Environmental Aspects and Impacts Evaluation REV-003
Environmental Aspects and Impacts Evaluation REV-003
Environmental Aspects and Impacts Evaluation REV-003
HSE/R1126/003
Rev. Rev.
Project: R1126 Implementation of Al Nakhli Tunnel on Dubai-Hatta Road No. Date
03 Draft
Page
Table 4-6: Environmental Aspects and Impacts Evaluation
Evaluation carried out by: Sreejith E.A (Draft) Contract/CC: CCECC Date: 16/11/2023
Environmental Waste
Environmental Aspect Area Documentation
Item Impact Management Evaluation Controls (current or required?) Rating Legislation
+ Positive or −
Consider the inputs, processes, and outputs of each Yes X No Negative on Yes X No
item Items
Legal Requirements
Stage or
Local Community
Control Measures
Interested Parties
Recover or Treat
to 1 improbable)
Product
Process
Likelihood
HSE Policy
or Current
Disposal
Severity
Recycle
Reduce
Water
Reuse
or
Land
Resource Interaction or
Air
Task or Change
or Waste
Event or
Service
NORMAL OPERATIONS
- Consider the use of recycled paper and
Mixed Solid Waste (paper, x 3 3 9 other office stationary items as much as 5
plastic bottles, food waste, Reusable and x + + + + + x x practicable to help conserve natural - Federal Law No. 24 of 1999 – Protection &
aluminum cans etc.) recyclable materials resources Development of the Environment
add-up to the waste - Segregate office waste materials from - Local Order 61 of 1991 – Environmental
dispose to landfill recyclable and non-recyclable waste. Protection Regulations in Emirates of Dubai
- Reduce paper or other reusable items as - Dubai Municipality Technical Guidelines
much as possible
1|Page
CHINA CIVIL ENGINEERING CONSTRUCTION CORPORATION Document Reference
HSE/R1126/003
Rev. Rev.
Project: R1126 Implementation of Al Nakhli Tunnel on Dubai-Hatta Road No. Date
03 Draft
Page
Table 4-6: Environmental Aspects and Impacts Evaluation
Evaluation carried out by: Sreejith E.A (Draft) Contract/CC: Date: 16/11/2023
Environmental Waste
Environmental Aspect Area Documentation
Item Impact Management Evaluation Controls (current or required?) Rating Legislation
+ Positive or −
Consider the inputs, processes, and outputs of each Yes X No Negative on Yes X No
item Items
Legal Requirements
Stage or
Local Community
Control Measures
Interested Parties
Recover or Treat
to 1 improbable)
Product
Process
Likelihood
HSE Policy
or Current
Disposal
Severity
Recycle
Reduce
Water
Reuse
or
Land
Resource Interaction or
Air
Task or Change
or Waste
Event or
Service
2|Page
CHINA CIVIL ENGINEERING CONSTRUCTION CORPORATION Document Reference
HSE/R1126/003
Rev. Rev.
Project: R1126 Implementation of Al Nakhli Tunnel on Dubai-Hatta Road No. Date
03 Draft
Page
Table 4-6: Environmental Aspects and Impacts Evaluation
Evaluation carried out by: Sreejith E.A (Draft) Contract/CC: Date: 16/11/2023
Environmental Waste
Environmental Aspect Area Documentation
Item Impact Management Evaluation Controls (current or required?) Rating Legislation
+ Positive or −
Consider the inputs, processes, and outputs of each Yes X No Negative on Yes X No
item Items
Legal Requirements
Stage or
Local Community
Control Measures
Interested Parties
Recover or Treat
to 1 improbable)
Product
Process
Likelihood
HSE Policy
or Current
Disposal
Severity
Recycle
Reduce
Water
Reuse
or
Land
Resource Interaction or
Air
Task or Change
or Waste
Event or
Service
Excessive
emission may alter - Federal Law No. 24 of 1999 – Protection &
Smoke emission from excavator site air quality, 4 4 16 - Ensure excavator machines are in good 4 Development of the Environment
machine may contribute to x x - - - - - x x condition and regularly maintained (kept - Local Order 61 of 1991 – Environmental
global warming due the records for audit) Protection Regulations in Emirates of Dubai
to CO2 - Dubai Municipality Technical Guidelines
- Federal Law No. 24 of 1999 – Protection &
