
AO-01 PD01.CMD RELIEF DAMPER 01 COMMAND 2-10 VDC % 0-100
AO-02 PD02.CMD RELIEF DAMPER 02 COMMAND 2-10 VDC % 0-100
Electric. Their use or reproduction without prior consent of
ADMIN Floorplan
Date:
C T 3. Equipment vendor to provide and
Preliminary
configure BACnet/IP-capable
controller for connection to BAS.
T T C Coordinate points list with control
EF C contractor. Gateway device by
others.
EF
4. Mount VRF gateway inside an
enclosure per manufacturer’s
instruction. Touchscreen controller/
# Change:
Revision:
HMI shall be mounted on the front
panel of the same enclosure.
1
2
3
4
5
5. Duct heater controlled by COLO1
CELL1 central controller.
5/26/2022
5/26/2022
5/26/2022
devices from PHX11-ADMIN-CC01
panel.
Date:
Date:
Date:
Designed by:
Software by:
Checked by:
Contractor:
Engineer:
Architect:
N
ADMIN Floorplan
LEGEND
T = CONTROL PANEL
5/27/2022
5/27/2022
Last Printed
EFE
Last Saved
F = EXHAUST FAN
F ADMIN
H2 H2
TT = TEMPERATURE Device Qty Part Number Description Manufacturer
----------------------------------------------------------------------------------------------------------------------------------------------------
Job Number
H2H = HYDROGEN ###-FT01 2 FT-3215-21112-1021 In-line EM Flow Meter, 1.5 in. Onicon
Sheet Number
EF## 3 H608 CURRENT SWITCH N.O. SPLIT CORE Veris Industries
File Name
EF01-HDT01 1 869-STR-B-AQ Strobe Light, Blue Edwards Signaling
401-1
EF01-HDT01 1 KEL-GDD-H2 HYDROGEN DETECTOR Kele
FF = FLOW METER EF01-HDT01 1 V300 RELAY ENCLOSED DPDT 20-30V Veris Industries
TT## 4 A/TTM1K-4-R2-4 Room Air Temp Sensor, Matched ACI
Electric. Their use or reproduction without prior consent of
COLO 1 CELL 2 & 4 Floorplan
Date:
of flow meters and pressure transmitters.
Preliminary
4. Field verify panel location with other trades.
# Change:
equipment points list with controls contractor.
Revision:
L L L L L L L L L L L L L L L L Reference VRF detail.
CS CS CS CS CS CS CS CS CS CS CS CS CS CS CS CS
R R R R R R R R R R R R R R R R
1
2
3
4
5
5/26/2022
5/26/2022
5/26/2022
T C T T CT
Date:
Date:
Date:
P P P P P P P P P P P P P P P P P P P P
T T T T T T T T T T T T T T T T T T T T T T
H
P
H H
P
H H
P
H H
P
H H
P
H H
P
H N
Designed by:
Software by:
Checked by:
Contractor:
Engineer:
Architect:
T T
COLO 1 CELL 2
Device Qty Part Number Description Manufacturer
----------------------------------------------------------------------------------------------------------------------------------------------------
Floorplan
PT##-HA 8 AA56 STAINLESS PLATE/STATIC PRESSUR Veris Industries
PT06-OA 1 SPH20 STATIC PRESSURE HEAD HEATED Vaisala
T = CONTROL PANEL SF0#.STS 6 H904 VFD Current Switch, NO, Split- Veris Industries
TD03 24 AMB24-SR Modulating, Non-Fail-safe, AC Belimo
T = DP PANEL TD01 + TD02 72 NMB24-SR Modulating, Non-Fail-safe, AC Belimo
TT## 9 A/TTM1K-R2-4-32-122F Room Air Temp Sensor, Matched ACI
T = REM. POWER PANEL
TT## + NT## 6 A/RH2-TTM1K-R2-4-32-122F Room Air Temp/Hum Sensor, Matc ACI
TT14 + NT08 1 HMS110 OA Temp/Hum Sensor Vaisala
P P T = DUCT HEATER
WS02 8 U006-0007 SPOT DETECTOR 14 FT LEADER CBL Veris Industries
A A A A T = REM. CO PANEL
T F P TT = TEMPERATURE COLO 1 CELL 4
Device Qty Part Number Description Manufacturer
5/27/2022
5/27/2022
HH = HUMIDITY ----------------------------------------------------------------------------------------------------------------------------------------------------
Last Printed
Last Saved
##.SS + .O + .C 56 V100 RELAY ENCLOSED SPDT 10-30V Veris Industries
PP = PRESSURE CO 1 CO-R-4X-RB-D CO Room Mount with Display, Re ACI
PD## 6 AFB24-SR Modulating, Spring Return, AC Belimo
FF = FLOW METER PT##-CA 5 AA56 STAINLESS PLATE/STATIC PRESSUR Veris Industries
PT##-HA 8 AA56 STAINLESS PLATE/STATIC PRESSUR Veris Industries
AA
Job Number
= ACTUATOR PT06-OA 1 SPH20 STATIC PRESSURE HEAD HEATED Vaisala
Sheet Number
TD01 + TD02 72 NMB24-SR Modulating, Non-Fail-safe, AC Belimo
RR = FIELD RELAY
File Name
TT## 8 A/TTM1K-R2-4-32-122F Room Air Temp Sensor, Matched ACI
402-1
TT## + NT## 6 A/RH2-TTM1K-R2-4-32-122F Room Air Temp/Hum Sensor, Matc ACI
CST = CURRENT SWITCH
TT14 + NT08 1 HMS110 OA Temp/Hum Sensor Vaisala
WS02 8 U006-0007 SPOT DETECTOR 14 FT LEADER CBL Veris Industries
CT = CO SENSOR
Electric. Their use or reproduction without prior consent of
COLO 1 CELL 1 & 3 Floorplan
Date:
of flow meters and pressure transmitters.
P P P P P P
Preliminary
H H H H H H H H H H H H 4. Field verify panel location with other trades.
# Change:
equipment points list with controls contractor.
Revision:
Reference VRF detail.
1
2
3
4
5
R R R R R R R R R R R R R R R R
CS CS CS CS CS CS CS CS CS CS CS CS CS CS CS CS
5/26/2022
5/26/2022
5/26/2022
L L L L L L L L L L L L L L L L
A A A A A A A A A A A A A A A A
A A A A A A A A A A A A A A A A
Date:
Date:
Date:
N
Designed by:
Software by:
Checked by:
Contractor:
Engineer:
Architect:
COLO 1 CELL 1
Device Qty Part Number Description Manufacturer
----------------------------------------------------------------------------------------------------------------------------------------------------
Floorplan
PT##-HA 8 AA56 STAINLESS PLATE/STATIC PRESSUR Veris Industries
PT06-OA 1 SPH20 STATIC PRESSURE HEAD HEATED Vaisala
T = CONTROL PANEL SF0#.STS 6 H904 VFD Current Switch, NO, Split- Veris Industries
TD03 24 AMB24-SR Modulating, Non-Fail-safe, AC Belimo
T = DP PANEL TD01 + TD02 72 NMB24-SR Modulating, Non-Fail-safe, AC Belimo
TT## 9 A/TTM1K-R2-4-32-122F Room Air Temp Sensor, Matched ACI
T = REM. POWER PANEL
TT## + NT## 6 A/RH2-TTM1K-R2-4-32-122F Room Air Temp/Hum Sensor, Matc ACI
TT14 + NT08 1 HMS110 OA Temp/Hum Sensor Vaisala
T = DUCT HEATER
WS02 8 U006-0007 SPOT DETECTOR 14 FT LEADER CBL Veris Industries
T = REM. CO PANEL
5/27/2022
5/27/2022
HH = HUMIDITY ----------------------------------------------------------------------------------------------------------------------------------------------------
Last Printed
Last Saved
##.SS + .O + .C 56 V100 RELAY ENCLOSED SPDT 10-30V Veris Industries
PP = PRESSURE CO 1 CO-R-4X-RB-D CO Room Mount with Display, Re ACI
PD## 6 AFB24-SR Modulating, Spring Return, AC Belimo
P F FF = FLOW METER PT##-CA 5 AA56 STAINLESS PLATE/STATIC PRESSUR Veris Industries
PT##-HA 8 AA56 STAINLESS PLATE/STATIC PRESSUR Veris Industries
AA
Job Number
= ACTUATOR
A A A A PT06-OA 1 SPH20 STATIC PRESSURE HEAD HEATED Vaisala
Sheet Number
H HH H RR = FIELD RELAY
TD01 + TD02 72 NMB24-SR Modulating, Non-Fail-safe, AC Belimo
File Name
TT## 8 A/TTM1K-R2-4-32-122F Room Air Temp Sensor, Matched ACI
402-2
TT## + NT## 6 A/RH2-TTM1K-R2-4-32-122F Room Air Temp/Hum Sensor, Matc ACI
CST = CURRENT SWITCH
TT14 + NT08 1 HMS110 OA Temp/Hum Sensor Vaisala
WS02 8 U006-0007 SPOT DETECTOR 14 FT LEADER CBL Veris Industries
CT = CO SENSOR
Electric. Their use or reproduction without prior consent of
SHELL Floorplan
Date:
flow meters and pressure
transmitters.
Preliminary
# Change:
Revision:
1
2
3
4
5
T T T
5/26/2022
5/26/2022
5/26/2022
Date:
Date:
Date:
N
Designed by:
Software by:
Checked by:
Contractor:
Engineer:
Architect:
National And Strategic Accounts
SHELL Floorplan
F P
5/27/2022
5/27/2022
LEGEND
Last Printed
Last Saved
T = CONTROL PANEL
TT = TEMPERATURE
Job Number
Sheet Number
Device Qty Part Number Description Manufacturer
File Name
----------------------------------------------------------------------------------------------------------------------------------------------------
407-1
FF = FLOW METER NPW-FT01
NPW-PT01
2 FT-3204-21112-1021
2 KEL-PTX1-09
In-line EM Flow Meter, 4 in.,
STAINLESS 0-200psi/4-20 MA
Onicon
Kele
TT01 5 A/TTM1K-R2-32-122F Room Air Temp Sensor, Matched ACI
3
1
4
2
Job Number
National And Strategic Accounts Architect:
Revision: Preliminary
Engineer:
# Change: Date:
File Name Last Saved Contractor:
1
408 Panel Wall Layout.vsd 5/27/2022 Designed by: Date: 5/26/2022 2
3 These drawings and designs are the property of Schneider
Sheet Number Last Printed Software by: Date: 5/26/2022 Electric. Their use or reproduction without prior consent of
4
the company is strictly forbidden.
Panel Wall Layouts Checked by: Date: 5/26/2022 5
408-1 5/27/2022
Electric. Their use or reproduction without prior consent of
ADMIN Equipment Installation Details 1 of 3
CDT01.CO2
SL3
UI9 RET TT01 TT02
A/TTM1K-R2-4 A/TTM1K-R2-4
- PS
Date:
VOUT VOUT
TB4-3 TB4-4
SET + SET +
Preliminary
+ -
SET - SET - EF02
CDT02.CO2
SL3
OR OR 120VAC L
UI10 RET OR OR POWER
(By Others) N
- PS
+ 1
CWE Volt mA
TT03 TT04
EF03
# Change:
A/TTM1K-R2-4 A/TTM1K-R2-4
Revision:
EF03.STS
CDT03.CO2 + TB3-7DC Y1+ + TB3-8DC Y1+ SL4
1
2
3
4
5
SL3 UI4 RET
UI11 RET
- TB3-13 UI7 TT03.SERT - TB3-15 UI8 TT04.ERT
GND 24VDC-
Y2- TB3-14 RET SL3 GND 24VDC-
Y2- TB3-16 RET SL3 TB4-5 TB4-6
- PS VOUT VOUT + -
EF03
+ 1 SET + SET +
120VAC L
N.O. N.C. COM CO2 COM PWR SET - SET - POWER
RELAY CDT03
OR OR (By Others) N
5/26/2022
5/26/2022
5/26/2022
CWE Volt mA
OR OR
Date:
Date:
Date:
Designed by:
Software by:
Checked by:
Contractor:
Engineer:
Architect:
National And Strategic Accounts
Installation Details 1 of 3
ADMIN Equipment
5/27/2022
5/27/2022
Last Printed
Last Saved
Job Number
Sheet Number
File Name
Details.vsd
501-1
18
17
24
23
GND
N (-)
L (+)
FT-3200
DCW-FT01
Admin Compactor Room Flow Meter Installation Details
TB3-4
TB3-3
TB3-2
TB3-1
X3H
From
24VAC
UI2
UI1
RET
RET
X4N XFMR-#
TB-PA
TB-PA
SL3
SL3
FT01.DCW
FQ01.DCW
18
17
24
23
GND
N (-)
L (+)
FT-3200
IRR-FT01
TB3-8
TB3-7
TB3-6
TB3-5
X3H
ADMIN Equipment Installation Details 2 of 3
From
24VAC
UI4
UI3
RET
RET
X4N XFMR-#
TB-PA
TB-PA
SL3
SL3
FT01.IRR
FQ01.IRR
Job Number
National And Strategic Accounts Architect:
Revision: Preliminary
Engineer:
# Change: Date:
File Name Last Saved Contractor:
1
501 ADMIN Equipment Installation
5/27/2022 Designed by: Date: 2
Details.vsd 5/26/2022
3 These drawings and designs are the property of Schneider
Sheet Number Last Printed Software by: Date: 5/26/2022 Electric. Their use or reproduction without prior consent of
ADMIN Equipment 4
the company is strictly forbidden.
