Digital Twinsand Blockchaintechnologiesforbuildinglifecyclemanagement
Digital Twinsand Blockchaintechnologiesforbuildinglifecyclemanagement
Digital Twinsand Blockchaintechnologiesforbuildinglifecyclemanagement
net/publication/373696895
CITATIONS READS
0 177
4 authors, including:
Nashwan Dawood
Teesside University
234 PUBLICATIONS 3,702 CITATIONS
SEE PROFILE
All content following this page was uploaded by Nana Akua Adu-Amankwa on 06 September 2023.
Automation in Construction
journal homepage: www.elsevier.com/locate/autcon
Review
A R T I C L E I N F O A B S T R A C T
Keywords: This paper reviews the potential applications of Digital Twins (DT) and Blockchain (BC) technologies throughout
Digital Twin the building lifecycle phases by conducting a double-stranded systematic review of papers on the possible use of
Blockchain DT and BC. The results revealed the increasing interest in DT and BC and their potential use in all building
Building lifecycle management
lifecycle phases; however, studies focused mainly on the construction phase. The findings also revealed unique
Construction
features of DT and BC, potentially supporting the proposal for their collaborative implementation to enhance
Digital adoption
Industry 4.0 building lifecycle management. This review’s findings positioned the argument for more research on integrating
DT and BC to augment building lifecycle management and the need to explore their relevance or role when
transitioning from construction to post-construction. This paper elucidates readers on the potential role of DT
and BC while developing a built asset and suggests directions for future research.
* Corresponding author.
E-mail address: f.rahimian@tees.ac.uk (F. Pour Rahimian).
https://doi.org/10.1016/j.autcon.2023.105064
Received 18 April 2023; Received in revised form 3 July 2023; Accepted 17 August 2023
Available online 26 August 2023
0926-5805/© 2023 The Authors. Published by Elsevier B.V. This is an open access article under the CC BY license (http://creativecommons.org/licenses/by/4.0/).
N.A.N. Adu-Amankwa et al. Automation in Construction 155 (2023) 105064
solutions for issues like schedule delays and budget overruns, empow 2. Overview of building lifecycle management
ering stakeholders to make informed decisions proactively [66]. IoT
sensors coupled with DTs can also make BIM a living instrument, This study’s perspective is on a building’s lifecycle, which can be
automatically updating ‘as-built’ BIM [29]. Several studies have high divided into preconstruction, construction, and post-construction phases
lighted that creating and managing DT is a journey relevant to the entire [99], where stakeholders perform value-generating activities at each
project lifecycle [138]. Nonetheless, these studies have also underscored phase according to defined requirements. The preconstruction phase
the significance of ensuring security, reliability, and improved collabo includes project initiation, planning, design etc., executed before con
ration concerning the generated data [46]. struction. The construction phase includes works carried out to monitor
Consequently, BC provides potentially unified standards and pro and achieve project outputs, whilst the post-construction phase consists
tocols for information sharing with a decentralised peer-to-peer frame of activities undertaken after construction works are complete,
work and addresses information security and privacy based on the including monitoring building operations, maintenance activities etc.
cryptographic mechanism [32,123]. Hence, BC could be a suitable The management of each phase is generally done independently due
technology to overcome or manage the challenges of DT regarding its to the different activities and stakeholders involved; however, partici
security, reliability and enhancing trust and transparency throughout a pants are confronted with a lot of data across the different phases, which
built asset’s lifecycle [62]. BC can also be a channel to address failures in is crucial in understanding the performance of building systems and
communication among project participants and minimise information components and informing decision-making [82]. Therefore, effective
loss during a building’s lifecycle [33]. resource management is imperative for successful project management
With the AEC-FM industry’s increasing research focus on the po and critical for organising and exploiting relevant information to sup
tential of emerging technologies, significant literature reviews have port decision-making processes throughout the project lifecycle.
been carried out on DT or BC studies. Within DT literature, reviews have The AEC-FM industry still lacks a comprehensive way to manage,
focused on DT applications for building energy efficiency [7], DT ap capture, exchange, use, and control data and information throughout an
plications in the construction industry [95], the drivers for DT adoption asset’s lifecycle [50], especially during the transition from construction
[96], and DT fault detection in buildings [48]. Similarly, BC reviews to post-construction, which usually comprises building handover ac
have focused on BC’s potential and limitations [91], the risks and op tivities, considered critical and increasingly required for every building
portunities of BC applications in the construction industry [19], and the due to the recent incorporation of complex building systems [107].
anticipated benefits and challenges of applying BC in AEC [13]. Despite Building handover activities, including commissioning and post-
the growing number of reviews, little attention has been paid to high occupancy evaluation, are faced with the issues of manual data
lighting the complementary potential of DT and BC in the AEC-FM handling, inconsistencies in the representation, format and meaning of
literature. To the best of the authors’ knowledge, only one similar re the data generated [82], which can lead to errors and data loss, frag
view study has been conducted by Sadri et al. [111], who examined the mented and inaccurate information, and poor decision-making. This
potential of enabling technologies in integrating BC and DT in the smart results in critical issues during post-construction activities, which costs
built environment. Nevertheless, their study lacks a comprehensive re time and money [83]. Therefore, there is a need to focus on the efficient
view of the potential applicability of BC and DT during the different management and continuity of relevant information to enhance effective
stages of a building’s life cycle. Although increasing studies on DT and management and decision-making, especially when the building is in
BC indicate that their relevance encompasses all the phases of the life use.
cycle of a building, this study delves into the potential utilisation and the One possible way to ensure efficient decision-making and effective
rationale for the integration of DT and BC at the different phases of a management throughout a building’s lifecycle and contribute to
building’s lifecycle to help identify the trends and possible application addressing transition issues is to explore the relevance of BC and DT
areas. Hence this paper presents a systematic literature review to tackle throughout the different lifecycle phases. Consequently, effective ‘real-
the following: time’ monitoring, secured data management and enhanced collabora
tion are needed to improve the management of a built asset.
1. State-of-art DT applications within the context of preconstruction,
construction, and post-construction lifecycle phases. 3. Research methodology
2. State-of-art of BC applications within preconstruction, construction,
and post-construction lifecycle phases. A systematic literature review was selected as the most suitable
3. Identify the complementary features of DT and BC necessary for method to effectively determine the current state of research in a focal
enhanced building lifecycle management. field of study. This approach enables structured gathering, evaluation,
4. Highlight research gaps identified for both DT and BC applications and synthesis of relevant literature to provide valuable insights and
within the context of building lifecycle phases. identify potential areas for further research [38]. This study’s systematic
literature review focuses explicitly on works related to the potential use
The significance of this study lies in its contribution to the frontier of of DT and BC for the preconstruction, construction, and post-
knowledge on the relevance of emerging technologies in the Architec construction phases of a building. By focusing on a systematic litera
ture, Engineering, Construction and Facility Management (AEC-FM) ture review of DT and BC technologies for the AEC-FM industry, the
industry. It supports nudging further research directions for actualising study identifies relevant evidence within the extant literature [37]. Two
the desired state of digital construction, especially incorporating digital strands of the review were conducted, namely, DT and BC, ensuring both
technologies in building lifecycle management. The remainder of the strands adhered to systematic literature review techniques and princi
article is structured as follows: Section 2 gives a background overview of ples of conduct like replicability, retrievability, summarisation, syn
the core constructs of this study. Section 3 outlines the systematic thesis and transparency.
literature review process adopted for this study. Section 4 presents the To improve the process quality and mitigate against the risk of bias, a
results of the literature review. Section 5 discusses the literature find comprehensive search was performed across two databases, namely
ings, highlighting the gaps and the study’s limitations. Section 6 high Scopus and Web of Science Core Collection, based on recommendations
lights the recommendations emerging from this study, and Section 7 from the Peer Review of Electronic Search Strategies (PRESS) [84].
finally summarises and concludes the study. These databases were chosen because they are the top two ranked da
tabases for trustworthy and peer-reviewed research, which indexes most
academic publications worldwide [54]. This search strategy of utilising
at least two literature sources was considered apt since not all
2
N.A.N. Adu-Amankwa et al. Automation in Construction 155 (2023) 105064
3
N.A.N. Adu-Amankwa et al. Automation in Construction 155 (2023) 105064
Fig. 1. PRISMA Flow Diagram for Digital Twin and Blockchain Strands.
literature that threatens the implementation of DT in the built envi achieving net zero carbon emissions in a built environment, developed a
ronment include a lack of consensus on DT concepts in practice, diffi conceptual framework of DT to enable the capturing and monitoring of
culty in exhaustively evaluating DTs’ varied capabilities, and struggle real-time conditions of buildings for enhanced decision-making on car
experienced by practitioners in clear understanding of the required bon emissions and environmental issues throughout a built asset’s life
changes in an organisation’s processes to realise and sustain value cycle. Meschini et al. [85] further adopted an approach to integrate DT
generated from the DT [2]. See Table 3 for the classification summary of prototypes and artificial intelligence to automate and evaluate tendering
literature included in the DT strand according to constructed themes. procedures, optimise performance and contribute to sustainability.