Leaks from excavator Soil and/or water - Fuel-fired equipment must check Development of the Environment
machine contamination x - - - + + x x 4 4 16 regularly for possible leak and repair 4 - Local Order 61 of 1991 – Environmental
from leaks immediately once it was observed Protection Regulations in Emirates of Dubai
- Dubai Municipality Technical Guidelines
- Locate the activity far as much as
possible from residential area if not
applicable provide any engineering design
of noise reduction technique (i.e. install - Federal Law No. 24 of 1999 – Protection &
Nuisance to enclosure or noise reducing device to the Development of the Environment
Noise emission sensitive receptors x x x - - - - - x x x 4 4 16 source of noise) equipment must regularly 4 - Local Order 61 of 1991 – Environmental
maintain to ensure it will not emit Protection Regulations in Emirates of Dubai
excessive noise. - Dubai Municipality Technical Guidelines
- Require workers working near and
on noisy environment to wear hearing
protection
Piling Excessive emission
- Federal Law No. 24 of 1999 – Protection &
will alter site’s air - Ensure excavator machines are in good
Development of the Environment
Smoke emission quality or may x x - - - - - x x 4 4 16 condition and regularly maintained (kept 4
- Local Order 61 of 1991 – Environmental
contribute to global the records for audit)
Protection Regulations in Emirates of Dubai
warming
due to CO2 - Dubai Municipality Technical Guidelines
- Provide engineering design method to - Federal Law No. 24 of 1999 – Protection &
Potential damage
minimize vibration especially activity near Development of the Environment
Vibration to near 3 3 9 3
x x - - - - - x x structure or buildings or adopt best - Local Order 61 of 1991 – Environmental
structure/building
management control Protection Regulations in Emirates of Dubai
due to vibration
measure (e.g. British Standard).
Soil and/or water - Stationary or mobile fuel-fired - Federal Law No. 24 of 1999 – Protection &
Leaks from equipment contamination x - - - - - x x x 3 4 12 Equipment use in piling must regularly 4 Development of the Environment
from leaks check for leak. Static equipment must be - Local Order 61 of 1991 – Environmental.
placed on impermeable ground - Protection Regulations in Emirates of Dubai
surface and not direct on the bare soil
3|Page
CHINA CIVIL ENGINEERING CONSTRUCTION CORPORATION Document Reference
HSE/R1126/003
Rev. Rev.
Project: R1126 Implementation of Al Nakhli Tunnel on Dubai-Hatta Road No. Date
03 Draft
Page
Table 4-6: Environmental Aspects and Impacts Evaluation
Evaluation carried out by: Sreejith E.A (Draft) Contract/CC: Date: 16/11/2023
Environmental Waste
Environmental Aspect Area Documentation
Item Impact Management Evaluation Controls (current or required?) Rating Legislation
+ Positive or −
Consider the inputs, processes, and outputs of each Yes X No Negative on Yes X No
item Items
Legal Requirements
Stage or
Local Community
Control Measures
Interested Parties
Recover or Treat
to 1 improbable)
Product
Process
Likelihood
HSE Policy
or Current
Disposal
Severity
Recycle
Reduce
Water
Reuse
or
Land
Resource Interaction or
Air
Task or Change
or Waste
Event or
Service
Soil/water - Provide suitable container for hazardous - Federal Law No. 24 of 1999 – Protection &
Generation of hazardous contamination if waste and store in such a way that it will Development of the Environment
waste wastes are not store x - - + + + x x 4 4 16 not result a ground or water 5 - Local Order 61 of 1991 – Environmental
and dispose contamination (place not Protection Regulations in Emirates of Dubai
properly directly on the ground) prior to disposal - Dubai Municipality Technical Guidelines
4|Page
CHINA CIVIL ENGINEERING CONSTRUCTION CORPORATION Document Reference
HSE/R1126/003
Rev. Rev.