Checked by: Date: 5/26/2022 5
501-2 5/27/2022 Installation Details 2 of 3
J6
J5
-
-
-
+
+
J1 +
NC 1
C3
NO 5
NC 2
C4
NO 6
NC 1
C3
NO 5
NC 2
C4
NO 6
EF01-HDT01
EF01-HDT01
KEL-GDD-H2
869-STR-B-AQ
TB4-8
TB4-7
UI4
RET
X4N
X3H
Compactor Room Hydrogen Sensor Installation Details
SL4
TB-PA
TB-PA
EF01-HDT01.ALM
WHT/BLU WHT/BLU
BLU
BLU
BRN
GRY
ORG
ORG
+
UI1
SL4
WHT/YEL WHT/YEL
EF01.SS
SL4
EF01
NO1 COM
EF01
TB4-17 TB4-9AC
-
RET
TB4-1 TB4-2
EF01-HDT01
WHT/BLK WHT/BLK
VIO
YEL
YEL
EF01
L
L
N
N
120VAC
POWER
Shunt Trip
(By Others)
Forklift Charger
ADMIN Equipment Installation Details 3 of 3
Job Number
National And Strategic Accounts Architect:
Revision: Preliminary
Engineer:
# Change: Date:
File Name Last Saved Contractor:
1
501 ADMIN Equipment Installation
5/27/2022 Designed by: Date: 2
Details.vsd 5/26/2022
3 These drawings and designs are the property of Schneider
Sheet Number Last Printed Software by: Date: 5/26/2022 Electric. Their use or reproduction without prior consent of
ADMIN Equipment 4
the company is strictly forbidden.
Checked by: Date: 5/26/2022 5
501-3 5/27/2022 Installation Details 3 of 3
Electric. Their use or reproduction without prior consent of
COLO-AHU Equipment Installation Details 1 of 2
Hi Lo Hi Lo
N.C. N.C.
L1 L2 L3 L1 L2 L3
1.1.2 1.1.2
Date:
From From
VFD VFD
Preliminary
L1 L2 L3 L1 L2 L3
1.1.3 Supply Air Fan 3-Status 1.1.3 Supply Air Fan 4-Status
4 5 6
# Change:
Revision:
Hi Lo Hi Lo
N.C. N.C.
1
2
3
4
5
SF TB4:21 UI11 SF03.STS SF TB4:23 UI12 SF04.STS
03 TB4:22 RET SL4 04 TB4:24 RET SL4
L1 L2 L3 L1 L2 L3
1.1.2 1.1.2
From From
1.1.2 Supply Air Fan VFD Wiring VFD VFD
5/26/2022
5/26/2022
5/26/2022
VFD Field SE Panel L1 L2 L3 L1 L2 L3
VFD Board
TBD TB6:1 VO1 SC01.SPD
Speed Command
TBD TB6:2 RET SL6
Date:
Date:
Date:
TBD TB3:25 UI13 SC01.FB
Speed Feedback
TBD TB3:26 RET SL3 1.1.3 Supply Air Fan 5-Status 1.1.3 Supply Air Fan 6-Status
Designed by:
Software by:
Checked by:
Contractor:
Engineer:
Architect:
TBD N.C. N.C.
Not Used
TBD
TBD TB4:31 UI16 SC01.FLT SF TB4:25 UI13 SF05.STS SF TB4:27 UI14 SF06.STS
Fault TBD TB4:32 RET SL4 05 TB4:26 RET SL4 06 TB4:28 RET SL4
Installation Details 1 of 2
COLO-AHU Equipment
1.1.2 1.1.2
TBD TB4:29 UI15 SC01.STS
From From
Running TBD TB4:30 RET SL4
VFD VFD
TBD
L1 L2 L3 L1 L2 L3
+ TBD
BACnet MSTP From: See Network Architecture
- TBD
GND TBD
To: See Network Architecture
TB-PA X7H
TB-PA X8N
5/27/2022
5/27/2022
SL4 RET TB3-6
Last Printed
Last Saved
WS02.WD UI2 TB3-5
Job Number
Sheet Number
File Name
Details.vsd
502-1
Electric. Their use or reproduction without prior consent of
COLO-AHU Equipment Installation Details 2 of 2
= Cap unused wires = Cap unused wires = Cap unused wires = Cap unused wires
TB-PA X5H TB6-3AC HOT TB-PA X5H TB6-4AC HOT TB-PA X5H TB6-2AC HOT TB-PA X3H R1-5 HOT
TB-PA X6N TB6-6 COM Switch provided TB-PA X6N TB6-8 COM Switch provided TB-PA X6N TB6-4 COM Switch provided TB-PA X4N TB5-18 COM Switch provided
SL6 COM for selection of SL6 COM for selection of SL6 COM for selection of SL6 COM for selection of
TD01.CMD VO3 TB6-5 AI direct or reverse TD02.CMD VO4 TB6-7 AI direct or reverse TD03.CMD VO2 TB6-3 AI direct or reverse PD01.CMD VO5 TB5-17 AI direct or reverse
AO acting AO acting AO acting AO acting
CCW CW control mode CCW CW control mode CCW CW control mode CCW CW control mode
Clockwise or counterclockwise
spring return is determined by
actuator mounting position
Date:
WHT AI WHT AI WHT AI WHT AI
AO AO AO AO
Preliminary
CCW CW CCW CW CCW CW CCW CW
# Change:
Revision:
RED HOT
BLK COM
SL3 RET TB3-6 SL3 RET TB3-4 SL3 RET TB3-10
TD01.FB UI3 TB3-5 TD03.FB UI2 TB3-3 PD01.FB UI5 TB3-9
WHT AI
1
2
3
4
5
AO
CCW CW
RED HOT
BLK COM
5/26/2022
5/26/2022
5/26/2022
WHT AI
AO
CCW CW
Date:
Date:
Date:
1.6.11 Face Damper Wiring RED HOT
BLK COM Outside Air Damper Wiring Order
= Cap unused wires
WHT AI
TB-PA X5H TB6-5AC HOT AO
TB-PA X6N TB6-10 COM CCW CW
Switch provided
SL6 COM for selection of
ND01.CMD VO5 TB6-9 AI direct or reverse
Designed by:
Software by:
Checked by:
AO acting
Contractor:
CCW CW control mode
Engineer:
Architect:
Clockwise or counterclockwise
spring return is determined by SL3 RET TB3-7
actuator mounting position TD02.FB UI4 TB3-8
RED HOT
Installation Details 2 of 2
COLO-AHU Equipment
WHT AI PD02.CMD PD02 PD02 PD02
AO
CCW CW
RED HOT
BLK COM
5/27/2022
5/27/2022
ND01.FB UI6 TB3-11
Last Printed
CCW CW control mode
Last Saved
RED HOT
Job Number
COM
Sheet Number
AO PD01.FB
File Name
CCW CW
Details.vsd
502-2
SL3 RET TB3-14
ND02.FB UI7 TB3-13 PD01.CMD PD01 PD01 PD01
Electric. Their use or reproduction without prior consent of
COLO Equipment Installation Details 1 of 7
8 T- UI# TT14.OAT
7 T+ TB#-#DC Y1+
ACI
6 HUM- A/TTM1K-R2-4
5 HUM+ 24VDC-
Y2- RET PHX11-COLO#-CE#-CC01
UI# NT08.OAH
+ TB#-#DC Y1+
Service
Vaisala TB#-#DC Y1+
- UI# TT##.HAT
Port
HMS110 OA T/Rh GND 24VDC-
Y2- RET PHX11-COLO#-CE#-CC01
Date:
VOUT
4 Pwr+ SET +
Preliminary
3 Pwr- SET -
2 RS485- OR
1 RS485+ OR
ACI
A/RH2-TTM1K-
R2-4
# Change:
Revision:
+ TB#-#DC Y1+
- UI# TT##.CAT
GND
1
2
3
4
5
24VDC-
Y2- RET PHX11-COLO#-CE#-CC01
VOUT
4-20 mA TB#-#DC Y1+
VOUT
5/26/2022
5/26/2022
5/26/2022
Date:
Date:
Date:
Designed by:
Software by:
Checked by:
Contractor:
Engineer:
Temp/Rh Sensor Placement Details
Architect:
Details 1 of 7
5/27/2022
5/27/2022
Last Printed
Last Saved
Job Number
Sheet Number
File Name
Details.vsd
503-1
SETRA
MR1SA
IT Space Control Sensor Installation Details
Y2-
UI#
RET
TB#-#DC
Y1+
PT##.SRP
PHX11-COLO#-CE#-CC01
HOT
AISLE
Tubing Connections
(Bottom of MR1SA Sensor)
OUTSIDE
COLO Equipment Installation Details 2 of 7
AA56
Job Number
National And Strategic Accounts Architect:
Revision: Preliminary
Engineer:
# Change: Date:
File Name Last Saved Contractor:
1
503 COLO Equipment Installation
5/27/2022 Designed by: Date: 2
Details.vsd 5/26/2022
3 These drawings and designs are the property of Schneider
Sheet Number Last Printed Software by: Date: 5/26/2022 Electric. Their use or reproduction without prior consent of
COLO Equipment Installation 4
the company is strictly forbidden.
Checked by: Date: 5/26/2022 5
503-2 5/27/2022 Details 2 of 7
SETRA
MR1SA
Outside Air Pressure Sensor Installation Details
Y2-
UI#
RET
TB#-#DC
Y1+
PT##.HAP
PHX11-COLO#-CE#-CC01
HOT
AISLE
Tubing Connections
(Bottom of MR1SA Sensor)
OUTSIDE
COLO Equipment Installation Details 3 of 7
AA56
AA56
Job Number
National And Strategic Accounts Architect:
Revision: Preliminary
Engineer:
# Change: Date:
File Name Last Saved Contractor:
1
503 COLO Equipment Installation
5/27/2022 Designed by: Date: 2
Details.vsd 5/26/2022
3 These drawings and designs are the property of Schneider
Sheet Number Last Printed Software by: Date: 5/26/2022 Electric. Their use or reproduction without prior consent of
COLO Equipment Installation 4
the company is strictly forbidden.
Checked by: Date: 5/26/2022 5
503-3 5/27/2022 Details 3 of 7
Electric. Their use or reproduction without prior consent of
COLO Equipment Installation Details 4 of 7
Date:
WHT AI WHT AI
Preliminary
AO AO
CCW CW CCW CW
RED HOT
BLK COM
# Change:
Revision:
RED HOT
BLK COM
1
2
3
4
5
WHT AI
AO
CCW CW
5/26/2022
5/26/2022
5/26/2022
SL# RET TB#-##
PD01.FB UI# TB#-## PD02.CMD
PD02.FB
PD01.FB
Date:
Date:
Date:
Designed by:
Software by:
Checked by:
Contractor:
Engineer:
Architect:
Details 4 of 7
5/27/2022
5/27/2022
Last Printed
Last Saved
Job Number
Sheet Number
File Name
Details.vsd
503-4
BLACK
WHITE
KELE
PTX1-09
Y2-
24VDC-
Non-Potable Water Sensor Installation Details
UI#
RET
TB#-#DC
Y1+
TT##.HAT
PHX11-COLO#-CE#-CC01
18
17
24
23
GND
N (-)
L (+)
FT-3200
NPW-FT01
UI#
UI#
RET
RET
X6N
X5H
TB-PA
TB-PA
TT##.HAT
TT##.HAT
PHX11-COLO#-CE#-CC01
PHX11-COLO#-CE#-CC01
COLO Equipment Installation Details 5 of 7
24VAC
From XFMR-#
Job Number
National And Strategic Accounts Architect:
Revision: Preliminary
Engineer:
# Change: Date:
File Name Last Saved Contractor:
1
503 COLO Equipment Installation
5/27/2022 Designed by: Date: 2
Details.vsd 5/26/2022
3 These drawings and designs are the property of Schneider
Sheet Number Last Printed Software by: Date: 5/26/2022 Electric. Their use or reproduction without prior consent of
COLO Equipment Installation 4
the company is strictly forbidden.
Checked by: Date: 5/26/2022 5
503-5 5/27/2022 Details 5 of 7
2
1
Outside Air Pressure Pickup Port Detail
Y4-
Y3+
TB-PA
TB-PA
RPP
COLO Equipment Installation Details 6 of 7
Job Number
National And Strategic Accounts Architect:
Revision: Preliminary
Engineer:
# Change: Date:
File Name Last Saved Contractor:
1
503 COLO Equipment Installation
5/27/2022 Designed by: Date: 2
Details.vsd 5/26/2022
3 These drawings and designs are the property of Schneider
Sheet Number Last Printed Software by: Date: 5/26/2022 Electric. Their use or reproduction without prior consent of
COLO Equipment Installation 4
the company is strictly forbidden.
Checked by: Date: 5/26/2022 5
503-6 5/27/2022 Details 6 of 7
1
Battery Room CO Sensor and Exhaust Fan Wiring
2
120VAC
POWER
(By Others)
L
N
COLO 2 and 4 Bathroom Exhaust Fan Wiring
+
UI14
SL4
EF01
-
EF01.STS
RET
TB4-3 TB4-4
COLO Equipment Installation Details 7 of 7
EF01
Job Number
National And Strategic Accounts Architect:
Revision: Preliminary
Engineer:
# Change: Date:
File Name Last Saved Contractor:
1
503 COLO Equipment Installation
5/27/2022 Designed by: Date: 2
Details.vsd 5/26/2022
3 These drawings and designs are the property of Schneider
Sheet Number Last Printed Software by: Date: 5/26/2022 Electric. Their use or reproduction without prior consent of
COLO Equipment Installation 4
the company is strictly forbidden.
