WMS ITB〔2018〕NO.030 ITB For Bridge Construction

Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

[在此处键入]

CHINA PETROLEUM PIPELINE ENGINEERING


COMPANY LIMITED

TENDER DOCUMENT
INVITATION TO BID (ITB)

For

Bridge Construction

FOR
EPCC OF WATER MANAGEMENT SYSTEM (PHASE I)
AT GARRAF OIL FIELD

TENDER NUMBER:
[在此处键入]

TABLE OF CONTENTS

LETTER OF INVITATION TO BID

ATTACHMENT 1 Acknowledgement and Confirmation Letter

ATTACHMENT 2 Technical proposal

ATTACHMENT 3 Commercial proposal

ATTACHMENT 4 SCOPE OF WORK


Service And Patrol Road Construction

WMS ITB〔2018〕NO.029

LETTER OF INIVITATION TO BID

Tender Center
To
All Bidders From China Petroleum Pipeline Engineering
Company Limited

Tender Title: Bridge Construction

Tender Number: WMS ITB〔2018〕NO.030

Dear Sirs,

China Petroleum Pipeline Engineering Company Limited (hereinafter referred to as “CPP”) is currently
awarded the project EPCC OF WATER MANAGEMENT SYSTEM (PHASE I) AT GARRAF OIL FIELD. Hereby,
CPP is pleased to invite your company to submit a sealed Bid for the above-mentioned Tender

Your Bid submission shall be strictly in accordance with the following attached Invitation to Bid (ITB)
documents:

 Attachment 1 Acknowledge and Confirmation letter


 Attachment 2 Technical Proposal
 Attachment 3 Commercial Proposal
 Attachment 4 Scope of Work

All costs incurred in preparing and submitting your Bid including presentations and site visits (if required) shall
be solely at your own expense and will not be reimbursed by CPP under any circumstances.

Furthermore, CPP shall not be responsible for any loss and/or delay in delivering your proposals. CPP
reserves the right to reject any or all Bidders or select Bidder(s) of its choice without assigning any reason.

Your electronic bids should be submitted to the following encrypt email address:

yanweilitender@163.com

OR you can delivered your sealed BIDS to our office located in: floor 6, building NO.2, EMMAR BUSINESS
PARK, THE GREENS, DUBAI.
Bids shall be submitted in no event later than the closing time (Local Time in Dubai, the Bid Closing Time &
Date): Late bids will be rejected.
Please acknowledge receipt by advising via formal email of your interest to offer your proposal within two (2)
days upon receipt of this invitation. Please see the details in:

ITB for Garraf Water management System Phase 1 page 1 /5


Service And Patrol Road Construction

WMS ITB〔2018〕NO.029

ATTACHMENT I ACKNOWLEDGMENT AND CONFIRMATION LETTER FORM.

IMPORTANT NOTE:

1. Acknowledgment, clarifications, and other information about ITB shall be sent to email address:
yanweili@cppmde.com or lijiaqi@cppmde.com

2. Electronic Bid in attachment 2 Commercial Proposal is strictly required to submit to the following
encrypt email address:

yanweilitender@163.com

Those bids sent to other email address shall be rejected and deemed as invalid.

OR is strictly required to submit to CPP’s Iraqi office, whose address is


CPP WMS CAMP, GARRAF OIL FIELD, Thi Qar province, IRAQ, with sealed
quotation documents.

3. Bidder shall read these instructions to bidders carefully and submit proposal in strict compliance
with the instruction contained herein. Failure of which shall render bidder’s proposal disqualified
from further consideration.