4
N.A.N. Adu-Amankwa et al. Automation in Construction 155 (2023) 105064
5
N.A.N. Adu-Amankwa et al. Automation in Construction 155 (2023) 105064
Table 3
Overview of Digital Twin Application Themes from AEC-FM Literature.
Building Lifecycle Phase No of Studies DT LITERATURE
Authors/References
For construction management, Sun and Liu [121] proposed a DT-BIM proposed method contributes to making risk-informed decisions and
hybrid model to aid in decision-making, progress updates, dispatching implementing proactive measures towards hurricane preparedness.
resources and identifying the shortage of resources. DTs can assist in
quality evaluation during construction by providing insights into geo 4.2.3. DT for post-construction phase
metric quality, checking completeness and accuracy, and helping guide DT literature retrieved for post-construction was mainly focused on
adjustments of building elements [130]. Jiang [56] applied DT tech the use of DT for real-time interactions, predictability, enhanced
nology to the simulation of the construction process and construction decision-making during operation and maintenance activities, facility,
management, featuring construction site management, safety during and asset management. According to Rao et al. [103], DT has the po
construction, and quality and operation management. The study tential to aid facility managers in testing and planning maintenance
explored the effectiveness of DT construction management via simula activities and monitoring and predicting building conditions. Y. Liu et al.
tion research, which proved that the efficiency of construction man [75] further posit that DT has the potential to provide owners and
agement could be enhanced via the timely formulation of a reliable property managers with real-time operational costs of green buildings,
construction management plan. Lin and Wu [136] introduced an inte providing a reasonable basis for effective decision-making.
grated framework for twinning and mining a construction project’s In work undertaken by Y. Zhao et al. [147], a framework involving
collaborative network, which entailed collecting collaborative data the integration of a machine learning algorithm with a DT for building
related to the construction project’s on-site inspection. The proposed operations was proposed. According to the studies, the distinct charac
framework allows managers to evaluate collaborators’ performance, teristics of DT’s virtual interaction and real-time response provide a
detect critical actors and understand how people work collaboratively to platform to achieve intelligent operation and maintenance management
complete construction tasks. via data-driven intelligent prediction and diagnosing the status of a
The emergence of DT platforms for construction safety has also building’s operation and maintenance. Using a data-driven approach,
become necessary for timely, intelligent safety decision-making via Vivi et al. [133] presented a system architecture for developing DTs at
deriving safety information from value-creating raw data [127]. Chro the building level to provide a platform for humans to relate to buildings
nopoulos et al. [16] proposed a safety framework which involved the via intelligent and sustainable channels. The research was further
interaction with a DT platform to aid in the reduction of potential haz examined using real-world development to establish the capability of DT
ards on construction sites. As part of the framework, sensory information in predicting, tracking, and improving asset maintenance. Wang et al.
was continuously integrated with the DT in a construction environment [134] focused on developing a DT-based built environment sensing and
to identify hazard areas, predict accidents and their impacts, and notify monitoring which incorporates data required to support real-time
the workers of these hazards. From a disaster preparedness perspective, environmental monitoring and communicates actionable insights for
Kamari and Ham [57] proposed a novel method based on DT and risk informed decisions while managing building facilities.
assessment to aid in hurricane preparedness by systematically identi Lin et al. [73] proposed a live DT model that included the develop
fying potential wind-borne debris based on job site characteristics. The ment of the dynamic behaviour of a building’s HVAC system via sensor
6
N.A.N. Adu-Amankwa et al. Automation in Construction 155 (2023) 105064
data to facilitate the efficient analysis of a constructed environment. The applications seem to be a rapidly growing focus.
authors posit that the use of DT for HVAC systems in the built envi
ronment aids in the significant reduction of cost of energy usage whilst
maintaining occupant comfort. Findings from the framework proposed 4.4. Blockchain for building lifecycle phases
by Hosamo et al. [49] demonstrated that the efficiency of an HVAC
system could be enhanced via automatic fault detection of air handling Although BC is regarded as the technology likely to have a significant
units. The proposed approach utilises a DT predictive maintenance impact [32], due to its potential to solve some problems experienced in
framework to diagnose and detect faults and predict the conditions of the industry, it is still relatively new to industry players. BC studies
building components. The research highlighted the possibility of retrieved were also clustered into their potential use for building life
formulating and implementing maintenance strategies to overcome the cycle phases. Research on BC in AEC-FM literature has indicated its
limitations in building facilities’ maintenance management systems. potential to enhance construction efficiency, reduce issues with frag
mentation and communication and lessen paper-based operational ac
tivities [59]. See Fig. 7 for a summary of BC application areas within a
4.3. Overview of studies on Blockchain for building lifecycle phases building’s lifecycle found in the literature.
BC’s development in the AEC-FM industry is still hampered by some
Results from the BC strand of the systematic literature review process challenges [59]. According to Kumar Singh et al. [65], some challenges
to answer this study’s aim on the state-of-the-art and potential gaps are can be deduced from stakeholders’ unawareness of BC, stakeholders’
presented hereafter. Sixty-four papers emerged from the BC strand and unwillingness to adopt and rely on new technology and the discomfort of
were utilised within this section to derive the presented results. Publi sharing business information in a distributed environment. On the other
cations included within the BC strand span over a timeline from 2018 to hand, Sharma and Kumar [115] suggest that adopting BC, like any new
2023 and are growing significantly, as revealed in their distribution: technology, may depend on stakeholders’ willingness to take a risk and
2018 (1 paper); 2019 (9 papers); 2020 (13 papers); 2021 (20 papers); their preparedness to invest in this unproven concept even though it has
2022 (18 papers); and 2023 (3 papers). Also, the main document types great potential. See Table 4 for the classification summary of literature
were Journal Articles (43 papers) and Conference Papers (21 papers). included in the BC strand according to constructed themes.
Fig. 5 and Fig. 6, respectively, present trends on papers grouped into
building lifecycle phases based on publication years and type. Addi 4.4.1. BC for preconstruction phase
tionally, a cumulative count of papers based on publication years and Research on BC for preconstruction activities mainly focused on
document types demonstrates the aggregated research growth patterns. using BC for the planning process, sustainable building design, design
The observed trends in Fig. 5 and Fig. 6 suggest that within confer collaboration, optimisation of the design process, and tendering evalu
ence and journal papers, BC applications in the preconstruction phase ation. Studies of BC implementation are increasing, mainly due to its
were an initial focus; however, traction for construction phase applica potential to enhance transparency in a collaborative environment [28].