Checked by: Date: 5/26/2022 5
503-7 5/27/2022 Details 7 of 7
Electric. Their use or reproduction without prior consent of
ADMIN Panel Power Detail
Date:
X3H CB9
24VAC
Preliminary
X3H X3H
Wired from 24VAC
X3H
XFR2 Wired to
X3H
End Devices
X4N X4N X4N
X4N
X4N
G
TB-PA
X5H CB10
24VAC
X5H X5H
Wired from 24VAC
X5H
XFR3 Wired to
X5H
# Change:
End Devices
Revision:
X6N X6N X6N
X6N
X6N
G
1
2
3
4
5
TB-PA
X7H CB11
24VAC
X7H X7H
Wired from 24VAC
X7H
XFR4 Wired to
X7H
End Devices
X8N X8N X8N
X8N
5/26/2022
5/26/2022
5/26/2022
X8N
G
TB-PA
Y1+ CB12
24VDC
Y1+ Y1+
Wired from 24VDC
Date:
Date:
Date:
Y1+
PS1 Wired to
Y2-
End Devices
Y2- Y2- Y2-
G
Designed by:
Software by:
Checked by:
Contractor:
Engineer:
Architect:
Panel Continued on Next Page
5/27/2022
5/27/2022
Last Printed
Last Saved
CKT#:_____________________
MAX VOLTAGE: 24v
SSCR = 10kA
TOTAL FLA : 9.40A
Job Number
Sheet Number
CB9 (24VAC) = 4.00A
File Name
601-1
CB10 (24VAC) = 4.00A
CB11 (24VAC) = 4.00A
CB12 (24VDC) = 4.00A
See Network Architecture
See Network Architecture
Room#
Room#
Switch ##
Switch ##
Port#
Port#
TB-C
E2
E1
ETH2
ETH1
AS-P
TAHUYA
TB-PA
TB-PA
TB-PA
TB-PA
Y2-
Y1+
X1H
X2N
L/+
2
L/-
4
GND
F-0
1A Fuse
SXW PS-24V
SL1
Schneider Electric
ADMIN Panel IO Detail - 1 & 2
TX/RX+
Host
2
TX/RX-
Device
Com A
3
RET
4
BIAS+
5
RS-485
TX/RX+
6
TX/RX-
Com B
7
RET
1 2 3 4 5 6 7 8
TX/RX+
TX/RX-
10/100
SXW AS-P
RS-485
Ethernet 1
9 10
RET
LON
SL2
LON-1
Schneider Electric
11 12
LON-2
TP/FT
10/100
Ethernet 2
TAHUYA Adapter
TAHUYA
Job Number
National And Strategic Accounts Architect:
Revision: Preliminary
Engineer:
# Change: Date:
File Name Last Saved Contractor:
1
601 ADMIN Panel.vsd 5/27/2022 Designed by: Date: 5/26/2022 2
3 These drawings and designs are the property of Schneider
Sheet Number Last Printed Software by: Date: 5/26/2022 Electric. Their use or reproduction without prior consent of
ADMIN Panel IO Detail - 1 & 4
the company is strictly forbidden.
Checked by: Date: 5/26/2022 5
601-2 5/27/2022 2
Electric. Their use or reproduction without prior consent of
ADMIN Panel IO Detail - 3
TB-03
1 Top Bottom
23 1 UI1 SL3
FT01.DCW DCW FLOW TB##
24 2 RET SL3
1AC X3H TB-PA TB-03 7 9 TB-03
1DC Y1+ TB-PA
Date:
17 3 UI2 SL3
FQ01.DCW DCW FLOW TOTAL
18 4 X4N TB-PA TB-03 5 11 TB-03
2AC TB-03 3 13 TB-03
Preliminary
2DC TB-03 2
S1
S1 TB-03 1 15 TB-03
23 5 UI3 SL3
FT01.IRR IRR FLOW
24 6 Y2- TB-PA
1 2 3 4 5 6 7 8 9 10 11 12
3AC
RET
RET
RET
RET
UI1
UI2
UI3
UI4
UI5
UI6
UI7
UI8
3DC
17 7 UI4 SL3
Q01.IRR IRR FLOW TOTAL
18 8
4AC 1 2 3 4 5 6 7 8
Universal Inputs
4DC
# Change:
+ 10
Revision:
5AC SXW UI-16
5DC
SL3
- 11 UI6 SL3
TT02.FCRT FCR TEMP Universal Inputs
1
2
3
4
5
+ 12 9 10 11 12 13 14 15 16
6AC
6DC
UI10
UI11
UI12
UI13
UI14
UI15
UI16
RET
RET
RET
RET
UI9
S2
S2
13 14 15 16 17 18 19 20 21 22 23 24
- 13 UI7 SL3
TT03.SERT SER ROOM TEMP
+ 14
7AC TB-03 17 31 TB-03
5/26/2022
5/26/2022
5/26/2022
7DC
Date:
Date:
Date:
9AC
9DC
Designed by:
S3
Software by:
Checked by:
Contractor:
CO2 21 UI11 SL3
Engineer:
Architect:
CDT03.CO2 BREAK ROOM CO2 LEVEL
PWR 22
11AC
11DC
23 UI12 SL3
24
5/27/2022
5/27/2022
16DC
Last Printed
Last Saved
Job Number
601-3
Panel Continued on Next Page
Label wiring, cabling, and conduit with point name at each end within 5 cm (2 in.)
1
of termination.
Electric. Their use or reproduction without prior consent of
ADMIN Panel IO Detail - 4
TB-04
1 Top Bottom
COMPACTOR ROOM/FORKLIFT CHARGER EXHAUST FAN NO 1 UI1 SL4
EF01.STS TB##
STATUS COM 2 RET SL4
1AC X3H TB-PA
1DC Y1+ TB-PA
Date:
NO 3 UI2 SL4 TB-04 19
EF02.STS LOADING DOCK RESTROOM EXHAUST FAN STATUS
COM 4 X4N TB-PA
2AC 21 TB-04
Preliminary
2DC TB-04 17
S1 TB-PA X3H
S1 23 TB-04
NO 5 UI3 SL4
EF03.STS LOBBY RESTROOM EXHAUST FAN STATUS
COM 6 Y2- TB-PA
1 2 3 4 5 6 7 8 9 10 11 12
3AC
COM
COM
COM
COM
NO1
NO2
NO3
NO4
NC1
NC2
NC3
NC4
3DC
# Change:
9 10
Revision:
5AC SXW UI-8/DO-FC-4-H
5DC
SL4
5 11 UI6 SL4
CC01-QS02.PA DDC SECONDARY POWER AVAILABLE Universal Inputs
1
2
3
4
5
9 12 1 2 3 4 5 6 7 8
6AC
6DC
RET
RET
RET
RET
UI1
UI2
UI3
UI4
UI5
UI6
UI7
UI8
S2
S2
13 14 15 16 17 18 19 20 21 22 23 24
13 UI7 SL4
14
7AC TB-04 1 15 TB-04
5/26/2022
5/26/2022
5/26/2022
7DC
15 UI8 SL4 TB-04 2
16 TB-04 3 13 TB-04
8AC TB-04 5 11 TB-04
8DC
Date:
Date:
Date:
WHT/YEL
9AC
9DC
19 NO2 SL4
20
10AC
10DC
S3
Designed by:
S3
Software by:
Checked by:
Contractor:
21 NO3 SL4
Engineer:
Architect:
22
11AC
11DC
23 NO4 SL4
24
5/27/2022
5/27/2022
Last Printed
Last Saved
Job Number
601-4
Panel Continued on Next Page
Label wiring, cabling, and conduit with point name at each end within 5 cm (2 in.)
1
of termination.
Low Voltage
5.5in. DUCT1
27.61 x 1.00
27.61 x 1.00
27.60 x 1.00
Date:
Preliminary
12.90 x 1.25
7.0in.
DUCT1
# Change:
Revision:
1
2
3
4
5
12.90 x 1.25
F-0
6.8in.
TB-03
DUCT1
5/26/2022
5/26/2022
5/26/2022
SL4
29.6in. 31.5in.
DUCT1
13.20 x 1.00
DUCT1
Date:
Date:
Date:
DUCT1
5.3in.
Designed by:
Software by:
Checked by:
Contractor:
13.20 x 1.00
Engineer:
Architect:
DUCT1
TB-04
TB-PA
21.70 x 1.00
DUCT1
PNL2
5/27/2022
5/27/2022
M9F42104 5 4 Amp CB Schneider Electric
Last Printed
Last Saved
NSYTRAABV35 2 END BRACKET SCREW TYPE Square D
NSYTRAC22 1 END COVER Square D
NSYTRV42 1 6MM TERMINAL BLOCK GRAY Square D
NSYTRV42SF5 1 TERMINAL BLOCK GREY Square D
SEBOX322408P 1 ENCL 32X24X08 NEMA 4 W/ PERF Schneider Electric
Job Number
SXWASPXXX10001 1 SMARTX CONTROLLER AS-P Schneider Electric
Sheet Number
SXWTBASW110002 1 TB-ASP-W1 TERM BASE ASP W1 Schneider Electric
File Name
SXWTBIOW110001 2 TB-IO-W1 TERM BASE I/O W1 Schneider Electric
601-5
SXWTBPSW110001 1 TB-PS-W1 TERM BASE PWR SUP W1 Schneider Electric
SXWUI16XX10001 1 UI-16 16 UNIVERSAL IN Schneider Electric
SXWUI8D4H10001 1 UI-8/DO-FC-4-H UI/DO FRMC HAND Schneider Electric
PNL2
23.6in.
PANEL LABEL
31.5in.
ADMIN Panel Layout - Door
Job Number
National And Strategic Accounts Architect:
Revision: Preliminary
Engineer:
# Change: Date:
File Name Last Saved Contractor:
1
601 ADMIN Panel.vsd 5/27/2022 Designed by: Date: 5/26/2022 2
3 These drawings and designs are the property of Schneider
Sheet Number Last Printed Software by: Date: 5/26/2022 Electric. Their use or reproduction without prior consent of
4
the company is strictly forbidden.
ADMIN Panel Layout - Door Checked by: Date: 5/26/2022 5
601-6 5/27/2022
Electric. Their use or reproduction without prior consent of
COLO-AHU Panel Power Detail
Date:
XFR1 24VAC
X1H PH01.HS UI3 TB5:5
Wired to
X2N X2N X2N SL5 RET TB5:6 4
Controller
Preliminary
X2N 8 12
X2N G
G 2 TBPA
TB-PA PD01 Actuator Power 6 10 X5H
X3H CB#
Set Reset PB1
1
24VAC 13 LR1 14 9 LR1 12 NO COM
X3H X3H PD01 Actuator Power 5 9 X4N TBPA
Wired from 24VAC
X3H X3H TBPA
XFR2 Wired to
X3H
End Devices LR1-1
14
13
X4N
R1
X4N X4N
1 10
X4N
X4N
NO COM
G H L
# Change:
HSL2
Revision:
TB-PA
Set @ 0.3"
X5H CB#
24VAC
X5H X5H
1
2
3
4
5
Wired from 24VAC
X5H
XFR3 Wired to
X5H
End Devices
X6N X6N X6N
X6N
X6N
G
TB-PA
X7H CB#
5/26/2022
5/26/2022
5/26/2022
24VAC
X7H X7H
Wired from 24VAC
X7H
XFR4 Wired to
X7H
End Devices
X8N X8N X8N
X8N
Date:
Date:
Date:
X8N
G
TB-PA
Y1+ CB#
24VDC
Y1+ Y1+
Wired from 24VDC
Y1+
PS1 Wired to
Y2-
End Devices
Designed by:
Software by:
Checked by:
Y2- Y2- Y2-
Contractor:
Engineer:
Architect:
G
5/27/2022
Last Printed
Last Saved
CKT#:_____________________
MAX VOLTAGE: 24v
SSCR = 10kA
TOTAL FLA : 9.40A
Job Number
CB8 (24VAC) = 4.00A
Sheet Number
CB9 (24VAC) = 4.00A
File Name
602-1
CB10 (24VAC) = 4.00A
CB11 (24VAC) = 4.00A
CB12 (24VDC) = 4.00A
See Network Architecture
See Network Architecture
Room#
Room#
Switch ##
Switch ##
Port#
Port#
TB-C
E2
E1
ETH2
ETH1
AS-P
TAHUYA
TB-PA
TB-PA
TB-PA
TB-PA
Y2-
X1H
X2N
Y1+
L/+
2
L/-
4
GND
F-0
1A Fuse
SXW PS-24V
SL1
Schneider Electric
COLO-AHU Panel IO Detail - 1 & 2
TX/RX+
Host
2
TX/RX-
Device
Com A
3
RET
4
BIAS+
5
RS-485
TX/RX+
6
TX/RX-
Com B
7
RET
1 2 3 4 5 6 7 8
TX/RX+
TX/RX-
10/100
SXW AS-P
RS-485
Ethernet 1
9 10
RET
LON
SL2
LON-1
Schneider Electric
11 12
LON-2
TP/FT
10/100
Ethernet 2
TAHUYA Adapter
Panel Continued on Previous Page
TAHUYA
Job Number
National And Strategic Accounts Architect:
Revision: Preliminary
Engineer:
# Change: Date:
File Name Last Saved Contractor:
1
602 AHU Panel.vsd 5/27/2022 Designed by: Date: 5/26/2022 2
3 These drawings and designs are the property of Schneider
Sheet Number Last Printed Software by: Date: 5/26/2022 Electric. Their use or reproduction without prior consent of
COLO-AHU Panel IO Detail - 4
the company is strictly forbidden.