Best Regards

Tender Center

China Petroleum Pipeline Engineering Company Limited

ITB for Garraf Water management System Phase 1 page 2 /5


Service And Patrol Road Construction

WMS ITB〔2018〕NO.029

INSTUCTIONS TO BIDDERS

ITB for Garraf Water management System Phase 1 page 3 /5


Service And Patrol Road Construction

WMS ITB〔2018〕NO.029

1. PROJECT INTRODUCTION

1.1 Development and Production Service Contract (DPSC) for the Garraf Contract Area (GCA) was
signed between South Oil Company (SOC), PETRONAS Carigali Sdn. Bhd, Japan Petroleum
Exploration Co. Ltd (JAPEX) and North Oil Company (NOC) on 18th January 2010, and was made
effective on 10th February 2010. Under the DPSC, PETRONAS Carigali Sdn. Bhd. was appointed
as the Operator.
1.2 Garraf FDP will include additional oil production trains, gas processing facilities, water
management facilities, pipelines, wells, wellpads and other associated facilities in order to achieve
and sustain the PPT.
1.3 As part of the Garraf FDP to improve recovery, water injection is required for Mishrif formation for
pressure maintenance by January 2017 with initial capacity of 200,000 BW PD and will progressively
be increased to maximum capacity of 750,000 BWPD in 2030. The water for the injection will be
sourced from the combination of produced water and make-up water from Third River since
produced water from Garraf production is not sufficient during the earlier days. Continuous water
injection is crucial in order to sustain the PPT.
1.4 The Third River is a man-made river. It is located approximately 28 km from Garraf Integrated
Facilities Terminal (GIFT). The water quality is predominantly saline with various agricultural
discharges routed in the river. Third River is technically referred as Main Outfall Drain (MOD),
designed to move saline agricultural runoffs to sea and to minimize the pollution of Tigris and
Euphrates River. The Third River water intake facilities will be developed based on the
injection water requirement and produced water availability.

2. BID CURRENCY

Bidder is required to submit the Bid in USD ONLY. Other currencies will NOT be acceptable.

3. LICENSING

Bidder shall obtain and submit copies of all necessary consents, permits, licenses, approvals,
authorizations, executions and/or waivers which prove his ability to perform and deliver such
goods and services within Iraq.

4. BID PRICE

4.1 BIDDER shall quote an all-inclusive, non-escalating, fixed unit price from purchasing the material
till delivery on site or from the service beginning to the end of it..
4.2 The unit price shall be quoted strictly following the format as per attachment 2 provided by CPP,
and such price shall include all the 3.3% Iraqi withholding tax which maybe adjustable by Iraqi
government in future

4.3 Once awarded, the Lump Sum Price, Unit Rate Contract Price and the Schedule of Rates shall
prevail throughout the duration of the CONTRACT.

ITB for Garraf Water management System Phase 1 page 4 /5


Service And Patrol Road Construction

WMS ITB〔2018〕NO.029

5. CLARIFICATIONS

CPP shall be entitled to seek clarifications after submission of Bids. Bidder submitting a Bid failing to
comply with these instructions to Bidder including, but not limited to, an unclear or ambiguous Bid or a
Bid containing inconsistencies or deviations, or submitted after the Bid closing date, bears the risk of
being rejected without further opportunity to make amendments.

6. MODIFICATION BY CPP

CPP reserves the right to modify the ITB Documents following issue of the same to the Bidder.
Any modification to the ITB Documents made by CPP shall be advised to Bidder not later than five (5)
calendar days prior to the Bid closing date. Any modification shall be issued as invitation to bid supplements
(Tender Bulletin and/or addendum) and shall be deemed to constitute part of the ITB Documents. Where
any actual conflict exists between the addenda, the addendum subsequent in time shall govern. Bidder
shall include into its BID the cost of all work included in the addenda issued.

7. CONFIDENTIALITY OF BID

By submission of a Bid, Bidder warrants that:

7.1 All documents delivered to Bidder shall be handled CONFIDENTIALLY and shall be used only
for the purpose of preparing the Bid. Such documents shall not be duplicated or disclosed to
others unless explicitly for the purpose of formulating the Bid in response to this invitation to Bid;

7.2 The prices in the Bid have been arrived at independently, without consultation, communication,
agreement or understanding for the purpose of restricting competition, as to any matter relating
to such prices, with any other bidders or with any competitors;

7.3 The prices which have been quoted in the Bid have not knowingly been disclosed by Bidder,
directly or indirectly, to any other bidders or competitors, nor will they be so disclosed;

7.4 No attempt has been made or will be made by Bidder to induce any other person or company to
submit or not to submit a Bid for the purpose of restricting competition; and

7.5 Bidder has adhered to the highest standards of business ethics and, in particular, has
established precautions to prevent any of its officers, employees, or agents from making, receiving
or offering substantial gifts, entertainment, payment, loans, or other considerations which may
influence individuals in respect of this invitation to Bid.

8. VALIDITY OF BID

8.1 Bidder’s BID shall be binding and shall remain valid, irrevocable and remain open for
acceptance by CPP for one hundred and twenty (120) days after the CLOSING DATE.
Withdrawal of any statement, terms and conditions or prices in the BID during this period will
result in the BID being rejected.

8.2 In exceptional circumstances, prior to the expiry of the original bid validity period, CPP may
request the Bidder to extend the period of validity. The request and the responses thereto shall
be made in writing.

ITB for Garraf Water management System Phase 1 page 5 /5


TENDER NO.: M-G502-515084-ITB-S rvice-039