tions has dominated the research timeframe, whilst post-construction Berawi et al. [6] suggested a BIM-based BC model to support
7
N.A.N. Adu-Amankwa et al. Automation in Construction 155 (2023) 105064
information management to enhance collaboration during an intelligent accountability, and transparency of data. To overcome the problems of
building’s planning process. Findings from the study indicated that data tampering during preconstruction activities, Gong et al. [36]
employing decentralised ledgers can reinforce the quality and consis explored solutions to the e-tendering process by creating a secure
tency of data for effective planning and enhance the security, blockchain-based evaluation framework to secure data during e-
8
N.A.N. Adu-Amankwa et al. Automation in Construction 155 (2023) 105064
9
N.A.N. Adu-Amankwa et al. Automation in Construction 155 (2023) 105064
(108 papers). Within that same period, the observed years of publica have rapidly grown, with most of the dominant studies focusing on
tions were 2020–2022 (98 papers), and they collectively represent about preconstruction and construction activities, whilst the attention on post-
90% of DT and BC studies within the AEC-FM context. Interestingly the construction activities seems to be emerging. BC’s integration was
proportion of document types favoured conference papers within 2020 considered suitable for any phase dealing with data management and
(59%), but this switched in favour of journal articles from 2021 (64%) smart contracts, thus invariably making it ideal for managing each phase
and 2022 (79%), which suggested an increasing pattern of research in a built asset’s lifecycle. Similarly, and extendedly over the snapshot
rigour for peer-reviewed journals on DT and BC studies. years (2018–2023), most discovered studies in this review were pub
lished after 2018, with a dominant focus shift from the preconstruction
5.1. State-of-art DT applications within the context of preconstruction, phase to the construction phase. There is rapidly emerging attention for
construction, and post-construction lifecycle phases post-construction applications, which may suggest an appreciation for
having accurate decentralised information throughout a building’s
Findings on DT functions for a building’s lifecycle have shown lifecycle. Similar BC review studies by Scott et al. [113] reinforce the
increasing research in the field of DT. Studies have indicated the po growing interest in BC studies. The study found that the publication of
tential benefits to be derived from the implementation of DT during each new literature on BC increased by a significant rate of 184% between
lifecycle phase. Studies retrieved predominantly focused on 2017 and 2020.
construction-related activities compared to the other lifecycle phases.
There is also emerging attention to preconstruction activities, which 5.3. Identify the complementary features of DT and BC necessary for
may suggest attention to the early incorporation of DT during the enhanced building lifecycle management
development of a built asset. The authors speculate that the discovered
pattern relating to the use of DT within both the construction and post- Studies on the various functional aspects of DT have revealed unique
construction phases could be related to the need for an existing physical characteristics that can enhance the value and outcome of integrating
artefact to twin as a digital equivalent. This may clarify the few studies DT in all stages of a building’s lifecycle (see Fig. 8). The identified fea
on DT within the preconstruction phase. However, these results tures of DT from these studies include its ability to analyse and visualise
contradict previous studies by some scholars like Opoku et al. [95], who data, capture real-time information, optimise processes, simulate sce
found that DT research primarily focused on preconstruction activities narios, and make predictions. These distinct features align with existing
such as design and engineering. literature and have the potential to improve collaboration, decision-
Furthermore, Opoku et al.’s (2021) research indicated a lack of making, and resource management, leading to efficient and effective
literature on DT applications in the construction phase. These disparities management of each phase of a building’s lifecycle [4,95,141].
may be due to the different time frames considered for literature Meanwhile, BC’s consensus mechanism, decentralised capability,
retrieval. Opoku et al. [95] analysed studies conducted between 2010 security, immutability, privacy, and data provenance are the distinct
and 2020, resulting in 22 relevant papers. In contrast, this study features that emerged from the studies analysed. These distinct features
reviewed DT studies conducted from 2018 to the end of 2022, resulting can enhance collaboration, enhance trust and transparency between
in 48 papers. Despite these differences in findings, both studies confirm project participants, enhance decision-making and contribute to
the growing interest in DT research. improved management throughout a building’s lifecycle. Findings on
BC’s distinct features are further reinforced by literature highlighting
5.2. State-of-art of BC applications within preconstruction, construction, the potential of BC to contribute to better resource management, elim
and post-construction lifecycle phases inate disputes and reduce costs [68,113].
An overview of the distinct characteristics of both DT and BC reveals
Studies on BC’s use for the different phases of a building’s lifecycle a perspective which reinforces the potential for DT and BC integration to
Fig. 8. Features of Digital Twin and Blockchain identified from AEC-FM Literature.
10
N.A.N. Adu-Amankwa et al. Automation in Construction 155 (2023) 105064
11
N.A.N. Adu-Amankwa et al. Automation in Construction 155 (2023) 105064
construction). The paper explored the distinct features from the [6] M.A. Berawi, T.Y. Zagloel, M.N. Ariq, M.A. Sari, Blockchain-Based BIM Model for
the Smart Building Planning Process, 2021/10//, ACM, New York, NY, USA,
retrieved DT and BC literature. It was discovered, from the reviewed
2021, https://doi.org/10.1145/3527049.3527140.
papers, that potential uses of DT and BC encompass all building lifecycle [7] R. Bortolini, R. Rodrigues, H. Alavi, L.F.D. Vecchia, N. Forcada, Digital Twins’
phases, but the dominantly focused phase is the construction phase. applications for building energy efficiency: a review, Energies 15 (2022) 7002,
Findings revealed potential applications for DT, including planning https://doi.org/10.3390/en15197002.
[8] O.V. Bukunova, A.S. Bukunov, Tools of Data Transmission at Building
and design decision-making, construction progress monitoring, con Information Modeling, 2019/03//, IEEE, 2019, https://doi.org/10.1109/
struction safety, construction waste management, and monitoring asset EastConf.2019.8725373.
operation and maintenance. Findings also indicated that research on BC [9] Y. Celik, I. Petri, M. Barati, Blockchain supported BIM data provenance for
construction projects, Computers in Industry 144 (2023) 103768, https://doi.
for building lifecycle activities focused on using BC for planning and org/10.1016/j.compind.2022.103768.
design collaboration, document management, quality management, [10] Y. Celik, I. Petri, Y. Rezgui, Leveraging BIM and Blockchain for Digital Twins,
construction safety information management, tracking operation and 2021/06//, Institute of Electrical and Electronics Engineers Inc., 2021, https://
doi.org/10.1109/ICE/ITMC52061.2021.9570246.
maintenance costs, and coordination of facility management services. [11] A. Cerić, Reducing information asymmetry and building trust in projects using
Based on the unique features of DT and BC technologies, the authors blockchain technology, Gradjevinar 73 (2021) 967–978, https://doi.org/
posit the potential for the collaborative use of DT and BC within the 10.14256/JCE.3310.2021.
[12] Z. Chen, L. Huang, Digital twin in circular economy: remanufacturing in
AEC-FM industry to enhance building lifecycle management. The com construction, IOP Conference Series: Earth and Environmental Science 588
plementary nature of DT and BC could tackle critical issues regarding (2020) 032014, https://doi.org/10.1088/1755-1315/588/3/032014.
stakeholder collaboration and information fragmentation within the [13] M. Cheng, G. Liu, Y. Xu, M. Chi, When blockchain meets the aec industry: Present
status, benefits, challenges, and future research opportunities 11, 2021, p. 340,
AEC-FM industry.
https://doi.org/10.3390/buildings11080340.
Following the identified knowledge, context, and gaps regarding the [14] Z. Chevallier, B. Finance, B.C. Boulakia, A reference architecture for smart
role of DT and BC, the authors argue a justification for further multi building digital twin, in: SeDiT@ ESWC, 2020, 2020 [5 January 2023]; Available
disciplinary research to contribute to advancing such emerging tech from, https://ceur-ws.org/Vol-2615/paper2.pdf.
[15] S. Cho, M. Khan, J. Pyeon, C. Park, Blockchain-based network concept model for
nologies within the AEC-FM industry. Future work on combined DT and reliable and accessible fine dust management system at construction sites,
BC applications throughout a building’s lifecycle may focus on gathering Applied Sciences 11 (2021) 8686, https://doi.org/10.3390/app11188686.
empirical evidence that supports a deeper understanding and adoption [16] C. Chronopoulos, K.W. Johansen, J. Teizer, C. Schultz, L. Esterle, Towards a
Holistic, Self-Organised Safety Framework for Construction, 2021/09//, IEEE,
of these emerging technologies in the AEC-FM industry. 2021, https://doi.org/10.1109/ACSOS-C52956.2021.00060.