Checked by: Date: 5/26/2022 5
602-2 5/27/2022 1&2
Electric. Their use or reproduction without prior consent of
COLO-AHU Panel IO Detail - 3
TB-03
1
Top Bottom
- 1 UI1 SL3
TT01.SAT AHU SUPPLY AIR TEMP TB##
+ 2 RET SL3
1AC X3H TB-PA TB-03 7 9 TB-03
1DC Y1+ TB-PA
Date:
Org 3 UI2 SL3
TD03.FB RETURN AIR DAMPER FEEDBACK
Blk 4 X4N TB-PA TB-03 5 11 TB-03
2AC TB-03 3 13 TB-03
Preliminary
2DC
S1 TB-03 2
S1 TB-03 1 15 TB-03
Org 5 UI3 SL3
TD01.FB OUTSIDE AIR DAMPER A FEEDBACK
Blk 6 Y2- TB-PA
1 2 3 4 5 6 7 8 9 10 11 12
3AC
RET
RET
RET
RET
UI1
UI2
UI3
UI4
UI5
UI6
UI7
UI8
3DC
Org 7 UI4 SL3
TD02.FB OUTSIDE AIR DAMPER B FEEDBACK
Blk 8
4AC 1 2 3 4 5 6 7 8
Universal Inputs
4DC
# Change:
Blk 10
Revision:
5AC SXW UI-16
5DC
SL3
Org 11 UI6 SL3
ND01.FB FACE DAMPER FEEDBACK Universal Inputs
1
2
3
4
5
Blk 12 9 10 11 12 13 14 15 16
6AC
6DC
UI10
UI11
UI12
UI13
UI14
UI15
UI16
RET
RET
RET
RET
UI9
S2
S2
13 14 15 16 17 18 19 20 21 22 23 24
Org 13 UI7 SL3
ND02.FB BYPASS DAMPER FEEDBACK
Blk 14
7AC TB-03 17 31 TB-03
5/26/2022
5/26/2022
5/26/2022
7DC TB-03 18
+ 15 UI8 SL3
CT01.CON CONDUCTIVITY
- 16 TB-03 19 29 TB-03
8AC TB-03 21 27 TB-03
8DC
- 17 UI9 SL3
TT02.MAT MIXED AIR TEMP
+ 18 RET SL3 TB-03 23 25 TB-03
Date:
Date:
Date:
9AC
9DC
mA 19 UI10 SL3
NT01.SAH SUPPLY AIR HUMIDITY 01
VIN 20
10AC
10DC
S3
Designed by:
S3
Software by:
Checked by:
Contractor:
mA 21 UI11 SL3
Engineer:
Architect:
NT02.SAH SUPPLY AIR HUMIDITY 02
VIN 22
11AC
11DC
+ 23 UI12 SL3
FT01.SAF SUPPLY AIR FLOW
-
3
14AC
14DC
S4
S4
29 UI15 SL3
30
15AC
15DC
31 UI16 SL3
32
16AC
5/27/2022
16DC
Last Printed
Last Saved
Job Number
Sheet Number
File Name
602-3
Panel Continued on Next Page
Label wiring, cabling, and conduit with point name at each end within 5 cm (2 in.)
1
of termination.
Electric. Their use or reproduction without prior consent of
COLO-AHU Panel IO Detail - 4
TB-04
1
Top Bottom
NO 1 UI1 SL4
WS01.WD AHU LEAK DETECTION TB##
COM 2 RET SL4
1AC X3H TB-PA TB-04 7 9 TB-04
1DC Y1+ TB-PA
Date:
NO 3 UI2 SL4
WS02.WD GALLERY LEAK DETECTION
COM 4 X4N TB-PA TB-04 5 11 TB-04
2AC TB-04 3 13 TB-04
Preliminary
2DC
S1 TB-04 2
S1 TB-04 1 15 TB-04
S3 5 UI3 SL4
LCV01.FB NPW MAKEUP WATER VALVE FEEDBACK
S1 6 Y2- TB-PA
1 2 3 4 5 6 7 8 9 10 11 12
3AC
RET
RET
RET
RET
UI1
UI2
UI3
UI4
UI5
UI6
UI7
UI8
3DC
S3 7 UI4 SL4
LCV02.FB CWD DRAIN VALVE FEEDBACK
S1 8
4AC 1 2 3 4 5 6 7 8
Universal Inputs
4DC
# Change:
## 10
Revision:
5AC SXW UI-16
5DC
SL4
## 11 UI6 SL4
LH01.NL EVAP COOLER HIGH LEVEL Universal Inputs
1
2
3
4
5
## 12 9 10 11 12 13 14 15 16
6AC
6DC
UI10
UI11
UI12
UI13
UI14
UI15
UI16
RET
RET
RET
RET
UI9
S2
S2
13 14 15 16 17 18 19 20 21 22 23 24
## 13 UI7 SL4
LL01.LL EVAP COOLER LOW LEVEL
## 14
7AC TB-04 17 31 TB-04
5/26/2022
5/26/2022
5/26/2022
7DC TB-04 18
+ 15 UI8 SL4
EP01.STS EVAP COOLER PUMP STATUS
- 16 TB-04 19 29 TB-04
8AC TB-04 21 27 TB-04
8DC
+ 17 UI9 SL4
SF01.STS SUPPLY FAN 01 STATUS
- 18 RET SL4 TB-04 23 25 TB-04
Date:
Date:
Date:
9AC
9DC
+ 19 UI10 SL4
SF02.STS SUPPLY FAN 02 STATUS
- 20
10AC
10DC
S3
Designed by:
S3
Software by:
Checked by:
Contractor:
+ 21 UI11 SL4
Engineer:
Architect:
SF03.STS SUPPLY FAN 03 STATUS
- 22
11AC
11DC
+ 23 UI12 SL4
SF04.STS SUPPLY FAN 04 STATUS
-
4
14AC
14DC
S4
S4
+ 29 UI15 SL4
SC01.STS SUPPLY FAN AFD STATUS
- 30
15AC
15DC
+ 31 UI16 SL4
SC01.FLT SUPPLY FAN AFD FAULT
- 32
16AC
5/27/2022
16DC
Last Printed
Last Saved
Job Number
Sheet Number
File Name
602-4
Panel Continued on Next Page
Label wiring, cabling, and conduit with point name at each end within 5 cm (2 in.)
1
of termination.
Electric. Their use or reproduction without prior consent of
COLO-AHU Panel IO Detail - 5
TB-05
1
Top Bottom
5 1 UI1 SL5
QS01.PA PRIMARY POWER AVAILABLE TB##
9 2 RET SL5
Date:
1AC X3H TB-PA
1DC Y1+ TB-PA
5 3 UI2 SL5 21 TB-05
Preliminary
QS02.PA SECONDARY POWER AVAILABLE
9 4 X4N TB-PA TB-05 19
2AC TB-05 18 23 TB-05
2DC TB-05 17
S1
S1
1 2 3 4 5 6 7 8 9 10 11 12
12 5 UI3 SL5
PH01.HS HIGH STATIC PRESSURE SWITCH
CO1
CO2
CO3
CO4
RET
RET
RET
RET
VO1
VO2
VO3
VO4
4 6 Y2- TB-PA
3AC
3DC
7 UI4 SL5 1 2 3 4
Analog Outputs
8
4AC
Schneider Electric
# Change:
4DC
Revision:
9 UI5 SL5 SXW UI-8/AO-4-H
10
SL5
5AC
Universal Inputs
1
2
3
4
5
5DC 1 2 3 4 5 6 7 8
11 UI6 SL5
12
RET
RET
RET
RET
UI1
UI2
UI3
UI4
UI5
UI6
UI7
UI8
6AC
6DC
13 14 15 16 17 18 19 20 21 22 23 24
S2
S2
13 UI7 SL5 TB-05 1 15 TB-05
5/26/2022
5/26/2022
5/26/2022
14 TB-05 2
7AC
7DC TB-05 3 13 TB-05
15 UI8 SL5 TB-05 5 11 TB-05
16
8AC
8DC TB-05 7 9 TB-05
Date:
Date:
Date:
WHT 17 VO1 SL5
PD01.CMD EXHAUST AIR DAMPER COMMAND BLK 18 RET SL5
RED 9AC
R1 6 9DC
19 VO2 SL5
20
10AC
Designed by:
10DC
Software by:
Checked by:
Contractor:
S3
Engineer:
Architect:
S3
21 VO3 SL5
22
11AC
5
602 AHU Panel.vsd 5/27/2022
5/27/2022
Last Printed
Last Saved
Job Number
Sheet Number
File Name
602-5
Panel Continued on Next Page
Label wiring, cabling, and conduit with point name at each end within 5 cm (2 in.)
1
of termination.
Electric. Their use or reproduction without prior consent of
COLO-AHU Panel IO Detail - 6
TB-06
1
Top Bottom
## 1 VO1 SL6
SC01.SPD SUPPLY FAN SPEED COMMAND
## 2 RET SL6
1AC X5H TB-PA
1DC Y1+ TB-PA
Date:
WHT 3 VO2 SL6
TD03.CMD RETURN AIR DAMPER COMMAND BLK 4 X6N TB-PA
RED 2AC 5 TB-06
Preliminary
2DC TB-06 3
S1 TB-06 2 7 TB-06
S1 TB-06 1
WHT 5 VO3 SL6
TD01.CMD OUTSIDE AIR DAMPER A COMMAND BLK 6 Y2- TB-PA
1 2 3 4 5 6 7 8 9 10 11 12
RED 3AC
CO1
CO2
CO3
CO4
RET
RET
RET
RET
VO1
VO2
VO3
VO4
3DC
WHT 7 VO4 SL6
TD02.CMD OUTSIDE AIR DAMPER B COMMAND BLK 8
RED 4AC 1 2 3 4
Analog Outputs
4DC
WHT 9 VO5 SL6
Schneider Electric
# Change:
ND01.CMD FACE DAMPER COMMAND BLK 10 RET SL6
Revision:
RED 5AC SXW AO-8-H
5DC SL6
WHT 11 VO6 SL6
Analog Outputs
1
2
3
4
5
ND02.CMD BYPASS DAMPER COMMAND BLK 12 5 6 7 8
RED 6AC
6DC
CO5
CO6
CO7
CO8
RET
RET
RET
RET
VO5
VO6
VO7
VO8
S2
S2
13 14 15 16 17 18 19 20 21 22 23 24
13 VO7 SL6
14
7AC TB-06 9
5/26/2022
5/26/2022
5/26/2022
7DC TB-06 10 15 TB-06
15 VO8 SL6 TB-06 11
16 13 TB-06
8AC
8DC
Date:
Date:
Date:
Designed by:
Software by:
Checked by:
Contractor:
Engineer:
Architect:
6
602 AHU Panel.vsd 5/27/2022
5/27/2022
Last Printed
Last Saved
Job Number
Sheet Number
File Name
602-6
Panel Continued on Next Page
Label wiring, cabling, and conduit with point name at each end within 5 cm (2 in.)
1
of termination.
Electric. Their use or reproduction without prior consent of
COLO-AHU Panel IO Detail - 7
TB-07
1
1 NC1 SL7
BLK 2 X8N TB-PA
LCV01.OC NPW MAKEUP WATER VALVE
RED 3 NO1 SL7
4 NC2 SL7
Date:
BLK 5 TB-07 6 7 TB-07
LCV02.OC CWD DRAIN VALVE
RED 6 NO2 SL7
7 NC3 SL7 TB-07 4 9 TB-07
Preliminary
BLK 8 TB-07 3 10 TB-07
CCV01.OC BLEED VALVE
RED 9 NO3 SL7 TB-PA X7H
10 NC4 SL7 TB-07 1 12 TB-07
## 11
TB##
EP01.SS EVAP COOLER PUMP START/STOP
## 12 NO4 SL7
1 2 3 4 5 6 7 8 9 10 11 12
13 NC5 SL7
COM
COM
COM
COM
NO1
NO2
NO3
NO4
NC1
NC2
NC3
NC4
WHT/yl 14
SC01.SS SUPPLY FAN START/STOP
WHT/bl 15 NO5 SL7
16 NC6 SL7
17 1 2 3 4
Digital Outputs
18 NO6 SL7
19 NC7 SL7
Schneider Electric
# Change:
20
Revision:
21 NO7 SL7 SXW DO-FC-8-H
22 NC8 SL7 SL7
23
Digital Outputs
1
2
3
4
5
24 NO8 SL7 5 6 7 8
COM
COM
COM
COM
NO5
NO6
NO7
NO8
NC5
NC6
NC7
NC8
13 14 15 16 17 18 19 20 21 22 23 24
TB-07 13 24 TB-07
5/26/2022
5/26/2022
5/26/2022
TB-PA X7H
TB-07 15 22 TB-07
TB-07 16 21 TB-07
TB-07 18 19 TB-07
Date:
Date:
Date:
Designed by:
Software by:
Checked by:
Contractor:
Engineer:
Architect:
7
602 AHU Panel.vsd 5/27/2022
5/27/2022
Last Printed
Last Saved
Job Number
Sheet Number
File Name
602-7
Panel Continued on Next Page
Label wiring, cabling, and conduit with point name at each end within 5 cm (2 in.)
1
of termination.