Project: R1126 Implementation of Al Nakhli Tunnel on Dubai-Hatta Road No. Date
03 Draft
Page
Table 4-6: Environmental Aspects and Impacts Evaluation
Evaluation carried out by: Sreejith E.A (Draft) Contract/CC: Date: 16/11/2023
Environmental Waste
Environmental Aspect Area Documentation
Item Impact Management Evaluation Controls (current or required?) Rating Legislation
+ Positive or −
Consider the inputs, processes, and outputs of each Yes X No Negative on Yes X No
item Items
Legal Requirements
Stage or
Local Community
Control Measures
Interested Parties
Recover or Treat
to 1 improbable)
Product
Process
Likelihood
HSE Policy
or Current
Disposal
Severity
Recycle
Reduce
Water
Reuse
or
Land
Resource Interaction or
Air
Task or Change
or Waste
Event or
Service
- Provide cover while transporting - Federal Law No. 24 of 1999 – Protection &
Alteration of public Development of the Environment
Dust emission 3 3 9 backfill or excavated materials on or off 3
and site air quality x x - - - - - x x x
site, dampen the load when offloading - Local Order 61 of 1991 – Environmental
(air pollution) Protection Regulations in Emirates of Dubai
whenever is practical
- Dubai Municipality Technical Guidelines
Transportation and - Federal Law No. 24 of 1999 – Protection &
offloading of excavated Debris falling along public road Nuisance to the - Secure the load in such a way that debris Development of the Environment
or backfill materials public x x x - - - - - x x x 3 3 9 will not fall along the road 3 - Local Order 61 of 1991 – Environmental
Protection Regulations in Emirates of Dubai
- Dubai Municipality Technical Guidelines
- Federal Law No. 24 of 1999 – Protection &
- Ensure imported backfill materials is
Ground Development of the Environment
Contaminated backfill 4 3 12 free from contaminants, acquire 3
contamination x x + - - + + x x x - Local Order 61 of 1991 – Environmental
laboratory test and required permit
Protection Regulations in Emirates of Dubai
whenever is required
- Dubai Municipality Technical Guidelines
Alteration to siteair - Federal Law No. 24 of 1999 – Protection &
- Install proper ventilation in dusty
Dust emission quality and visual x x - - - - - x x x x 4 4 16 4 Development of the Environment
working area
impact - Local Order 61 of 1991 – Environmental
Provide appropriate PPE for workers Dubai
Protection Regulations in Emirates of Dubai
Municipality Technical Guidelines
Cutting of concrete blocks Nuisance to workers - Locate the activity far as much as - Federal Law No. 24 of 1999 – Protection &
and grinding ofconcrete Noise emission and near sensitive 4 4 16 possible from sensitive area like 4 Development of the Environment
surface receptors x x x - - - - - x x x x residential - Local Order 61 of 1991 – Environmental
Protection Regulations in Emirates of Dubai
- Equip the workers with suitable
- Dubai Municipality Technical Guidelines
hearing protection
Concrete block - Federal Law No. 24 of 1999 – Protection &
- - Segregate concrete block waste
Generation of concreteblock waste add-up to 4 4 16 4 Development of the Environment
materialsfrom recyclable and non-
waste the volume of x x + + + + + x x x recyclable waste - Local Order 61 of 1991 – Environmental
waste dispose to Protection Regulations in Emirates of Dubai
landfill - Dubai Municipality Technical Guidelines
- Federal Law No. 24 of 1999 – Protection &
Alteration to site - Spray the road with water regularly Development of the Environment
Dust accumulation air quality and x x - - - - - x x x 4 4 16 especially during windy and condition 4 - Local Order 61 of 1991 – Environmental
Moving and passing of visual impact and implement site speed limit Protection Regulations in Emirates of Dubai
mobile equipment on - Dubai Municipality Technical Guidelines
site Excessive emission
- Federal Law No. 24 of 1999 – Protection &
will alter air quality - Develop traffic management plan and
Traffic and emission from Development of the Environment
or may contributes x x - - - - - x x x 4 4 16 switch off engine when not in use, no 4
equipment - Local Order 61 of 1991 – Environmental
to global warming idling mode
Protection Regulations in Emirates of Dubai
due to CO2
- Dubai Municipality Technical Guidelines
5|Page
CHINA CIVIL ENGINEERING CONSTRUCTION CORPORATION Document Reference
HSE/R1126/003
Rev. Rev.
Project: R1126 Implementation of Al Nakhli Tunnel on Dubai-Hatta Road No. Date
03 Draft
Page
Table 4-6: Environmental Aspects and Impacts Evaluation
Evaluation carried out by: Sreejith E.A (Draft) Contract/CC: Date: 16/11/2023
Environmental Waste
Environmental Aspect Area Documentation
Item Impact Management Evaluation Controls (current or required?) Rating Legislation
+ Positive or −
Consider the inputs, processes, and outputs of each Yes X No Negative on Yes X No
item Items
Legal Requirements
Stage or
Local Community
Control Measures
Interested Parties
Recover or Treat
to 1 improbable)
Product
Process
Likelihood
HSE Policy
or Current
Disposal
Severity
Recycle
Reduce
Water
Reuse
or
Land
Resource Interaction or
Air
Task or Change
or Waste
Event or
Service
6|Page
CHINA CIVIL ENGINEERING CONSTRUCTION CORPORATION Document Reference
HSE/R1126/003
Rev. Rev.