This paper is deemed useful for academics and practitioners to spot [17] V. Ciotta, G. Mariniello, D. Asprone, A. Botta, G. Manfredi, Integration of
gaps or recognise the literature landscape on DT and BC. This study blockchains and smart contracts into construction information flows: proof-of-
concept, Automation in Construction 132 (2021) 103925, https://doi.org/
contributes valuable insights for practitioners in the AEC-FM industry 10.1016/j.autcon.2021.103925.
and empowers decision-makers to grasp the significance of a DT-BC [18] Z. Dakhli, Z. Lafhaj, A. Mossman, The potential of blockchain in building
approach and predict its outcomes. Additionally, it serves as a construction, Buildings 9 (2019) 77, https://doi.org/10.3390/buildings9040077.
[19] M. Darabseh, J.P. Martins, Risks and opportunities for reforming construction
comprehensive guide for those seeking to comprehend the potential of with blockchain: bibliometric study, Civil Engineering Journal (Iran) 6 (2020)
these emerging technologies and their integration and develop practical 1204–1217, https://doi.org/10.28991/cej-2020-03091541.
strategies for their adoption and implementation. [20] M. Das, H. Luo, J.C.P. Cheng, Securing interim payments in construction projects
through a blockchain-based framework, Automation in Construction 118 (2020)
103284, https://doi.org/10.1016/j.autcon.2020.103284.
Declaration of Competing Interest [21] M. Das, X. Tao, Y. Liu, J.C.P. Cheng, A blockchain-based integrated document
management framework for construction applications, Automation in
Construction 133 (2022) 104001, https://doi.org/10.1016/j.
The authors declare that they have no known competing financial autcon.2021.104001.
interests or personal relationships that could have appeared to influence [22] D. Denyer, D. Tranfield, Producing a systematic review, in: D.A. Buchanan,
A. Bryman (Eds.), The SAGE Handbook of Organizational Research Methods, Sage
the work reported in this paper. Publications Ltd, Los Angeles, 2009. ISBN: 9781412931182.
[23] G.M. Di Giuda, P.E. Giana, G. Pattini, The shortening and the automation of
Data availability payments: The potentiality of smart contract in the aeco sector, 2020, https://doi.
org/10.14455/ISEC.2020.7(2).CON-12.
[24] A. Donkers, B. De Vries, D. Yang, Knowledge Discovery Approach to Understand
No data was used for the research described in the article. Occupant Experience in Cross-Domain Semantic Digital Twins [5 January 2023];
Available from, https://linkedbuildingdata.net/ldac2022/files/papers/paper07.
pdf, 2022.
Acknowledgement [25] T. Dounas, W. Jabi, D. Lombardi, Smart Contracts for Decentralised Building
Information Modelling, 2020, pp. 565–574. ISBN: 2684-1843.
This paper contains research which is part of the lead author’s [26] T. Dounas, D. Lombardi, A CAD-Blockchain Integration Strategy for Distributed
Validated Digital Design Connecting the Blockchain, 2018.[28 December 2022];
ongoing PhD research project, partially funded by Teesside University. Available from, https://rgu-repository.worktribe.com/output/229638, 2018.
Additionally, the enhancement of the methodologies and the framework [27] T. Dounas, D. Lombardi, W. Jabi, Towards Blockchains for architectural design
presented in this research was supported by the Chung-Ang University Consensus mechanisms for collaboration in BIM, 2019/12//, Editora Blucher, São
Paulo, 2019, https://doi.org/10.5151/proceedings-ecaadesigradi2019_296.
International Research Grants in 2022.
[28] T. Dounas, D. Lombardi, W. Jabi, Framework for decentralised architectural
design BIM and Blockchain integration, International Journal of Architectural
References Computing 19 (2021) 157–173, https://doi.org/10.1177/1478077120963376.
[29] V. Dudhee, V. Vukovic, Building information model visualisation in augmented
reality, Smart and Sustainable Built Environment (2021), https://doi.org/
[1] P. Adu, A Step- by- Step Guide to Qualitative Data Coding, Routledge, New York,
10.1108/SASBE-02-2021-0021 ahead-of-print(ahead-of-print).
2019. ISBN: 9781138486850.
[30] T.S. Elbashbishy, G.G. Ali, I.H. El-Adaway, Role of transactional blockchain in
[2] A. Agrawal, M. Fischer, V. Singh, Digital twin: from concept to practice, Journal
facilitating procurement in international construction projects, Lecture Notes in
of Management in Engineering 38 (2022), https://doi.org/10.1061/(ASCE)
Civil Engineering 251 (2023) 583–596, https://doi.org/10.1007/978-981-19-
ME.1943-5479.0001034.
1029-6_44/TABLES/1.
[3] S. Ahmadisheykhsarmast, R. Sonmez, A smart contract system for security of
[31] F. Elghaish, S. Abrishami, M.R. Hosseini, Integrated project delivery with
payment of construction contracts, Automation in Construction 120 (2020)
blockchain: An automated financial system, Automation in Construction 114
103401, https://doi.org/10.1016/j.autcon.2020.103401.
(2020) 103182, https://doi.org/10.1016/j.autcon.2020.103182.
[4] S. Alizadehsalehi, I. Yitmen, Digital twin-based progress monitoring management
[32] F. Elghaish, F. Pour Rahimian, M.R. Hosseini, D. Edwards, M. Shelbourn,
model through reality capture to extended reality technologies (DRX), Smart and
Financial management of construction projects: Hyperledger fabric and
Sustainable Built Environment (2021), https://doi.org/10.1108/SASBE-01-2021-
chaincode solutions, Automation in Construction 137 (2022) 104185, https://
0016.
doi.org/10.1016/j.autcon.2022.104185.
[5] N.M. Aziz, N. Zainon, Driving factors for lean-BIM implementation in Malaysia’s
[33] K. Figueiredo, A.W.A. Hammad, A. Haddad, V.W.Y. Tam, Assessing the usability
construction industry: qualitative interview-based study, Smart and Sustainable
of blockchain for sustainability: extending key themes to the construction
Built Environment (2022), https://doi.org/10.1108/sasbe-01-2022-0019.
12
N.A.N. Adu-Amankwa et al. Automation in Construction 155 (2023) 105064
industry, Journal of Cleaner Production 343 (2022) 131047, https://doi.org/ [58] M. Kamari, Y. Ham, AI-based risk assessment for construction site disaster
10.1016/j.jclepro.2022.131047. preparedness through deep learning-based digital twinning, Automation in
[34] P. Gardner, M. Dal Borgo, V. Ruffini, Y. Zhu, A. Hughes, Towards the Construction 134 (2022) 104091, https://doi.org/10.1016/J.
Development of a Digital Twin for Structural Dynamics Applications, Springer, AUTCON.2021.104091.
2020, pp. 165–179. ISBN: 9783030487782. [59] K. Kang, X. Liu, Y. Jiang, K.K.H. Lee, S.K.W. Wan, G.Q. Huang, R.Y. Zhong,
[35] K.C. Goh, T.Y. Teoh, H.H. Goh, K. Bilal, C.S. Chai, Blockchain potentials in Blockchain opportunities for construction industry in Hong Kong: a case study of
enhancing construction stakeholders collaboration, Malaysian Construction RISC and site diary, Construction Innovation (2022), https://doi.org/10.1108/CI-
Research Journal 7 (2) (2019) 177–194 [29 Decemcer 2022]; Available from, 08-2021-0153.
https://expert.taylors.edu.my/file/rems/publication/105958_6710_1.pdf#page [60] E.W. Kim, M.S. Park, K. Kim, K.J. Kim, Blockchain-based automatic tracking and
=190. extracting construction document for claim and dispute support, KSCE Journal of
[36] X. Gong, X. Tao, M. Das, Y. Liu, J. Cheng, Blockchain-based E-tendering Civil Engineering 26 (2022) 3707–3724, https://doi.org/10.1007/S12205-022-
evaluation framework, International Journal of Automation & Digital 2181-Z/METRICS.
Transformation 1 (2022) 75–93, https://doi.org/10.54878/IJADT.131. [61] W.-G. Kim, N. Ham, J.-J. Kim, Enhanced subcontractors allocation for apartment
[37] D. Gough, S. Oliver, J. Thomas, An Introduction to Systematic Reviews, SAGE construction project applying conceptual 4D digital twin framework,
Publications Ltd, London, 2012. ISBN: 9781849201803. Sustainability 13 (2021) 11784, https://doi.org/10.3390/su132111784.