Low Voltage Notes
44.00 x 1.00
37.06 x 1.00
12.25 x 1.50
DUCT2
DUCT1
DUCT1
7 5/8"
TB-07
11.50 x 1.25 PANEL LABEL
Date:
SL1 SL2 SL3
Preliminary
12.25 x 1.50
DUCT2
TB-03
7 5/8"
11.50 x 1.25
# Change:
Revision:
1
2
3
4
5
SL4 SL5 SL6
12.25 x 1.50
DUCT2
5/26/2022
5/26/2022
5/26/2022
TB-04
47.2in.
F-0
11.50 x 1.25
7 5/8"
Date:
Date:
Date:
SL7
12.79 x 1.50
Designed by:
Software by:
Checked by:
Contractor:
Engineer:
Architect:
DUCT2
6.79 x 1.25
8 1/8"
DUCT2
PB1
Main
R1 LR1
Part Number Qty Description Manufacturer
----------------------------------------------------------------------------------------------------------------------------------------------------
37.05 x 1.50
5/27/2022
NSYTRV42SF5 1 TERMINAL BLOCK GREY Square D
Last Printed
Last Saved
5.95in. PAS01 1 PRESS DRY SWITCH .08-1.2"WC Veris Industries
RY2KS-UC-AC24 1 Latching Relay IDEC
SXWAO8HXX10001 1 AO-8-H 8 ANALOG OUT V/mA HAND Schneider Electric
SXWASPXXX10001 1 SMARTX CONTROLLER AS-P Schneider Electric
44.00 x 1.50
Job Number
SXWPS24VX10001 1 PS-24V POWER SUPPLY 24VAC/VDC Schneider Electric
29.30 x 1.00
SXWSCABLE10003 2 S-CABLE 0.75M ANGLE Schneider Electric
SXWTBASW110002 1 TB-ASP-W1 TERM BASE ASP W1 Schneider Electric
DUCT1
Sheet Number
SXWTBIOW110001 5 TB-IO-W1 TERM BASE I/O W1 Schneider Electric
File Name
SXWTBPSW110001 1 TB-PS-W1 TERM BASE PWR SUP W1 Schneider Electric
602-8
SXWUI16XX10001 2 UI-16 16 UNIVERSAL IN Schneider Electric
SXWUI8A4H10001 1 UI-8/AO-4-H UI/AO V/mA HAND Schneider Electric
SY4S-05 1 Latching Relay Base IDEC
31.5in.
Electric. Their use or reproduction without prior consent of
COLO 1 Panel Power Detail
Date:
Preliminary
TB-PA
X1H CB8
24VAC
X3H X1H
Wired from 24VAC
X3H
XFR1 Wired to
X3H
End Devices
X2N X4N X2N
X4N
X4N
G
TB-PA
X3H CB9
# Change:
24VAC
Revision:
X5H X3H
Wired from 24VAC
X5H
XFR2 Wired to
X5H
End Devices
X4N X6N X4N
1
2
3
4
5
X6N
X6N
G
TB-PA
X5H CB10
24VAC
X7H X5H
Wired from 24VAC
X7H
5/26/2022
5/26/2022
5/26/2022
XFR3 Wired to
X7H
End Devices
X6N X8N X6N
X8N
X8N
G
TB-PA
Date:
Date:
Date:
Y1+ CB11
24VDC
Y1+ Y1+
Wired from 24VDC
Y1+
PS1 Wired to
Y2-
End Devices
Y2- Y2- Y2-
G
Designed by:
Software by:
Checked by:
Contractor:
Engineer:
Architect:
Panel Continued on Next Page
5/27/2022
5/27/2022
Last Printed
Last Saved
Panel:_____________________
CKT#:_____________________
MAX VOLTAGE: 24v
Job Number
Sheet Number
File Name
CB8 (24VAC) = 4.00A
603-1
CB9 (24VAC) = 4.00A
CB10 (24VAC) = 4.00A
CB11 (24VDC) = 4.00A
See Network Architecture
See Network Architecture
Room#
Room#
Switch ##
Switch ##
Port#
Port#
TB-C
E2
E1
ETH2
ETH1
AS-P
TAHUYA
TB-PA
TB-PA
TB-PA
TB-PA
Y2-
X1H
X2N
Y1+
L/+
2
L/-
4
GND
F-0
1A Fuse
SXW PS-24V
SL1
Schneider Electric
COLO 1 Panel IO Detail - 1 & 2
TX/RX+
Host
2
TX/RX-
Device
Com A
3
RET
4
BIAS+
5
RS-485
TX/RX+
6
TX/RX-
Com B
7
RET
1 2 3 4 5 6 7 8
TX/RX+
TX/RX-
10/100
SXW AS-P
RS-485
Ethernet 1
9 10
RET
LON
SL2
LON-1
Schneider Electric
11 12
LON-2
TP/FT
10/100
Ethernet 2
TAHUYA Adapter
TAHUYA
Job Number
National And Strategic Accounts Architect:
Revision: Preliminary
Engineer:
# Change: Date:
File Name Last Saved Contractor:
1
603 COLO 1 Panel.vsd 5/27/2022 Designed by: Date: 5/26/2022 2
3 These drawings and designs are the property of Schneider
Sheet Number Last Printed Software by: Date: 5/26/2022 Electric. Their use or reproduction without prior consent of
COLO 1 Panel IO Detail - 1 & 4
the company is strictly forbidden.
Checked by: Date: 5/26/2022 5
603-2 5/27/2022 2
Electric. Their use or reproduction without prior consent of
COLO 1 Panel IO Detail - 3
TB-03
1
Top Bottom
mA RTN 1 UI1 SL3
PT01.SRP SERVER RACK DP 01 TB##
PWR 2 RET SL3
1AC X3H TB-PA TB-03 7 9 TB-03
1DC Y1+ TB-PA
Date:
mA RTN 3 UI2 SL3
PT02.SRP SERVER RACK DP 02
PWR 4 X4N TB-PA TB-03 5 11 TB-03
2AC TB-03 3 13 TB-03
Preliminary
2DC TB-03 2
S1
S1 TB-03 1 15 TB-03
mA RTN 5 UI3 SL3
PT03.SRP SERVER RACK DP 03
PWR 6 Y2- TB-PA
1 2 3 4 5 6 7 8 9 10 11 12
3AC
RET
RET
RET
RET
UI1
UI2
UI3
UI4
UI5
UI6
UI7
UI8
3DC
mA RTN 7 UI4 SL3
PT06.HAP HOT AISLE TO OUTSIDE DP 01
PWR 8
4AC 1 2 3 4 5 6 7 8
Universal Inputs
4DC
# Change:
+ 10
Revision:
5AC SXW UI-16
5DC
SL3
- 11 UI6 SL3
TT02.CAT COLD AISLE TEMP 02 Universal Inputs
1
2
3
4
5
+ 12 9 10 11 12 13 14 15 16
6AC
6DC
UI10
UI11
UI12
UI13
UI14
UI15
UI16
RET
RET
RET
RET
UI9
S2
S2
13 14 15 16 17 18 19 20 21 22 23 24
- 13 UI7 SL3
TT03.CAT COLD AISLE TEMP 03
+ 14
7AC TB-03 17 31 TB-03
5/26/2022
5/26/2022
5/26/2022
7DC
- 15 UI8 SL3 TB-03 18
TT07.HAT HOT AISLE TEMP 01
+ 16 TB-03 19 29 TB-03
8AC TB-03 21 27 TB-03
8DC
- 17 UI9 SL3
TT08.HAT HOT AISLE TEMP 02
+ 18 RET SL3 TB-03 23 25 TB-03
Date:
Date:
Date:
9AC
9DC
- 19 UI10 SL3
TT09.HAT HOT AISLE TEMP 03
+ 20
10AC
10DC
S3
Designed by:
S3
Software by:
Checked by:
Contractor:
mA 21 UI11 SL3
Engineer:
Architect:
NT01.CAH COLD AISLE RH 01
VIN 22
11AC
11DC
mA 23 UI12 SL3
NT02.CAH COLD AISLE RH 02
VIN 24
5/27/2022
5/27/2022
16DC
Last Printed
Last Saved
Job Number
603-3
Panel Continued on Next Page
Label wiring, cabling, and conduit with point name at each end within 5 cm (2 in.)
1
of termination.
Electric. Their use or reproduction without prior consent of
COLO 1 Panel IO Detail - 4
TB-04
1
Top Bottom
mA RTN 1 UI1 SL4
PT04.SRP SERVER RACK DP 04 TB##
PWR 2 RET SL4
1AC X3H TB-PA TB-04 7 9 TB-04
1DC Y1+ TB-PA
Date:
mA RTN 3 UI2 SL4
PT05.SRP SERVER RACK DP 05
PWR 4 X4N TB-PA TB-04 5 11 TB-04
2AC TB-04 3 13 TB-04
Preliminary
2DC TB-04 2
S1
S1 TB-04 1 15 TB-04
mA RTN 5 UI3 SL4
PT07.HAP HOT AISLE TO OUTSIDE DP 02
PWR 6 Y2- TB-PA
1 2 3 4 5 6 7 8 9 10 11 12
3AC
RET
RET
RET
RET
UI1
UI2
UI3
UI4
UI5
UI6
UI7
UI8
3DC
- 7 UI4 SL4
TT04.CAT COLD AISLE TEMP 04
+ 8
4AC 1 2 3 4 5 6 7 8
Universal Inputs
4DC
# Change:
+ 10
Revision:
5AC SXW UI-16
5DC
SL4
- 11 UI6 SL4
TT06.CAT COLD AISLE TEMP 06 Universal Inputs
1
2
3
4
5
+ 12 9 10 11 12 13 14 15 16
6AC
6DC
UI10
UI11
UI12
UI13
UI14
UI15
UI16
RET
RET
RET
RET
UI9
S2
S2
13 14 15 16 17 18 19 20 21 22 23 24
- 13 UI7 SL4
TT10.HAT HOT AISLE TEMP 04
+ 14
7AC TB-04 17 31 TB-04
5/26/2022
5/26/2022
5/26/2022
7DC
- 15 UI8 SL4 TB-04 18
TT11.HAT HOT AISLE TEMP 05
+ 16 TB-04 19 29 TB-04
8AC TB-04 21 27 TB-04
8DC
mA 17 UI9 SL4
NT04.CAH COLD AISLE RH 04
VIN 18 RET SL4 TB-04 23 25 TB-04
Date:
Date:
Date:
9AC
9DC
mA 19 UI10 SL4
NT05.CAH COLD AISLE RH 05
VIN 20
10AC
10DC
S3
Designed by:
S3
Software by:
Checked by:
Contractor:
mA 21 UI11 SL4
Engineer:
Architect:
NT06.CAH COLD AISLE RH 06
VIN 22
11AC
11DC
- 23 UI12 SL4
TT13.VT ENTRY VESTIBULE TEMP
+ 24
5/27/2022
5/27/2022
16DC
Last Printed
Last Saved
Job Number
603-4
Panel Continued on Next Page
Label wiring, cabling, and conduit with point name at each end within 5 cm (2 in.)
1
of termination.
Electric. Their use or reproduction without prior consent of
COLO 1 Panel IO Detail - 5
Top
TB-05
1
Top Bottom
mA RTN 1 UI1 SL5
PT08.HAP HOT AISLE TO OUTSIDE DP 03 TB##
PWR 2 RET SL5
Date:
1AC X3H TB-PA
1DC Y1+ TB-PA
8 T- 3 UI2 SL5 21 TB-05
Preliminary
TT14.OAT OUTDOOR AIR TEMP
7 T+ 4 X4N TB-PA TB-05 19
2AC TB-05 18
2DC TB-05 17 23 TB-05
S1
S1
1 2 3 4 5 6 7 8 9 10 11 12
6 HUM- 5 UI3 SL5
NT08.OAH OUTDOOR AIR HUMIDITY
CO1
CO2
CO3
CO4
RET
RET
RET
RET
VO1
VO2
VO3
VO4
5 HUM + 6 Y2- TB-PA
3AC
3DC
Org 7 UI4 SL5 1 2 3 4
PD01.FB RELIEF DAMPER 01 FEEDBACK Analog Outputs
Blk 8
4AC
Schneider Electric
# Change:
4DC
Revision:
PD02.FB RELIEF DAMPER 02 FEEDBACK
Org 9 UI5 SL5 SXW UI-8/AO-4-H
Blk 10
SL5
5AC
Universal Inputs
1
2
3
4
5
5DC 1 2 3 4 5 6 7 8
NO 11 UI6 SL5
CC-QS01.PA PRIMARY POWER AVAILABLE
COM 12
RET
RET
RET
RET
UI1
UI2
UI3
UI4
UI5
UI6
UI7
UI8
6AC
6DC
13 14 15 16 17 18 19 20 21 22 23 24
S2
S2
NO 13 UI7 SL5 TB-05 1 15 TB-05
CC-QS02.PA SECONDARY POWER AVAILABLE
5/26/2022
5/26/2022
5/26/2022
COM 14
7AC TB-05 2
7DC TB-05 3 13 TB-05
4 15 UI8 SL5 TB-05 5 11 TB-05
PH01.ALM RETURN PRESSURE SWITCH RTN
12 16
8AC
8DC TB-05 7 9 TB-05
Date:
Date:
Date:
WHT 17 VO1 SL5
PD01.CMD RELIEF AIR DAMPER A COMMAND BLK 18 RET SL5
RED 9AC
R1 6 9DC
WHT 19 VO2 SL5
PD02.CMD RELIEF AIR DAMPER B COMMAND BLK 20
RED 10AC
R1 5
Designed by:
10DC
Software by:
Checked by:
Contractor:
S3
Engineer:
Architect:
S3
SIG 21 VO3 SL5
EH01.CMD ELECTRIC DUCT HEATER COMMAND
OV 22
11AC
11DC
5/27/2022
5/27/2022
Last Printed
Last Saved
Job Number
603-5
Panel Continued on Next Page
Label wiring, cabling, and conduit with point name at each end within 5 cm (2 in.)