Project: R1126 Implementation of Al Nakhli Tunnel on Dubai-Hatta Road No. Date
03 Draft
Page
Table 4-6: Environmental Aspects and Impacts Evaluation
Evaluation carried out by: Sreejith E.A (Draft) Contract/CC: Date: 16/11/2023
Environmental Waste
Environmental Aspect Area Documentation
Item Impact Management Evaluation Controls (current or required?) Rating Legislation
+ Positive or −
Consider the inputs, processes, and outputs of each Yes X No Negative on Yes X No
item Items
Activity
Legal Requirements
Legal Requirements
Disposal
Severity
or
Recycle
Change
Reduce
Local Community
Control Measures
Water
Interested Parties
Recover or Treat
Reuse
Land
or
Air
Waste
HSE Policy
Event or
Service
- Store, handle and use chemical paints as - Federal Law No. 24 of 1999 – Protection &
Alteration of work Development of the Environment
Emission of fumes 4 3 12 per MSDS. DO NOT store chemicals 3
Waterproofing area air quality x x - - - - - x x x
direct on the sunlight or on the ground - Local Order 61 of 1991 – Environmental
Protection Regulations in Emirates of Dubai
- Dubai Municipality Technical Guidelines
Pollution to soil
- Federal Law No. 24 of 1999 – Protection &
Storage and handling of paint and ground and - Provide proper storage for hazardous
Development of the Environment
materials, thinner and other underground water x + - - + + x x 4 4 16 chemical such as used paint containers, 4
- Local Order 61 of 1991 – Environmental
hazardous chemicals if not properly etc. cover and place on impervious
Protection Regulations in Emirates of Dubai
collected ground with bund
- Dubai Municipality Technical Guidelines
and treated
7|Page
CHINA CIVIL ENGINEERING CONSTRUCTION CORPORATION Document Reference
HSE/R1126/003
Rev. Rev.
Project: R1126 Implementation of Al Nakhli Tunnel on Dubai-Hatta Road No. Date
03 Draft
Page
Table 4-6: Environmental Aspects and Impacts Evaluation
18 of 89
Evaluation carried out by: Contract/CC: Date: 16/11/2023
Environmental Waste
Environmental Aspect Area Documentation
Item Impact Management Evaluation Controls (current or required?) Rating Legislation
+ Positive or −
Consider the inputs, processes, and outputs of each Yes X No Negative on Yes X No
item Items
constantto 1 improbable)
Legal Requirements
Legal Requirements
Local Community
Control Measures
Interested Parties
Recover or Treat
Stage or Product
HSE Policy
Likelihood
Process
Disposal
or
Severity
Current
Recycle
Reduce
Water
Reuse
Land
or
Air
Resource Interaction or
=
Task or Change
or Waste
Event or
Service
- Construct a good design of washing - Federal Law No. 24 of 1999 – Protection &
Soil and water area with capable to trap all wash-out Development of the Environment
Generation of concrete contamination and separate oil or sediments from water - Local Order 61 of 1991 – Environmental
wash-out/ wastewater from concrete x + + + + + x x x x 4 5 20 - Regular collection of concrete washout 5 Protection Regulations in Emirates of Dubai
wash-out/ /waste water (kept the record foraudit) - Dubai Municipality Technical Guidelines
wastewater
- Segregate concrete block waste - Federal Law No. 24 of 1999 – Protection &
Concrete waste
Generation of concrete materials from recyclable and non- Development of the Environment
add-up to the 4 5 20 5
Laboratory testing of waste x x + + + + + x x x recyclable waste - Local Order 61 of 1991 – Environmental
mixed concrete volume of waste
- Pour concrete in intended amount, DO Protection Regulations in Emirates of Dubai
dispose to landfill
NOT allow to spill on the ground - Dubai Municipality Technical Guidelines
Soil and water - Provide proper storage for hazardous
contamination if wastes such as used paint containers, - Federal Law No. 24 of 1999 – Protection &
hazardous waste contaminated soil etc. cover and place on Development of the Environment
Generation of hazardous x x + + + + + x x x 4 5 20 impervious ground with bund prior to 5 - Local Order 61 of 1991 – Environmental
waste (used chemical
collection and disposal of approved Protection Regulations in Emirates of Dubai
container) if not
store and dispose
waste hauler (kept the record for audit) - Dubai Municipality Technical Guidelines
- DO NOT mix with other wastes
properly
- Locate noise generating activity far as
possible from the sensitive receptors if not
applicable provide good engineering noise - Federal Law No. 24 of 1999 – Protection &
Nuisance to near control such as enclosure or noise reducing Development of the Environment
Activity near sensitive Noise emission x x x - - - - - x x x 4 4 16 4
sensitive equipment (i.e. silencer). Use equipment - Local Order 61 of 1991 – Environmental
receptor (i.e. residentialor
receptor that is in good working condition and Protection Regulations in Emirates of Dubai
near establishment)
regularly maintain, send excessive noise Dubai Municipality Technical Guidelines
generating equipment for service
8|Page
CHINA CIVIL ENGINEERING CONSTRUCTION CORPORATION Document Reference
HSE/R1126/003
Rev. Rev.