[38] M.J. Grant, A. Booth, A typology of reviews: an analysis of 14 review types and [62] M.S. Kiu, K.W. Lai, F.C. Chia, P.F. Wong, Blockchain integration into electronic
associated methodologies, Health Information and Libraries Journal 26 (2009) document management (EDM) system in construction common data
91–108, https://doi.org/10.1111/j.1471–1842.2009.00848.x. environment, Smart and Sustainable Built Environment (2022), https://doi.org/
[39] J. Grübel, M. Gath-Morad, L. Aguilar, T. Thrash, R.W. Sumner, C. Hölscher, 10.1108/SASBE-12-2021-0231 ahead-of-print.
V. Schinazi, Fused Twins: A Cognitive Approach to Augmented Reality Media [63] S. Koltsios, N. Katsaros, N. Mpouzianas, P. Klonis, G. Giannopoulos, I. Pastaltzidis,
Architecture, 2021/06//, ACM, New York, NY, USA, 2021, https://doi.org/ P. Chatzipanagiotidou, E. Klumbvte, A. Jurelionis, L. Seduikvte, P.-Z. Georgali,
10.1145/3469410.3469435. P. Fokaides, D. Ioannidis, D. Tzovaras, Digital Twin application on next-
[40] H.G. Gunasekara, P. Sridarran, D. Rajaratnam, Effective use of blockchain generation Building Energy Performance Certification scheme, 2022/09//, IEEE,
technology for facilities management procurement process, Journal of Facilities 2022, https://doi.org/10.1109/ISC255366.2022.9921821.
Management 20 (2022) 452–468, https://doi.org/10.1108/JFM-10-2020-0077. [64] M. Kor, I. Yitmen, S. Alizadehsalehi, An investigation for integration of deep
[41] P. Guo, R. Xiong, G. Yu, P. Gong, F. Xiong, W. Ren, CPAS: A Copyright-Protected learning and digital twins towards Construction 4.0, Smart and Sustainable Built
Autonomous Sharing Scheme by Blockchain and Smart Contract for BIM Data, Environment (2022), https://doi.org/10.1108/SASBE-08-2021-0148 ahead-of-p.
2022/04//, IEEE, 2022, https://doi.org/10.1109/ [65] A. Kumar Singh, V.R.P. Kumar, G. Dehdasht, S.R. Mohandes, P. Manu, F. Pour
ICCCBDA55098.2022.9778918. Rahimian, Investigating the barriers to the adoption of blockchain technology in
[42] H. Hamledari, M. Fischer, Construction payment automation using blockchain- sustainable construction projects, Journal of Cleaner Production 403 (2023),
enabled smart contracts and robotic reality capture technologies, Automation in 136840, https://doi.org/10.1016/j.jclepro.2023.136840.
Construction 132 (2021) 103926, https://doi.org/10.1016/j. [66] D. Lee, S.H. Lee, N. Masoud, M.S. Krishnan, V.C. Li, Integrated digital twin and
autcon.2021.103926. blockchain framework to support accountable information sharing in
[43] H. Hamledari, M. Fischer, Measuring the impact of blockchain and smart construction projects, Automation in Construction 127 (2021) 103688, https://
contracts on construction supply chain visibility, Advanced Engineering doi.org/10.1016/j.autcon.2021.103688.
Informatics 50 (2021) 101444, https://doi.org/10.1016/J.AEI.2021.101444. [67] B. Li, R.O. Nielsen, K.W. Johansen, J. Teizer, P.G. Larsen, C. Schultz, Towards
[44] A. Harichandran, K.W. Johansen, E.L. Jacobsen, J. Teizer, A Conceptual digital twins for knowledge-driven construction progress and predictive safety
Framework for Construction Safety Training using Dynamic Virtual Reality analysis on a construction site, in: Lecture Notes in Computer Science (including
Games and Digital Twins, 2021/11//, 2021, https://doi.org/10.22260/ subseries Lecture Notes in Artificial Intelligence and Lecture Notes in
ISARC2021/0084. Bioinformatics) 12479, LNCS, 2021, pp. 153–174, https://doi.org/10.1007/978-
[45] J. Heaton, A.K. Parlikad, Asset information model to support the adoption of a 3-030-83723-5_11/TABLES/1.
Digital Twin: West Cambridge case study, IFAC-PapersOnLine 53 (2020) [68] J. Li, D. Greenwood, M. Kassem, Blockchain in the built environment and
366–371, https://doi.org/10.1016/j.ifacol.2020.11.059. construction industry: a systematic review, conceptual models and practical use
[46] B. Hellenborn, O. Eliasson, I. Yitmen, H. Sadri, Asset information requirements cases, Automation in Construction 102 (2019) 288–307, https://doi.org/
for blockchain-based digital twins: a data-driven predictive analytics perspective, 10.1016/j.autcon.2019.02.005.
Smart and Sustainable Built Environment (2023), https://doi.org/10.1108/sasbe- [69] J. Li, J. Wang, W. Ji, Y. Yu, C. Chen, Construction Project Quality and Safety
08-2022-0183. Management System Based on Blockchain Technology, 2022/10//, IEEE, 2022,
[47] A.A. Hijazi, S. Perera, R.N. Calheiros, A. Alashwal, A data model for integrating https://doi.org/10.1109/PHM-Yantai55411.2022.9941755.
BIM and blockchain to enable a single source of truth for the construction supply [70] W. Li, P. Duan, J. Su, The effectiveness of project management construction with
chain data delivery, Engineering Construction and Architectural Management data mining and blockchain consensus, Journal of Ambient Intelligence and
(2022), https://doi.org/10.1108/ECAM-03-2022-0209. Humanized Computing 1 (2021) 1–10, https://doi.org/10.1007/S12652-020-
[48] H.H. Hosamo, H.K. Nielsen, A.N. Alnmr, P.R. Svennevig, K. Svidt, A review of the 02668-7/TABLES/4.
Digital Twin technology for fault detection in buildings, Frontiers in Built [71] J.R. Lin, D.P. Wu, An approach to twinning and mining collaborative network of
Environment 8 (2022) 1013196, https://doi.org/10.3389/fbuil.2022.1013196. construction projects, Automation in Construction 125 (2021) 103643, https://
[49] H.H. Hosamo, P.R. Svennevig, K. Svidt, D. Han, H.K. Nielsen, A Digital Twin doi.org/10.1016/j.autcon.2021.103643.
predictive maintenance framework of air handling units based on automatic fault [72] Y.-H. Lin, S.P. Ho, H.-K. Wang, W.-C. Hsu, Application of Blockchain in
detection and diagnostics, Energy and Buildings 261 (2022) 111988, https://doi. Construction Inspection Activities, 2021/01//, ACM, New York, NY, USA, 2021,
org/10.1016/j.enbuild.2022.111988. https://doi.org/10.1145/3448734.3450479.
[50] M.R. Hosseini, J. Jupp, E. Papadonikolaki, T. Mumford, W. Joske, B. Nikmehr, [73] Y.-W. Lin, T.L.E. Tang, C.J. Spanos, Hybrid Approach for Digital Twins in the
Position paper: digital engineering and building information modelling in Built Environment, 2021/06//, ACM, New York, NY, USA, 2021, https://doi.org/
Australia, Smart and Sustainable Built Environment 10 (2021) 331–344, https:// 10.1145/3447555.3466585.
doi.org/10.1108/sasbe-10-2020-0154. [74] Liu, Jiang, Osmani, Demian, Building information management (BIM) and
[51] Y. Huang, A. Hammad, G. Torabi, A. Ghelmani, M. Guevremont, Towards Near blockchain (BC) for sustainable building design information management
Real-time Digital Twins of Construction Sites: Developing High-LOD 4D framework, Electronics 8 (2019) 724, https://doi.org/10.3390/
Simulation Based on Computer Vision and RTLS, 2021, https://doi.org/ electronics8070724.