1
of termination.
Electric. Their use or reproduction without prior consent of
COLO 1 Panel IO Detail - 6
TB-06
1
Top Bottom
SIG 1 UI1 SL6
NPW.CON NPW CONDUCTIVITY TB##
RET 2 RET SL6
1AC X3H TB-PA TB-06 7 9 TB-06
1DC Y1+ TB-PA
Date:
SIG 3 UI2 SL6
NPW.PH NPW PH
RET 4 X4N TB-PA TB-06 5 11 TB-06
2AC TB-06 3 13 TB-06
Preliminary
2DC TB-06 2
S1
S1 TB-06 1 15 TB-06
SIG 5 UI3 SL6
NPW.ORP NPW ORP
RET 6 Y2- TB-PA
1 2 3 4 5 6 7 8 9 10 11 12
3AC
RET
RET
RET
RET
UI1
UI2
UI3
UI4
UI5
UI6
UI7
UI8
3DC
SIG 7 UI4 SL6
NPW.FCL NPW FREE CHLORINE
RET 8
4AC 1 2 3 4 5 6 7 8
Universal Inputs
4DC
# Change:
RET 10
Revision:
5AC SXW UI-16
5DC
SL6
11 UI6 SL6
Universal Inputs
1
2
3
4
5
12 9 10 11 12 13 14 15 16
6AC
6DC
UI10
UI11
UI12
UI13
UI14
UI15
UI16
RET
RET
RET
RET
UI9
S2
S2
13 14 15 16 17 18 19 20 21 22 23 24
13 UI7 SL6
14
7AC TB-06 17 31 TB-06
5/26/2022
5/26/2022
5/26/2022
7DC
15 UI8 SL6 TB-06 18
16 TB-06 19 29 TB-06
8AC TB-06 21 27 TB-06
8DC
17 UI9 SL6
18 RET SL6 TB-06 23 25 TB-06
Date:
Date:
Date:
9AC
9DC
19 UI10 SL6
20
10AC
10DC
S3
Designed by:
S3
Software by:
Checked by:
Contractor:
21 UI11 SL6
Engineer:
Architect:
22
11AC
11DC
23 UI12 SL6
24
5/27/2022
5/27/2022
16DC
Last Printed
Last Saved
Job Number
603-6
Panel Continued on Next Page
Label wiring, cabling, and conduit with point name at each end within 5 cm (2 in.)
1
of termination.
Low Voltage
28.50 x 1.50
28.50 x 1.50
21.55 x 1.50
28.50 x 1.50
12.38 x 1.25
Date:
Preliminary
TB-05
SL1 SL2 SL3
12.55 x 1.00
DUCT1
# Change:
6.8in.
Revision:
TB-03
1
2
3
4
5
SL4 SL5 SL6
12.55 x 1.00
DUCT1
TB-06
5/26/2022
5/26/2022
5/26/2022
37.5in. 12.38 x 1.25 39.4in.
F-0
6.0in.
DUCT2
Date:
Date:
Date:
DUCT2
19.50 x 1.00
TB-04
DUCT1
DUCT2
DUCT2
Designed by:
Software by:
Checked by:
Contractor:
Engineer:
Architect:
6.0in.
DUCT1
5.50 x 1.00
5.50 x 1.00
TB-PA
DUCT1
DUCT1
5.5in.
5/27/2022
5/27/2022
NSYAEDL405S3D 1 LOCK AND KEY SET Schneider Electric
Last Printed
Last Saved
NSYTRAABV35 2 END BRACKET SCREW TYPE Square D
NSYTRAC22 1 END COVER Square D
31.5in. NSYTRV42 1 6MM TERMINAL BLOCK GRAY Square D
NSYTRV42SF5 1 TERMINAL BLOCK GREY Square D
SEBOX393210P 1 ENCL 39X32X10 NEMA 4 W/ PERF Schneider Electric
Job Number
SXWASPXXX10001 1 SMARTX CONTROLLER AS-P Schneider Electric
Sheet Number
SXWTBASW110002 1 TB-ASP-W1 TERM BASE ASP W1 Schneider Electric
File Name
SXWTBIOW110001 3 TB-IO-W1 TERM BASE I/O W1 Schneider Electric
603-7
SXWTBPSW110001 1 TB-PS-W1 TERM BASE PWR SUP W1 Schneider Electric
SXWUI16XX10001 3 UI-16 16 UNIVERSAL IN Schneider Electric
SXWUI8A4H10001 1 UI-8/AO-4-H UI/AO V/mA HAND Schneider Electric
PNL4
31.5in.
PANEL LABEL
39.4in.
COLO 1 Panel Layout - Door
Job Number
National And Strategic Accounts Architect:
Revision: Preliminary
Engineer:
# Change: Date:
File Name Last Saved Contractor:
1
603 COLO 1 Panel.vsd 5/27/2022 Designed by: Date: 5/26/2022 2
3 These drawings and designs are the property of Schneider
Sheet Number Last Printed Software by: Date: 5/26/2022 Electric. Their use or reproduction without prior consent of
4
the company is strictly forbidden.
COLO 1 Panel Layout - Door Checked by: Date: 5/26/2022 5
603-8 5/27/2022
Electric. Their use or reproduction without prior consent of
SHELL Panel Power Detail
Date:
Preliminary
TB-PA
X1H CB8
24VAC
X3H X1H
Wired from 24VAC
X3H
XFR1 Wired to
X3H
End Devices
X2N X4N X2N
X4N
X4N
G
TB-PA
X3H CB9
# Change:
24VAC
Revision:
X5H X3H
Wired from 24VAC
X5H
XFR2 Wired to
X5H
End Devices
X4N X6N X4N
1
2
3
4
5
X6N
X6N
G
TB-PA
X5H CB10
24VAC
X7H X5H
Wired from 24VAC
X7H
5/26/2022
5/26/2022
5/26/2022
XFR3 Wired to
X7H
End Devices
X6N X8N X6N
X8N
X8N
G
TB-PA
Date:
Date:
Date:
Y1+ CB11
24VDC
Y1+ Y1+
Wired from 24VDC
Y1+
PS1 Wired to
Y2-
End Devices
Y2- Y2- Y2-
G
Designed by:
Software by:
Checked by:
Contractor:
Engineer:
Architect:
Panel Continued on Next Page
5/27/2022
Last Printed
Last Saved
Panel:_____________________
CKT#:_____________________
MAX VOLTAGE: 24v
Job Number
SSCR = 10kA
TOTAL FLA : 9.40A
Sheet Number
CB8 (24VAC) = 4.00A
File Name
605-1
CB9 (24VAC) = 4.00A
CB10 (24VAC) = 4.00A
CB11 (24VDC) = 4.00A
See Network Architecture
See Network Architecture
Room#
Room#
Switch ##
Switch ##
Port#
Port#
TB-C
E2
E1
ETH2
ETH1
AS-P
TAHUYA
TB-PA
TB-PA
TB-PA
TB-PA
Y2-
X1H
X2N
Y1+
L/+
2
L/-
4
GND
F-0
1A Fuse
SXW PS-24V
SL1
Schneider Electric
SHELL Panel IO Detail - 1 & 2
TX/RX+
Host
2
TX/RX-
Device
Com A
3
RET
4
BIAS+
5
RS-485
TX/RX+
6
TX/RX-
Com B
7
RET
1 2 3 4 5 6 7 8
TX/RX+
TX/RX-
10/100
SXW AS-P
RS-485
Ethernet 1
9 10
RET
LON
SL2
LON-1
Schneider Electric
11 12
LON-2
TP/FT
10/100
Ethernet 2
TAHUYA Adapter
TAHUYA
Job Number
National And Strategic Accounts Architect:
Revision: Preliminary
Engineer:
# Change: Date:
File Name Last Saved Contractor:
1
605 SHELL Panel.vsd 5/27/2022 Designed by: Date: 5/26/2022 2
3 These drawings and designs are the property of Schneider
Sheet Number Last Printed Software by: Date: 5/26/2022 Electric. Their use or reproduction without prior consent of
SHELL Panel IO Detail - 1 & 4
the company is strictly forbidden.
Checked by: Date: 5/26/2022 5
605-2 5/27/2022 2
Electric. Their use or reproduction without prior consent of
SHELL Panel IO Detail - 3
TB-03
1
Top Bottom
- 1 UI1 SL3
COLO2-TT01.ST COLO2 SHELL TEMP (REMOVED PHASE 2) TB##
+ 2 RET SL3
1AC X3H TB-PA TB-03 7 9 TB-03
1DC Y1+ TB-PA
Date:
- 3 UI2 SL3
COLO3-TT01.ST COLO3 SHELL TEMP (REMOVED PHASE 3)
+ 4 X4N TB-PA TB-03 5 11 TB-03
2AC TB-03 3 13 TB-03
Preliminary
2DC TB-03 2
S1
S1 TB-03 1 15 TB-03
- 5 UI3 SL3
COLO4-TT01.ST COLO4 SHELL TEMP (REMOVED PHASE 4)
+ 6 Y2- TB-PA
1 2 3 4 5 6 7 8 9 10 11 12
3AC
RET
RET
RET
RET
UI1
UI2
UI3
UI4
UI5
UI6
UI7
UI8
3DC
- 7 UI4 SL3
COLO5-TT01.ST COLO5 SHELL TEMP (REMOVED PHASE 5)
+ 8
4AC 1 2 3 4 5 6 7 8
Universal Inputs
4DC
# Change:
+ 10
Revision:
5AC SXW UI-16
5DC
SL3
23 11 UI6 SL3
COLO5-CE1-FT01.NPW NPW FLOW (REMOVED PHASE 5) Universal Inputs
1
2
3
4
5
24 12 9 10 11 12 13 14 15 16
6AC
6DC
UI10
UI11
UI12
UI13
UI14
UI15
UI16
RET
RET
RET
RET
UI9
S2
S2
13 14 15 16 17 18 19 20 21 22 23 24
17 13 UI7 SL3
COLO5-CE1-FQ01.NPW NPW FLOW TOTAL (REMOVED PHASE 5)
18 14
7AC TB-03 17 31 TB-03
5/26/2022
5/26/2022
5/26/2022
7DC
15 UI8 SL3 TB-03 18
16 TB-03 19 29 TB-03
8AC TB-03 21 27 TB-03
8DC
23 17 UI9 SL3
COLO5-CE4-FT01.NPW NPW FLOW (REMOVED PHASE 5)
24 18 RET SL3 TB-03 23 25 TB-03
Date:
Date:
Date:
9AC
9DC
17 19 UI10 SL3
COLO5-CE4-FQ01.NPW NPW FLOW TOTAL (REMOVED PHASE 5)
18 20
10AC
10DC
S3
Designed by:
S3
Software by:
Checked by:
Contractor:
21 UI11 SL3
Engineer:
Architect:
22
11AC
11DC
- 23 UI12 SL3
COLO5-CE4-TT15.FRT COLO5 FIRE RISER ROOM TEMP (REMOVED PHASE 5)
+ 24
5/27/2022
16DC
Last Printed
Last Saved
Job Number
Sheet Number
File Name
605-3
Panel Continued on Next Page
Label wiring, cabling, and conduit with point name at each end within 5 cm (2 in.)
1
of termination.
Electric. Their use or reproduction without prior consent of
SHELL Panel IO Detail - 4
TB-04
Top Bottom
1 UI1 SL4
TB##
2 RET SL4
1AC X3H TB-PA TB-04 7 9 TB-04
1DC Y1+ TB-PA
Date:
3 UI2 SL4
4 X4N TB-PA TB-04 5 11 TB-04
2AC TB-04 3 13 TB-04
Preliminary
2DC TB-04 2
S1
S1 TB-04 1 15 TB-04
5 UI3 SL4
6 Y2- TB-PA
1 2 3 4 5 6 7 8 9 10 11 12
3AC
RET
RET
RET
RET
UI1
UI2
UI3
UI4
UI5
UI6
UI7
UI8
3DC
7 UI4 SL4
8
4AC 1 2 3 4 5 6 7 8
Universal Inputs
4DC
9 UI5 SL4
Schneider Electric
# Change:
10
Revision:
5AC SXW UI-16
5DC
SL4
11 UI6 SL4
Universal Inputs
1
2
3
4
5
12 9 10 11 12 13 14 15 16
6AC
6DC
UI10
UI11
UI12
UI13
UI14
UI15
UI16
RET
RET
RET
RET
UI9
S2
S2
13 14 15 16 17 18 19 20 21 22 23 24
13 UI7 SL4
14
7AC TB-04 17 31 TB-04
5/26/2022
5/26/2022
5/26/2022
7DC
15 UI8 SL4 TB-04 18
16 TB-04 19 29 TB-04
8AC TB-04 21 27 TB-04
8DC
17 UI9 SL4
18 RET SL4 TB-04 23 25 TB-04
Date:
Date:
Date:
9AC
9DC
19 UI10 SL4
20
10AC
10DC
S3
Designed by:
S3
Software by:
Checked by:
Contractor:
21 UI11 SL4
Engineer:
Architect:
22
11AC
11DC
23 UI12 SL4
24
5/27/2022
16DC
Last Printed
Last Saved
Job Number
Sheet Number
File Name
605-4
Panel Continued on Next Page
Label wiring, cabling, and conduit with point name at each end within 5 cm (2 in.)