Project: R1126 Implementation of Al Nakhli Tunnel on Dubai-Hatta Road No. Date
03 Draft
Page
Table 4-6: Environmental Aspects and Impacts Evaluation
Likelihood
Legal Requirements
Legal Requirements
Local Community
Control Measures
Disposal
Interested Parties
Recover or Treat
Severity
Task
Recycle
Reduce
Water
Reuse
or Change
Land
Air
HSE Policy
or Waste
Event or
Service
9|Page
CHINA CIVIL ENGINEERING CONSTRUCTION CORPORATION Document Reference
HSE/R1126/003
Rev. Rev.
Project: R1126 Implementation of Al Nakhli Tunnel on Dubai-Hatta Road No. Date
03 Draft
Page
Table 4-6: Environmental Aspects and Impacts Evaluation
constantto 1 improbable)
Legal Requirements
Legal Requirements
Local Community
Control Measures
Interested Parties
Recover or Treat
Stage or Product
HSE Policy
Likelihood
Process
Disposal
or
Severity
Current
Recycle
Reduce
Water
Reuse
Land
or
Air
Resource Interaction or
=
Task or Change
or Waste
Event or
Service
- ABNORMAL OPERATIONS
Use of non-good condition Excessive emission of noise Nuisance of near x x x - - - - - x x x 3 3 9 - All fuel-fired equipment should be 3 - - Federal Law No. 24 of 1999 – Protection &
equipment sensitive area and to regularly maintained prior to use (kept Development of the Environment Local Order 61
workers records for audit) of 1991 – Environmental
Protection Regulations in Emirates of Dubai
- Dubai Municipality Technical Guidelines
Alteration of site
Excessive emission of air quality and may
smoke contribute to global x x - - - - - x x x x 3 3 9 3
warming
due to CO2
Soil and water - All fuel-fired equipment must need to
Leaks (surface and x - - - - - x x x 3 4 12 have drip tray or containment that can 4
underground) carry a spill during refuelling and
contamination maintenance
Hazardous chemicals 4 5 20 5
x + - - + + x x x
10 | P a g e
CHINA CIVIL ENGINEERING CONSTRUCTION CORPORATION Document Reference
HSE/R1126/003
Rev. Rev.
Project: R1126 Implementation of Al Nakhli Tunnel on Dubai-Hatta Road No. Date
03 Draft
Page
Table 4-6: Environmental Aspects and Impacts Evaluation
Legal Requirements
Stage or
Local Community
Control Measures
Interested Parties
Recover or Treat
to 1 improbable)
Product
Process
Likelihood
HSE Policy
or Current
Disposal
Severity
Recycle
Reduce
Water
Reuse
or
Land
Resource Interaction or
Air
Task or Change
or Waste
Event or
Service
11 | P a g e
CHINA CIVIL ENGINEERING CONSTRUCTION CORPORATION Document Reference
HSE/R1126/003
Rev. Rev.
Project: R1126 Implementation of Al Nakhli Tunnel on Dubai-Hatta Road No. Date
03 Draft
Page
Table 4-6: Environmental Aspects and Impacts Evaluation
Legal Requirements
Stage or
Local Community
Control Measures
Interested Parties
Recover or Treat
to 1 improbable)
Product
Process
Likelihood
HSE Policy
or Current
Disposal
Severity
Recycle
Reduce
Water
Reuse
or
Land
Resource Interaction or
Air
Task or Change
or Waste
Event or
Service
Distribution: Project Manager Construction Planning Manager HSE Engineer Quality Site HSE Client / Others
Manager Manager Consultant
Severity
year needed
3 Moderate Insignificant 1 Low 1 Low 2 Low 3 Low 4 Low 5
Approximately once A single failure will cause the
3 Likely 4 Serious
every 6 months incident Minimal 2 Low 2 Low 4 Low 6 Medium 8 Medium 10
Approximately once per 5 Extreme Moderate 3 Low 3 Low 6 Medium 9 Medium 12 High 15
4 Very Likely Difficult to avoid
month Serious 4 Low 4 Medium 8 Medium 12 High 16 High 20
Prepared By: HSE Engineer Reviewed By: Deputy Project Manager Approved By: Project Manager
12 | P a g e