10.22260/ISARC2021/0036. [75] Y. Liu, Y. Sun, A. Yang, J. Gao, Digital twin-based ecogreen building design,
[52] J.J. Hunhevicz, T. Schraner, D.M. Hall, Incentivizing High-Quality Data Sets in Complexity (2021), https://doi.org/10.1155/2021/1391184.
Construction Using Blockchain: A Feasibility Study in the Swiss Industry, 2020/ [76] Z. Liu, G. Shi, Z. Jiao, L. Zhao, Intelligent safety assessment of prestressed steel
10//, 2020, https://doi.org/10.22260/ISARC2020/0177. structures Based on digital twins, Symmetry 13 (2021) 1927, https://doi.org/
[53] R. Ibrahim, A.A. Harby, M.S. Nashwan, A. Elhakeem, Financial contract 10.3390/sym13101927.
administration in construction via cryptocurrency blockchain and smart contract: [77] Z. Liu, G. Shi, J. Qin, X. Wang, J. Sun, Prestressed steel material-allocation path
a proof of concept, Buildings 12 (2022) 1072, https://doi.org/10.3390/ and construction using intelligent digital twins, Metals 12 (2022) 631, https://
buildings12081072. doi.org/10.3390/met12040631.
[54] E. J Adwan, A. Al-Soufi, A review of ICT technology in construction, International [78] Z. Liu, T. Wu, F. Wang, M. Osmani, P. Demian, Blockchain enhanced construction
Journal of Managing Information Technology 8 (2016) 01–21, https://doi.org/ waste information management: a conceptual framework, Sustainability 14
10.5121/ijmit.2016.8401. (2022) 12145, https://doi.org/10.3390/su141912145.
[55] H. Jiang, L. Yun, B. Li, Framework for Blockchain-enabled building information [79] Q. Lu, X. Xie, A.K. Parlikad, J.M. Schooling, E. Konstantinou, Moving from
modeling, in: Lecture Notes in Networks and Systems 438, LNNS, 2022, building information models to digital twins for operation and maintenance,
pp. 832–842, https://doi.org/10.1007/978-3-030-98012-2_58/FIGURES/10. Proceedings of the Institution of Civil Engineers - Smart Infrastructure and
[56] Y. Jiang, Intelligent building construction management based on BIM Digital Construction 174 (2021) 46–56, https://doi.org/10.1680/jsmic.19.00011.
Twin, Computational Intelligence and Neuroscience 2021 (2021) 1–11, https:// [80] W. Lu, L. Wu, R. Zhao, X. Li, F. Xue, Blockchain technology for governmental
doi.org/10.1155/2021/4979249. supervision of construction work: learning from digital currency electronic
[57] M. Kamari, Y. Ham, Semantic detection of potential wind-borne debris in payment systems, Journal of Construction Engineering and Management 147
construction jobsites: digital twining for hurricane preparedness and jobsite (2021) 04021122, https://doi.org/10.1061/(ASCE)CO.1943-7862.0002148.
safety, Computing in Civil Engineering 2021 (2021) 902–909, https://doi.org/
10.1061/9780784483893.111.
13
N.A.N. Adu-Amankwa et al. Automation in Construction 155 (2023) 105064
[81] H. Luo, M. Das, J. Wang, J.C.P. Cheng, Construction Payment Automation [104] A. Raslan, G. Kapogiannis, A. Cheshmehzangi, W. Tizani, D. Towey, Blockchain:
through Smart Contract-based Blockchain Framework, 2019/05//, 2019, https:// Future Facilitator of Asset Information Modelling and Management?, 2020/07//
doi.org/10.22260/ISARC2019/0168. IEEE, 2020 https://doi.org/10.1109/COMPSAC48688.2020.0-199.
[82] N. Luo, M. Pritoni, T. Hong, An overview of data tools for representing and [105] A. Raslan, G. Kapogiannis, A. Cheshmehzangi, W. Tizani, D. Towey, A Framework
managing building information and performance data, Renewable and for Assembling Asset Information Models (AIMs) through Permissioned
Sustainable Energy Reviews 147 (2021) 111224, https://doi.org/10.1016/J. Blockchain, 2020/07//, IEEE, 2020, https://doi.org/10.1109/
RSER.2021.111224. COMPSAC48688.2020.0-198.
[83] S. Matarneh, F. Elghaish, F.P. Rahimian, N. Dawood, D. Edwards, Automated and [106] K.S.D. Ravi, M.S. Ng, J. Medina Ibáñez, D.M. Hall, Real-time Digital Twin of
interconnected facility management system: an open IFC cloud-based BIM Robotic construction processes in Mixed Reality, 2021/11//, 2021, https://doi.
solution, Automation in Construction 143 (2022) 104569, https://doi.org/ org/10.22260/ISARC2021/0062.
10.1016/J.AUTCON.2022.104569. [107] Riba, The RIBA Plan of Work 2020, RIBA Publishing, 2020 [18 December 2022];
[84] J. Mcgowan, M. Sampson, D.M. Salzwedel, E. Cogo, V. Foerster, C. Lefebvre, Available from, https://www.architecture.com/knowledge-and-resources/resour
PRESS peer review of electronic search strategies: 2015 guideline statement, ces-landing-page/riba-plan-of-work.
Journal of Clinical Epidemiology 75 (2016) 40–46, https://doi.org/10.1016/j. [108] M.N.N. Rodrigo, S. Perera, S. Senaratne, X. Jin, Potential application of
jclinepi.2016.01.021. blockchain technology for embodied carbon estimating in construction supply
[85] S. Meschini, L.C. Tagliabue, G.M. Di Giuda, Leveraging Digital Twins to Enhance chains, Buildings 10 (2020) 140, https://doi.org/10.3390/BUILDINGS10080140.
Green Public Procurement in AECO Industry. 2022 [28 December 2022]; [109] G. Ryzhakova, O. Malykhina, V. Pokolenko, O. Rubtsova, O. Homenko,
Available from, https://ceur-ws.org/Vol-3285/paper2.pdf, 2022. I. Nesterenko, T. Honcharenko, Construction project management with digital
[86] L. Messi, A. Corneli, M. Vaccarini, A. Carbonari, Development of a Twin Model for twin information system, International Journal of Emerging Technology and
Real-time Detection of Fall Hazards, 2020/10//, 2020, https://doi.org/ Advanced Engineering 12 (2022) 19–28, https://doi.org/10.46338/ijetae1022_
10.22260/ISARC2020/0037. 03.
[87] C. Miller, M. Abdelrahman, A. Chong, F. Biljecki, M. Quintana, M. Frei, M. Chew, [110] R. Sacks, I. Brilakis, E. Pikas, H.S. Xie, M. Girolami, Construction with digital twin
D. Wong, The internet-of-buildings (IoB) — digital twin convergence of wearable information systems, Data-Centric Engineering 1 (2020) e14, https://doi.org/
and IoT data with GIS/BIM, Journal of Physics Conference Series 2042 (2021) 10.1017/dce.2020.16.
012041, https://doi.org/10.1088/1742-6596/2042/1/012041. [111] H. Sadri, I. Yitmen, L.C. Tagliabue, F. Westphal, A. Tezel, A. Taheri, G. Sibenik,
[88] A. Mohammed, A. Almousa, A. Ghaithan, L.A. Hadidi, The role of blockchain in Integration of blockchain and digital twins in the smart built environment
improving the processes and workflows in construction projects, Applied Sciences adopting disruptive technologies—a systematic review, Sustainability 15 (2023)
11 (2021) 8835, https://doi.org/10.3390/app11198835. 3713, https://doi.org/10.3390/su15043713.
[89] S. Nanayakkara, S. Perera, S. Senaratne, G.T. Weerasuriya, H.M.N.D. Bandara, [112] M. Saygili, I.E. Mert, O.B. Tokdemir, A decentralized structure to reduce and
Blockchain and smart contracts: a solution for payment issues in construction resolve construction disputes in a hybrid blockchain network, Automation in
supply chains, Informatics 8 (2021) 36, https://doi.org/10.3390/ Construction 134 (2022) 104056, https://doi.org/10.1016/J.
informatics8020036. AUTCON.2021.104056.