1
of termination.
Electric. Their use or reproduction without prior consent of
SHELL Panel IO Detail - 5
TB-05
Top Bottom
1 UI1 SL5
TB##
2 RET SL5
1AC X3H TB-PA TB-05 7 9 TB-05
1DC Y1+ TB-PA
Date:
3 UI2 SL5
4 X4N TB-PA TB-05 5 11 TB-05
2AC TB-05 3 13 TB-05
Preliminary
2DC TB-05 2
S1
S1 TB-05 1 15 TB-05
5 UI3 SL5
6 Y2- TB-PA
1 2 3 4 5 6 7 8 9 10 11 12
3AC
RET
RET
RET
RET
UI1
UI2
UI3
UI4
UI5
UI6
UI7
UI8
3DC
7 UI4 SL5
8
4AC 1 2 3 4 5 6 7 8
Universal Inputs
4DC
9 UI5 SL5
Schneider Electric
# Change:
10
Revision:
5AC SXW UI-16
5DC
SL5
11 UI6 SL5
Universal Inputs
1
2
3
4
5
12 9 10 11 12 13 14 15 16
6AC
6DC
UI10
UI11
UI12
UI13
UI14
UI15
UI16
RET
RET
RET
RET
UI9
S2
S2
13 14 15 16 17 18 19 20 21 22 23 24
13 UI7 SL5
14
7AC TB-05 17 31 TB-05
5/26/2022
5/26/2022
5/26/2022
7DC
15 UI8 SL5 TB-05 18
16 TB-05 19 29 TB-05
8AC TB-05 21 27 TB-05
8DC
17 UI9 SL5
18 RET SL5 TB-05 23 25 TB-05
Date:
Date:
Date:
9AC
9DC
19 UI10 SL5
20
10AC
10DC
S3
Designed by:
S3
Software by:
Checked by:
Contractor:
21 UI11 SL5
Engineer:
Architect:
22
11AC
11DC
23 UI12 SL5
24
5/27/2022
16DC
Last Printed
Last Saved
Job Number
Sheet Number
File Name
605-5
Panel Continued on Next Page
Label wiring, cabling, and conduit with point name at each end within 5 cm (2 in.)
1
of termination.
Electric. Their use or reproduction without prior consent of
SHELL Panel IO Detail - 6
TB-06
Top Bottom
1 UI1 SL6
TB##
2 RET SL6
1AC X3H TB-PA TB-06 7 9 TB-06
1DC Y1+ TB-PA
Date:
3 UI2 SL6
4 X4N TB-PA TB-06 5 11 TB-06
2AC TB-06 3 13 TB-06
Preliminary
2DC TB-06 2
S1
S1 TB-06 1 15 TB-06
5 UI3 SL6
6 Y2- TB-PA
1 2 3 4 5 6 7 8 9 10 11 12
3AC
RET
RET
RET
RET
UI1
UI2
UI3
UI4
UI5
UI6
UI7
UI8
3DC
7 UI4 SL6
8
4AC 1 2 3 4 5 6 7 8
Universal Inputs
4DC
9 UI5 SL6
Schneider Electric
# Change:
10
Revision:
5AC SXW UI-16
5DC
SL6
11 UI6 SL6
Universal Inputs
1
2
3
4
5
12 9 10 11 12 13 14 15 16
6AC
6DC
UI10
UI11
UI12
UI13
UI14
UI15
UI16
RET
RET
RET
RET
UI9
S2
S2
13 14 15 16 17 18 19 20 21 22 23 24
13 UI7 SL6
14
7AC TB-06 17 31 TB-06
5/26/2022
5/26/2022
5/26/2022
7DC
15 UI8 SL6 TB-06 18
16 TB-06 19 29 TB-06
8AC TB-06 21 27 TB-06
8DC
17 UI9 SL6
18 RET SL6 TB-06 23 25 TB-06
Date:
Date:
Date:
9AC
9DC
19 UI10 SL6
20
10AC
10DC
S3
Designed by:
S3
Software by:
Checked by:
Contractor:
21 UI11 SL6
Engineer:
Architect:
22
11AC
11DC
23 UI12 SL6
24
5/27/2022
16DC
Last Printed
Last Saved
Job Number
Sheet Number
File Name
605-6
Panel Continued on Next Page
Label wiring, cabling, and conduit with point name at each end within 5 cm (2 in.)
1
of termination.
Electric. Their use or reproduction without prior consent of
SHELL Panel IO Detail - 7
TB-07
Top Bottom
1 UI1 SL7
TB##
2 RET SL7
1AC X3H TB-PA TB-07 7 9 TB-07
1DC Y1+ TB-PA
Date:
3 UI2 SL7
4 X4N TB-PA TB-07 5 11 TB-07
2AC TB-07 3 13 TB-07
Preliminary
2DC TB-07 2
S1
S1 TB-07 1 15 TB-07
5 UI3 SL7
6 Y2- TB-PA
1 2 3 4 5 6 7 8 9 10 11 12
3AC
RET
RET
RET
RET
UI1
UI2
UI3
UI4
UI5
UI6
UI7
UI8
3DC
7 UI4 SL7
8
4AC 1 2 3 4 5 6 7 8
Universal Inputs
4DC
9 UI5 SL7
Schneider Electric
# Change:
10
Revision:
5AC SXW UI-16
5DC
SL7
11 UI6 SL7
Universal Inputs
1
2
3
4
5
12 9 10 11 12 13 14 15 16
6AC
6DC
UI10
UI11
UI12
UI13
UI14
UI15
UI16
RET
RET
RET
RET
UI9
S2
S2
13 14 15 16 17 18 19 20 21 22 23 24
13 UI7 SL7
14
7AC TB-07 17 31 TB-07
5/26/2022
5/26/2022
5/26/2022
7DC
15 UI8 SL7 TB-07 18
16 TB-07 19 29 TB-07
8AC TB-07 21 27 TB-07
8DC
17 UI9 SL7
18 RET SL7 TB-07 23 25 TB-07
Date:
Date:
Date:
9AC
9DC
19 UI10 SL7
20
10AC
10DC
S3
Designed by:
S3
Software by:
Checked by:
Contractor:
21 UI11 SL7
Engineer:
Architect:
22
11AC
11DC
23 UI12 SL7
24
5/27/2022
16DC
Last Printed
Last Saved
Job Number
Sheet Number
File Name
605-7
Panel Continued on Next Page
Label wiring, cabling, and conduit with point name at each end within 5 cm (2 in.)
1
of termination.
Electric. Their use or reproduction without prior consent of
SHELL Panel IO Detail - 8
TB-08
Top Bottom
1 VO1 SL8
2 RET SL8
1AC X3H TB-PA
1DC Y1+ TB-PA
Date:
3 VO2 SL8
4 X4N TB-PA
2AC 5 TB-08
Preliminary
2DC TB-08 3
S1 TB-08 2 7 TB-08
S1 TB-08 1
5 VO3 SL8
6 Y2- TB-PA
1 2 3 4 5 6 7 8 9 10 11 12
3AC
CO1
CO2
CO3
CO4
RET
RET
RET
RET
VO1
VO2
VO3
VO4
3DC
7 VO4 SL8
8
4AC 1 2 3 4
Analog Outputs
4DC
9 VO5 SL8
Schneider Electric
# Change:
10 RET SL8
Revision:
5AC SXW AO-8-H
5DC SL8
11 VO6 SL8
Analog Outputs
1
2
3
4
5
12 5 6 7 8
6AC
6DC
CO5
CO6
CO7
CO8
RET
RET
RET
RET
VO5
VO6
VO7
VO8
S2
S2
13 14 15 16 17 18 19 20 21 22 23 24
13 VO7 SL8
14
7AC TB-08 10 15 TB-08
5/26/2022
5/26/2022
5/26/2022
7DC TB-08 9
15 VO8 SL8 13 TB-08
16 TB-08 11
8AC
8DC
Date:
Date:
Date:
Designed by:
Software by:
Checked by:
Contractor:
Engineer:
Architect:
National And Strategic Accounts
5/27/2022
Last Printed
Last Saved
Job Number
Sheet Number
File Name
605-8
Panel Continued on Next Page
Label wiring, cabling, and conduit with point name at each end within 5 cm (2 in.)
1
of termination.
Low Voltage
44.00 x 1.00
37.05 x 1.00
12.25 x 2.00
DUCT2
DUCT1
DUCT1
7 5/8"
TB-06
11.50 x 1.25
Date:
Preliminary
SL1 SL2 SL3
12.25 x 1.75
DUCT2
TB-03
7 5/8"
# Change:
Revision:
11.50 x 1.25
TB-07
1
2
3
4
5
SL4 SL5 SL6
12.25 x 1.75
DUCT2
5/26/2022
5/26/2022
5/26/2022
47.2in.
TB-04
TB-08
Date:
Date:
Date:
11.50 x 1.25
7 5/8"
SL7 SL8
Designed by:
Software by:
Checked by:
Contractor:
Engineer:
Architect:
12.25 x 1.75
DUCT2
DUCT2
6 7/8"
37.05 x 1.50
20.76 x 1.00
Part Number Qty Description Manufacturer
----------------------------------------------------------------------------------------------------------------------------------------------------
DUCT1 AI-PW62 1 TAHUYA Power Adapter AI Link
5.95 x 1.00
DUCT1
5/27/2022
NSYAEDL405S3D 1 LOCK AND KEY SET Schneider Electric
Last Printed
Last Saved
5.95in. NSYTRAABV35 2 END BRACKET SCREW TYPE Square D
NSYTRAC22 1 END COVER Square D
NSYTRV42 1 6MM TERMINAL BLOCK GRAY Square D
NSYTRV42SF5 1 TERMINAL BLOCK GREY Square D
44.00 x 1.50
Job Number
SXWAO8HXX10001 1 AO-8-H 8 ANALOG OUT V/MA HAND Schneider Electric
29.30 x 1.00
SXWASPXXX10001 1 SMARTX CONTROLLER AS-P Schneider Electric
SXWPS24VX10001 1 PS-24V POWER SUPPLY 24 VAC/VDC Schneider Electric
DUCT1
Sheet Number
SXWSCABLE10003 2 S-CABLE 0.75M ANGLE Schneider Electric
File Name
SXWTBASW110002 1 TB-ASP-W1 TERM BASE ASP W1 Schneider Electric
605-9
SXWTBIOW110001 6 TB-IO-W1 TERM BASE I/O W1 Schneider Electric
SXWTBPSW110001 1 TB-PS-W1 Term Base Pwr Sup W1 Schneider Electric
31.5in. SXWUI16XX10001 5 UI-16 16 UNIVERSAL IN Schneider Electric
PNL-5
31.5in.
PANEL LABEL
47.2in.
SHELL Panel Layout - Door
Job Number
National And Strategic Accounts Architect:
Revision: Preliminary
Engineer:
# Change: Date:
File Name Last Saved Contractor:
1
605 SHELL Panel.vsd 5/27/2022 Designed by: Date: 5/26/2022 2
3 These drawings and designs are the property of Schneider
Sheet Number Last Printed Software by: Date: 5/26/2022 Electric. Their use or reproduction without prior consent of
4
the company is strictly forbidden.
SHELL Panel Layout - Door Checked by: Date: 5/26/2022 5
605-10 5/27/2022
Electric. Their use or reproduction without prior consent of
ADMIN/AHU Panel Power Detail
Date:
CB3N
PRI SEC
PR1 CB4N
A1
A2
BLK
Preliminary
CB5N
Wire to TB-PA
CB6N X3H
BLU Of
18 15 L CB7N X4N
WHT BRN PNL##
16 G XFR2
G PRI SEC
28 25 N G BLK
26 G Wire to TB-PA
X5H
G BLU Of
X6N
WHT BRN PNL##
XFR3
PRI SEC
BLK
Wire to TB-PA
X7H
# Change:
Secondary 120VAC Circuit L CB0 BLU Of
Revision:
X8N
Panel:_______________ N CB0N 13 PR3 14 WHT BRN PNL##
XFR4
G G
CKT#:_______________ QS02.PA UI# TB#:## 5 9
SL# RET TB#:## PR3-1
1
2
3
4
5
Wire to TB-PA
~ + Y1+
Of
~ - Y2-
PNL##
PS1
5/26/2022
5/26/2022
5/26/2022
Date:
Date:
Date:
Designed by:
Software by:
Checked by:
Contractor:
Engineer:
Architect:
National And Strategic Accounts
Detail
AS-P 10.00 VA 1 0 0 0 0 AS-P 10.00 VA 1 0 0 0 0
UI-16 1.80 VA 1 0 0 0 0 UI-16 1.80 VA 2 0 0 0 0
UI-8/DO-FC-4 1.90 VA 1 0 0 0 0 UI-8/AO-4 3.20 VA 1 0 0 0 0 UL Panel Details
Digital Output Contacts 0.75 VA 0 1 0 0 0 AO-8 4.90 VA 1 0 0 0 0
Tahuya Adapter 0.02 W 0 0 0 0 1 DO-FC-8 2.20 VA 1 0 0 0 0 Panel:_____________________
A/TTM1K-R2-4 RmTemp 0.75 W 0 0 0 0 4 Digital Output Contacts 0.75 VA 0 0 0 7 0 CKT#:_____________________
CWE CO2 0.75 W 0 0 0 0 3 Tahuya Adapter 0.02 VA 0 0 0 0 1
SD-R01 Leak 2.40 VA 0 0 0 1 0
MAX VOLTAGE: 120vac 60 Hz
FT-3200 Flow 12.00 VA 0 2 0 0 0
SSCR = 10kA
5/27/2022
5/27/2022
Last Printed
AFB24-SR Rlf Damper 5.50 VA 0 3 0 0 0
Last Saved
HD Strobe & Horn 9.36 VA 0 1 0 0 0
TBD Face Damper 5.50 VA 0 0 3 0 0
TOTAL FLA : 9.40A
KEL-GDD-HS HD Detector 8.40 VA 0 1 0 0 0 CB0 (main) = 10.00A
Load (W) 13.70 42.51 0.00 0.00 5.27 TBD Bypass Damper 5.50 VA 0 0 2 0 0
AMB24-SR RA Damper 2.50 VA 0 0 3 0 0
CB1 (main) = 10.00A
Leftover (W) 86.30 57.49 100.00 100.00 84.74 CB2 (receptacle) = 5.00A
Job Number
Sheet Number
Supply Air Duct Rh Sensor 2.30 W
File Name
0 0 0 0 2
606-1
CB5 (XFR3) = 1.00A
Load (W) 23.90 16.50 57.50 7.65 6.92
Leftover (W) 76.10 83.50 42.50 92.35 83.09
CB6 (XFR4) = 1.00A
%used (<80%) 23.90% 16.50% 57.50% 7.65% 7.68%
CB7 (PS1) = 2.00A
Low Voltage Line Voltage
DUCT1
PANEL LABEL
15.32 x 1.00
15.32 x 1.00
100VA 100VA 100VA 100VA
7.3in.
DUCT1
XFR4 XFR3 XFR2 XFR1
# Change:
PR2 PR3
Revision:
PR1
DUCT1
1
2
3
4
5
15.45 x 1.00
19.70in.
DUCT1
TB-PB
90W
CB0
5/26/2022
5/26/2022
5/26/2022
7.0in.
PS1
Date:
Date:
Date:
17.45 x 1.00
DUCT1
EPWR1
Designed by:
Software by:
Checked by:
19.70in.
Contractor:
Engineer:
Architect:
National And Strategic Accounts
5/27/2022
Last Printed
Last Saved
Part Number Qty Description Manufacturer
----------------------------------------------------------------------------------------------------------------------------------------------------
KEL-RET4-LOCK 1 LOCK AND KEY SET Schneider Electric
Job Number
KEL-T1-1030G 5 1INX3INX6.5FT GRAY DUCT W/COVE Iboco
Sheet Number
M9F43105 1 5A 120V Din Rail Breaker D Cur Schneider Electric
File Name
M9F43110 2 10A 120V Din Rail Breaker D Cu Schneider Electric
606-2
PS24-S90W 1 POWER SUPPLY 24VDC 90W Veris Industries
SEBOX202010P 1 ENCL 20X20X10 NEMA 4 W/ PERF Schneider Electric
X100CAB 4 TRANSFRMR CTRL 120V/24V 99 VA Veris Industries
Electric. Their use or reproduction without prior consent of
COLO Panel Power Detail
Date:
PR1 CB#N
A1
A2
BLK
CB#N
Wire to TB-PA
Preliminary
CB#N X3H
BLU Of
18 15 L CB#N X4N
WHT BRN PNL##
16 G XFR2
G PRI SEC
28 25 N G BLK
26 G Wire to TB-PA
X5H
G BLU Of
X6N
WHT BRN PNL##
XFR3
Wire to TB-PA
~ + Y1+
Of
~ - Y2-
PNL##
Secondary 120VAC Circuit PS1
L CB0
# Change:
Panel:_______________ N CB0N 13 PR3 14
Revision:
G G
CKT#:_______________ SecPwrSts UI2 TB5:15 5 9
PR3-1 Wire to CB13
MOD:05 RET TB5:16
Of
1
2
3
4
5
OA Pressure Power Panel
5/26/2022
5/26/2022
5/26/2022
4A Fuse
Date:
Date:
Date:
Primary 120VAC Circuit L CB13 ~ + F-0 Y3+
Wire to PT06-OA
Panel:_______________ N CB13N ~ - Y4-
G G PS2
CKT#:_______________
Designed by:
Software by:
Checked by:
Contractor:
Engineer:
Architect:
National And Strategic Accounts
5/27/2022
5/27/2022
Last Printed
Last Saved
FT-3200 Flow 12.00 VA 0 0 1 0 0 TOTAL FLA : 9.40A
HMS110 OA T/Rh 1.50 W 0 0 0 1 0 CB0 (main) = 10.00A
AFB24-SR Rlf Damper 5.50 VA 0 12 0 0 0 CB1 (main) = 10.00A
CB2 (receptacle) = 5.00A
Job Number
SPH20 OA Pressure 70.00 W 0 0 0 0 1
Sheet Number
Leftover (W) 76.10 34.00 84.80 50.99 20.00
File Name
607-1
%used (<80%) 23.90% 66.00% 15.20% 43.35% 77.78% CB5 (XFR3) = 1.00A
CB6 (PS1) = 2.00A
CB7 (PS2) = 2.00A
Low Voltage Line Voltage
DUCT1
15.32 x 1.00
15.32 x 1.00
PANEL LABEL
DUCT1
XFR3 XFR2 XFR1
# Change:
PR2 PR3
Revision:
PR1
DUCT1
1
2
3
4
5
15.45 x 1.00
19.70in.
DUCT1
TB-PB
90W
5/26/2022
5/26/2022
5/26/2022
CB0
7.0in.
PS1
Date:
Date:
Date:
17.45 x 1.00
DUCT1
EPWR1
Designed by:
Software by:
Checked by:
Contractor:
19.70in.
Engineer:
Architect:
National And Strategic Accounts
5/27/2022
Part Number Qty Description Manufacturer
Last Printed
Last Saved
----------------------------------------------------------------------------------------------------------------------------------------------------
FKIT-VMD1B-F120A 2 RELAY & SOCKET KIT SPDT W/F SO Veris Industries
KEL-RET4-LOCK 1 LOCK AND KEY SET Schneider Electric
KEL-T1-1030G 5 1INX3INX6.5FT GRAY DUCT W/COVE Iboco
M9F43101 3 1A 120V Din Rail Breaker D Cur Schneider Electric
Job Number
M9F43102 2 2A 120V Din Rail Breaker D Cur Schneider Electric
Sheet Number
PS24-S90W 1 POWER SUPPLY 24VDC 90W Veris Industries
File Name
SEBOX202010 1 ENCL 20X20X10 NEMA 4 Schneider Electric
607-2
SEBOX202010P 1 ENCL 20X20X10 NEMA 4 W/ PERF Schneider Electric
VTD2P-UNI 1 TIME DELAY RELAY DPDT 15A DIN Veris Industries
X100CAB 3 TRANSFRMR CTRL 120V/24V 99 VA Veris Industries
Electric. Their use or reproduction without prior consent of
COLO Remote Power Panel Layout
DUCT1
PANEL LABEL
# Change:
90W
Revision:
DUCT1
DUCT1
CB13
F-0
11.80in.
1
2
3
4
5
PS2
8.40 x 1.00
8.40 x 1.00
15.62 x 1.00
DUCT1
5/26/2022
5/26/2022
5/26/2022
SEBOX121806P
17.70in.
Date:
Date:
Date:
Designed by:
Software by:
Checked by:
Contractor:
Engineer:
Architect:
National And Strategic Accounts
5/27/2022
Last Printed
Last Saved
Part Number Qty Description Manufacturer
Job Number
----------------------------------------------------------------------------------------------------------------------------------------------------
Sheet Number
KEL-T1-1030G 4 1INX3INX6.5FT GRAY DUCT W/COVE Iboco
File Name
607-3
M9F43102 1 2A 120V Din Rail Breaker D Cur Schneider Electric
NSYTRV42SF5 1 TERMINAL BLOCK GREY Square D
PS24-S90W 1 POWER SUPPLY 24VDC 90W Veris Industries
SEBOX121806P 1 ENCL 12X18X6 NEMA 4 W/ PERF Schneider Electric
Notes
1.5" x 3"
Date:
0.25” Clearance
Preliminary
1" Clearance
1" Clearance
1" Clearance
1" Clearance
1" Clearance
COLO#-CE#- COLO#-CE#- COLO#-CE#- COLO#-CE#-
PT01 PT02 PT03 PT04
1 2 3
2” Clearance
# Change:
Revision:
HI LO HI LO HI LO HI LO
19.25 x 1.75
1.5" x 3"
1
2
3
4
5
0.25” Clearance
1" Clearance
1" Clearance
1" Clearance
1" Clearance
1" Clearance
COLO#-CE#- COLO#-CE#- COLO#-CE#- COLO#-CE#-
PT05 PT06 PT07 PT08
5/26/2022
5/26/2022
5/26/2022
Date:
Date:
Date:
2” Clearance
HI LO HI LO HI LO HI LO
19.20 x 1.75
31.50in. 30.10in.
1.5" x 3"
1" Clearance
Designed by:
Software by:
Checked by:
PHX11.COLO#-CE#-PDS01
Contractor:
Engineer:
Architect:
1" Clearance
9.21 x 1.25
PB1
Status To CC Panel
1" x 3"
1" x 3"
PDS1
R1 LR1
DP Panel Layout
26.56 x 1.25
26.56 x 1.25
1.5" Clearance
LO
HI
21.67 x 1.75
1.5" x 3"
21.65in.
24.62in.
5/27/2022
Last Printed
Last Saved
DP Panel
Part Number Qty Description Manufacturer
----------------------------------------------------------------------------------------------------------------------------------------------------
Job Number
KEL-T1-1530W 1 1.5INX3INX6.5FT WHITE DUCT W/C Iboco
KEL-X-B-376 32 1/4X1/4 X1/4 BARB TEE Parker
KEL-X-M-107 32 1/4 RUBBER CAP Kele
Sheet Number
MR1SA 8 Air Differential Pressure Tran Setra
File Name
608-1
NSYCRN86200T 1 Enclosure w/ Glazed window H80 Square D
PAS01 1 PRESS DRY SWITCH .08-1.2"WC Veris Industries
PX3PLN01 8 PRESSURE-VEL DRY PANEL LCD 1IN Veris
SQD-NSYMF86 1 BACKPANEL, 30X22, PERF, GRAY Square D
1
Refer to associated control panel wiring for # designation
From CC Panel Relief Damper B Power
From CC Panel Relief Damper A Power
From CC Panel Circuit Power
Status To CC Panel
UI#
X#N
X#H
X#N
X#H
RET
X4N
X3H
PD02
PD02
PD01
PD01
1
1
1
5
1
6
2
8
4
14
R1
Mounted in Panel
13
9
10
12
DP Panel Wiring
1
13
Set
LR1
LR1-1
10
14
9
LR1
Reset
12
Plenum
To Return
PB1
HSL2
Set @ 0.3"
NO COM
NO COM
L
Air Ref
To Outside
Job Number
National And Strategic Accounts Architect:
Revision: Preliminary
Engineer:
# Change: Date:
File Name Last Saved Contractor:
1
608 DP Panel.vsd 5/27/2022 Designed by: Date: 5/26/2022 2
3 These drawings and designs are the property of Schneider
Sheet Number Last Printed Software by: Date: 5/26/2022 Electric. Their use or reproduction without prior consent of
4
the company is strictly forbidden.
DP Panel Wiring Checked by: Date: 5/26/2022 5
608-2 5/27/2022
Notes
Install aluminum sensor support arm extending minimum of 40" (1 meter) from
5 exterior wall. Run tubing through conduit to connect to Outside Air Static
Pressure Pickup Port.
Date:
Preliminary
PANEL LABEL
# Change:
3
Revision:
2
1
2
3
4
5
5
12.00in.
9in. 40in.
1 1
5/26/2022
5/26/2022
5/26/2022
9in.
Date:
Date:
Date:
12.00in.
Designed by:
Software by:
Checked by:
Contractor:
Engineer:
Architect:
National And Strategic Accounts
5/27/2022
Last Printed
Last Saved
Job Number
Sheet Number
DP Manifold Panel
File Name
609-1
Part Number Qty Description Manufacturer
----------------------------------------------------------------------------------------------------------------------------------------------------
SCE-12DLP12 1 SUBPANEL, FLAT 9 X 9 Saginaw
SCE-12EL1206LP 1 12 X 12 X 6 Enclosure Saginaw
Electric. Their use or reproduction without prior consent of
Battery Room CO Panel Layout
# Change:
Revision:
EF OFF EF ON - + 1 2 3 4 5
6.00 x 1.25
8.00in. 7in.
24VAC
1
2
3
4
5
- + 1 2 3 4 5
5/26/2022
5/26/2022
5/26/2022
7in.
8.00in.
Date:
Date:
Date:
Designed by:
Software by:
Checked by:
Contractor:
Engineer:
Architect:
1 Battery Room CO Sensor and Exhaust Fan Wiring
5/27/2022
Last Printed
Last Saved
Part Number Qty Description Manufacturer
----------------------------------------------------------------------------------------------------------------------------------------------------
3FAL1 1 DIN: AL, PERFORATED Iboco
Job Number
9001SKS11BH1 1 SELECTOR SWITCH 600VAC 10A 30M Schneider Electric
Sheet Number
NSYTRAABV35 3 END BRACKET SCREW TYPE Square D
File Name
610-1
NSYTRAC22 8 END COVER Square D
NSYTRV42 7 6MM TERMINAL BLOCK GRAY Square D
NSYTRV42PE 1 6MM TERMINAL BLOCK GROUNDING Square D
P0808 1 SUBPANEL, FLAT 7 X 7 Wiegmann