[90] N. Nawari, S. Ravindran, Blockchain and building information modeling (BIM): [113] D.J. Scott, T. Broyd, L. Ma, Exploratory literature review of blockchain in the
review and applications in post-disaster recovery, Buildings 9 (2019) 149, construction industry, Automation in Construction 132 (2021), https://doi.org/
https://doi.org/10.3390/buildings9060149. 10.1016/j.autcon.2021.103914.
[91] N.O. Nawari, S. Ravindran, Blockchain and the built environment: potentials and [114] M. Shahzad, M.T. Shafiq, D. Douglas, M. Kassem, Digital twins in built
limitations, Journal of Building Engineering 25 (2019), https://doi.org/10.1016/ environments: an investigation of the characteristics, applications, and
j.jobe.2019.100832. challenges, Buildings 12 (2022) 120, https://doi.org/10.3390/
[92] C. Newman, D. Edwards, I. Martek, J. Lai, W.D. Thwala, I. Rillie, Industry 4.0 buildings12020120.
deployment in the construction industry: a bibliometric literature review and UK- [115] M.G. Sharma, S. Kumar, The implication of blockchain as a disruptive technology
based case study, Smart and Sustainable Built Environment 10 (2021) 557–580, for construction industry, IIM Kozhikode Society & Management Review 9 (2020)
https://doi.org/10.1108/sasbe-02-2020-0016. 177–188, https://doi.org/10.1177/2277975220932343.
[93] Y. Ni, B. Sun, Y. Wang, Blockchain-based BIM digital project management [116] K. Shen, L. Ding, C. Wang, Development of a framework to support whole-life-
mechanism research, IEEE Access 9 (2021) 161342–161351, https://doi.org/ cycle net-zero-carbon buildings through integration of building information
10.1109/ACCESS.2021.3130270. modelling and digital twins, Buildings 12 (2022) 1747, https://doi.org/10.3390/
[94] O. Olugboyega, D.J. Edwards, A.O. Windapo, E.D. Omopariola, I. Martek, buildings12101747.
Development of a conceptual model for evaluating the success of BIM-based [117] D. Sheng, L. Ding, B. Zhong, P.E.D. Love, H. Luo, J. Chen, Construction quality
construction projects, Smart and Sustainable Built Environment 10 (4) (2021) information management with blockchains, Automation in Construction 120
681–701, https://doi.org/10.1108/sasbe-02-2020-0013. (2020) 103373, https://doi.org/10.1016/j.autcon.2020.103373.
[95] D.-G.J. Opoku, S. Perera, R. Osei-Kyei, M. Rashidi, Digital twin application in the [118] A. Shojaei, I. Flood, H.I. Moud, M. Hatami, X. Zhang, in: K. Arai, R. Bhatia,
construction industry: a literature review, Journal of Building Engineering 40 S. Kapoor (Eds.), An Implementation of Smart Contracts by Integrating BIM and
(2021) 102726, https://doi.org/10.1016/j.jobe.2021.102726. Blockchain, Springer International Publishing, 2020, https://doi.org/10.1007/
[96] D.G.J. Opoku, S. Perera, R. Osei-Kyei, M. Rashidi, T. Famakinwa, K. Bamdad, 978-3-030-32523-7_36.
Drivers for digital twin adoption in the construction industry: a systematic [119] K. Sigalov, X. Ye, M. König, P. Hagedorn, F. Blum, B. Severin, M. Hettmer,
literature review, Buildings 12 (2022) 113, https://doi.org/10.3390/ P. Hückinghaus, J. Wölkerling, D. Groß, Automated payment and contract
buildings12020113. management in the construction industry by integrating building information
[97] M.J. Page, J.E. Mckenzie, P.M. Bossuyt, I. Boutron, T.C. Hoffmann, C.D. Mulrow, modeling and blockchain-based smart contracts, Applied Sciences 11 (2021)
L. Shamseer, J.M. Tetzlaff, E.A. Akl, S.E. Brennan, R. Chou, J. Glanville, J. 7653, https://doi.org/10.3390/APP11167653.
M. Grimshaw, A. Hróbjartsson, M.M. Lalu, T. Li, E.W. Loder, E. Mayo-Wilson, [120] R. Sonmez, S. Ahmadisheykhsarmast, A.A. Güngör, BIM integrated smart contract
S. Mcdonald, L.A. Mcguinness, L.A. Stewart, J. Thomas, A.C. Tricco, V.A. Welch, for construction project progress payment administration, Automation in
P. Whiting, D. Moher, The PRISMA 2020 statement: an updated guideline for Construction 139 (2022) 104294, https://doi.org/10.1016/J.
reporting systematic reviews, BMJ 372 (2021), https://doi.org/10.1136/BMJ. AUTCON.2022.104294.
N71. [121] H. Sun, Z. Liu, Research on intelligent dispatching system management platform
[98] Y. Pan, L. Zhang, A BIM-data mining integrated digital twin framework for for construction projects based on digital twin and BIM technology, Advances in
advanced project management, Automation in Construction 124 (2021), https:// Civil Engineering 2022 (2022) 1–9, https://doi.org/10.1155/2022/8273451.
doi.org/10.1016/j.autcon.2021.103564. [122] L.C. Tagliabue, F.R. Cecconi, S. Maltese, S. Rinaldi, A.L.C. Ciribini, A. Flammini,
[99] C. Panteli, A. Kylili, P.A. Fokaides, Building information modelling applications in Leveraging digital twin for sustainability assessment of an educational building,
smart buildings: from design to commissioning and beyond a critical review, Sustainability 13 (2021) 480, https://doi.org/10.3390/su13020480.
Journal of Cleaner Production 265 (2020) 121766, https://doi.org/10.1016/j. [123] A. Talla, S. McIlwaine, Industry 4.0 and the circular economy: using design-stage
jclepro.2020.121766. digital technology to reduce construction waste, Smart and Sustainable Built
[100] P. Pishdad-Bozorgi, J.H. Yoon, Transformational approach to subcontractor Environment (2022), https://doi.org/10.1108/sasbe-03-2022-0050.
selection using blockchain-enabled smart contract as trust-enhancing technology, [124] X. Tao, Y. Liu, P.K.Y. Wong, K. Chen, M. Das, J.C.P. Cheng, Confidentiality-
Automation in Construction 142 (2022), https://doi.org/10.1016/J. minded framework for blockchain-based BIM design collaboration, Automation in
AUTCON.2022.104538. Construction 136 (2022) 104172, https://doi.org/10.1016/j.
[101] B. Putz, M. Dietz, P. Empl, G. Pernul, EtherTwin: Blockchain-based secure digital autcon.2022.104172.
twin information management, Information Processing and Management 58 [125] C. Tedjo, M.A. Berawi, M. Sari, Development of Blockchain and Machine Learning
(2021) 102425, https://doi.org/10.1016/j.ipm.2020.102425. System in the Process of Construction Planning Method of the Smart Building to
[102] H.N. Rafsanjani, A.H. Nabizadeh, Towards digital architecture, engineering, and Save Cost and Time, Springer Science and Business Media Deutschland GmbH,
construction (AEC) industry through virtual design and construction (VDC) and 2023, pp. 833–842. ISBN: 9789811693472.
digital twin, Energy and Built Environment (2021), https://doi.org/10.1016/j. [126] B. Teisserenc, S.M.E. Sepasgozar, Software architecture and non-fungible tokens
enbenv.2021.10.004. for digital twin decentralized applications in the built environment, Buildings 12
[103] A.S. Rao, M. Radanovic, Y. Liu, S. Hu, Y. Fang, K. Khoshelham, M. Palaniswami, (2022) 1447, https://doi.org/10.3390/buildings12091447.
T. Ngo, Real-time monitoring of construction sites: sensors, methods, and [127] J. Teizer, K.W. Johansen, C. Schultz, The Concept of Digital Twin for Construction
applications, Automation in Construction 136 (2022), 104099, https://doi.org/ Safety, American Society of Civil Engineers, 2022, https://doi.org/10.1061/
10.1016/j.autcon.2021.104099. 9780784483961.121.
14
N.A.N. Adu-Amankwa et al. Automation in Construction 155 (2023) 105064
[128] A. Tiwari, U. Batra, Blockchain enabled reparations in smart buildings-cyber [141] I. Yitmen, S. Alizadehsalehi, İ. Akıner, M.E. Akıner, An adapted model of
physical system, Defence Science Journal 71 (2021) 491–498, https://doi.org/ cognitive digital twins for building lifecycle management, Applied Sciences 11
10.14429/dsj.71.16454. (2021) 4276, https://doi.org/10.3390/app11094276.
[129] J.A. Torrecilla-García, M.C. Pardo-Ferreira, J.C. Rubio-Romero, Overall [142] J. Zhang, J.C.P. Cheng, W. Chen, K. Chen, Digital twins for construction sites:
introduction to the framework of BIM-based digital twinning in decision-making concepts, LoD definition, and applications, Journal of Management in
in safety management in building construction industry, Dirección y Organización Engineering 38 (2022), https://doi.org/10.1061/(ASCE)ME.1943-5479.0000948.
74 (2021) 31–38, https://doi.org/10.37610/dyo.v0i74.600. [143] Y. Zhang, A. Meina, X. Lin, K. Zhang, Z. Xu, Digital twin in computational design
[130] H. Tran, T.N. Nguyen, P. Christopher, D.-K. Bui, K. Khoshelham, T.D. Ngo, and robotic construction of wooden architecture, Advances in Civil Engineering
A digital twin approach for geometric quality assessment of as-built prefabricated 2021 (2021), https://doi.org/10.1155/2021/8898997.
façades, Journal of Building Engineering 41 (2021) 102377, https://doi.org/ [144] Y. Zhang, T. Wang, K.V. Yuen, Construction site information decentralized
10.1016/j.jobe.2021.102377. management using blockchain and smart contracts, Computer-Aided Civil and
[131] C. Udokwu, A. Norta, C. Wenna, Designing a Collaborative Construction-Project Infrastructure Engineering 37 (2022) 1450–1467, https://doi.org/10.1111/
Platform on Blockchain Technology for Transparency, Traceability, and MICE.12804.
Information Symmetry, 2021/02//, ACM, New York, NY, USA, 2021, https://doi. [145] J. Zhao, H. Feng, Q. Chen, B. Garcia De Soto, Developing a conceptual framework
org/10.1145/3456126.3456134. for the application of digital twin technologies to revamp building operation and
[132] W. Van Groesen, P. Pauwels, Tracking prefabricated assets and compliance using maintenance processes, Journal of Building Engineering 49 (2022) 104028,
quick response (QR) codes, blockchain and smart contract technology, https://doi.org/10.1016/j.jobe.2022.104028.
Automation in Construction 141 (2022), 104420, https://doi.org/10.1016/j. [146] L. Zhao, H. Zhang, Q. Wang, H. Wang, Digital-twin-based evaluation of nearly
autcon.2022.104420. zero-energy building for existing buildings based on scan-to-BIM, Advances in
[133] Q.L. Vivi, A.K. Parlikad, P. Woodall, G.D. Ranasinghe, J. Heaton, Developing a Civil Engineering 2021 (2021) 1–11, https://doi.org/10.1155/2021/6638897.
dynamic digital twin at a building level: Using Cambridge campus as case study, [147] Y. Zhao, N. Wang, Z. Liu, E. Mu, Construction theory for a building intelligent
in: International Conference on Smart Infrastructure and Construction 2019, operation and maintenance system based on digital twins and machine learning,
ICSIC 2019: Driving Data-Informed Decision-Making, 2019, pp. 67–75, https:// Buildings 12 (2022) 87, https://doi.org/10.3390/buildings12020087.
doi.org/10.1680/ICSIC.64669.067/ASSET/IMAGES/SMALL/ICSIC.64669.067. [148] R. Zheng, J. Jiang, X. Hao, W. Ren, F. Xiong, Y. Ren, bcBIM: a blockchain-based
F6.GIF. big data model for BIM modification audit and provenance in mobile cloud,
[134] T. Wang, V.J.L. Gan, D. Hu, H. Liu, Digital twin-enabled built environment Mathematical Problems in Engineering 2019 (2019) 1–13, https://doi.org/
sensing and monitoring through semantic enrichment of BIM with SensorML, 10.1155/2019/5349538.
Automation in Construction 144 (2022) 104625, https://doi.org/10.1016/j. [149] B. Zhong, J. Guo, L. Zhang, H. Wu, H. Li, Y. Wang, A blockchain-based framework
autcon.2022.104625. for on-site construction environmental monitoring: proof of concept, Building and
[135] X. Wang, S.M. Asce, C.-J. Liang, C.C. Menassa, M. Asce, V.R. Kamat, Interactive Environment 217 (2022) 109064, https://doi.org/10.1016/j.
and Immersive Process-Level Digital Twin for Collaborative Human-Robot buildenv.2022.109064.
Construction Work, 2021, https://doi.org/10.1061/(ASCE)CP.1943- [150] B. Zhong, H. Wu, L. Ding, H. Luo, Y. Luo, X. Pan, Hyperledger fabric-based
5487.0000988. consortium blockchain for construction quality information management,
[136] H. Wu, B. Zhong, H. Li, J. Guo, Y. Wang, On-site construction quality inspection Frontiers of Engineering Management 7 (2020) 512–527, https://doi.org/
using blockchain and smart contracts, Journal of Management in Engineering 37 10.1007/s42524-020-0128-y.
(2021) 04021065, https://doi.org/10.1061/(asce)me.1943-5479.0000967. [151] J. Zhou, Information construction of construction project management based on
[137] S. Wu, L. Hou, G. Zhang, H. Chen, Real-time mixed reality-based visual warning internet of things blockchain, Security and Privacy 6 (2023), https://doi.org/
for construction workforce safety, Automation in Construction 139 (2022) 10.1002/spy2.221.
104252, https://doi.org/10.1016/J.AUTCON.2022.104252. [152] L. Zhou, C. An, J. Shi, Z. Lv, H. Liang, Design and Construction Integration
[138] H. Xie, M. Xin, C. Lu, J. Xu, Knowledge map and forecast of digital twin in the Technology Based on Digital Twin, 2021/08//, IEEE, 2021, https://doi.org/
construction industry: state-of-the-art review using scientometric analysis, 10.1109/PSGEC51302.2021.9541682.
Journal of Cleaner Production 383 (2023), 135231, https://doi.org/10.1016/j. [153] Y. Zhou, X. Wei, Y. Peng, The modelling of digital twins technology in the
jclepro.2022.135231. construction process of prefabricated buildings, Advances in Civil Engineering
[139] X. Xie, Q. Lu, A.K. Parlikad, J.M. Schooling, Digital twin enabled asset anomaly (2021) 1–11, https://doi.org/10.1155/2021/2801557.
detection for building facility management, IFAC-PapersOnLine 53 (2020) [154] L. Zhu, M. Shan, Z. Xu, Critical review of building handover-related research in
380–385, https://doi.org/10.1016/j.ifacol.2020.11.061. construction and facility management journals, Engineering Construction and
[140] X. Ye, K. Sigalov, M. König, Integrating bim-A nd cost-included information Architectural Management 28 (2021) 154–173, https://doi.org/10.1108/ECAM-
container with blockchain for construction automated payment using billing 10-2018-0442.
model and smart contracts, in: Proceedings of the 37th International Symposium [155] F.P. Rahimian, J.S. Goulding, S. Abrishami, S. Seyedzadeh, F. Elghaish, in:
on Automation and Robotics in Construction, ISARC 2020: From Demonstration Industry 4.0 solutions for building design and construction: a paradigm of new
to Practical Use - To New Stage of Construction Robot, 2020, pp. 1388–1395, opportunities. Routledge, Routledge, 2021, ISBN 9780367618780.
https://doi.org/10.22260/isarc2020/0192. [156] Goulding, S. Jack, in: Farzad Pour Rahimian, eds. Offsite production and
manufacturing for innovative construction: People, process and technology,
Routledge, 2019, ISBN 9781138550711.