Version 7.2.

PVsyst - Simulation report


Grid-Connected System

Project: Achmad Bakir Pasaman


Variant: Achmad Bakir Pasaman
No 3D scene defined, no shadings
System power: 7.70 kWp
Villa Cinere Mas, Jl. Neptunus 3 No.7 RT003 RW012 - Indonesia

Author
Project: Achmad Bakir Pasaman
Variant: Achmad Bakir Pasaman

PVsyst V7.2.8
VC0, Simulation date:
02/03/23 14:49
with v7.2.8

Project summary
Geographical Site Situation Project settings
Latitude
Villa Cinere Mas, Jl. Neptunus 3 No.7 RT003 RW012 -6.32 °S Albedo 0.20
Indonesia Longitude 106.78 °E
Altitude 46 m
Time zone UTC+7

Meteo data
Villa Cinere Mas, Jl. Neptunus 3 No.7 RT003 RW012
Meteonorm 8.0 (2010-2014), Sat=100% - Synthetic

System summary
Grid-Connected System No 3D scene defined, no shadings
Simulation for year no 25

PV Field Orientation Near Shadings User's needs


Fixed plane No Shadings Unlimited load (grid)
Tilt/Azimuth 20 / 0 °

System information
PV Array Inverters
Nb. of modules 14 units Nb. of units 1 Unit
Pnom total 7.70 kWp Pnom total 10.00 kWac
Pnom ratio 0.770

Results summary
Produced Energy 10.69 MWh/year Specific production 1389 kWh/kWp/year Perf. Ratio PR 80.17 %

Table of contents
Project and results summary 2
General parameters, PV Array Characteristics, System losses 3
Main results 5
Loss diagram 6
Special graphs 7

02/03/23 PVsyst Licensed to Page 2/7


Project: Achmad Bakir Pasaman
Variant: Achmad Bakir Pasaman

PVsyst V7.2.8
VC0, Simulation date:
02/03/23 14:49
with v7.2.8

General parameters
Grid-Connected System No 3D scene defined, no shadings

PV Field Orientation
Orientation Sheds configuration Models used
Fixed plane No 3D scene defined Transposition Perez
Tilt/Azimuth 20 / 0 ° Diffuse Perez, Meteonorm
Circumsolar separate

Horizon Near Shadings User's needs


Free Horizon No Shadings Unlimited load (grid)

PV Array Characteristics
PV module Inverter
Manufacturer Jinkosolar Manufacturer Deye
Model JKM550M-72HL4-V Model Deye SUN-10K-G03
(Custom parameters definition) (Custom parameters definition)
Unit Nom. Power 550 Wp Unit Nom. Power 10.00 kWac
Number of PV modules 14 units Number of inverters 1 unit
Nominal (STC) 7.70 kWp Total power 10.0 kWac
Modules 1 String x 14 In series Operating voltage 120-850 V
At operating cond. (50°C) Pnom ratio (DC:AC) 0.77
Pmpp 7.04 kWp
U mpp 524 V
I mpp 13 A

Total PV power Total inverter power


Nominal (STC) 8 kWp Total power 10 kWac
Total 14 modules Nb. of inverters 1 Unit
Module area 36.1 m² Pnom ratio 0.77
Cell area 33.3 m²

Array losses
Array Soiling Losses Thermal Loss factor DC wiring losses
Loss Fraction 3.0 % Module temperature according to irradiance Global array res. 188 mΩ
Uc (const) 20.0 W/m²K Loss Fraction 0.4 % at STC
Uv (wind) 0.0 W/m²K/m/s

Module Quality Loss Module mismatch losses Strings Mismatch loss


Loss Fraction -0.8 % Loss Fraction 2.0 % at MPP Loss Fraction 0.1 %

Module average degradation


Year no 25
Loss factor 0.02 %/year
Mismatch due to degradation
Imp RMS dispersion 0.4 %/year
Vmp RMS dispersion 0.4 %/year

IAM loss factor


Incidence effect (IAM): User defined profile

0° 30° 50° 60° 70° 75° 80° 85° 90°


1.000 1.000 1.000 0.999 0.988 0.965 0.925 0.743 0.000

02/03/23 PVsyst Licensed to Page 3/7


Project: Achmad Bakir Pasaman
Variant: Achmad Bakir Pasaman

PVsyst V7.2.8
VC0, Simulation date:
02/03/23 14:49
with v7.2.8

AC wiring losses
Inv. output line up to injection point
Inverter voltage 230 Vac tri
Loss Fraction 0.32 % at STC
Inverter: Deye SUN-10K-G03
Wire section (1 Inv.) Copper 1 x 3 x 3 mm²
Wires length 3m

02/03/23 PVsyst Licensed to Page 4/7


Project: Achmad Bakir Pasaman
Variant: Achmad Bakir Pasaman

PVsyst V7.2.8
VC0, Simulation date:
02/03/23 14:49
with v7.2.8

Main results
System Production
Produced Energy 10.69 MWh/year Specific production 1389 kWh/kWp/year
Performance Ratio PR 80.17 %

Normalized productions (per installed kWp) Performance Ratio PR

Balances and main results

GlobHor DiffHor T_Amb GlobInc GlobEff EArray E_Grid PR


kWh/m² kWh/m² °C kWh/m² kWh/m² MWh MWh ratio
January 123.5 82.77 25.53 110.1 106.1 0.708 0.684 0.807
February 137.7 78.07 25.39 126.5 122.1 0.808 0.784 0.805
March 142.0 81.19 25.86 139.0 134.3 0.882 0.856 0.800
April 144.6 79.37 25.92 151.0 146.0 0.956 0.931 0.801
May 140.7 74.33 26.48 154.6 149.5 0.976 0.950 0.798
June 138.2 70.63 25.76 156.1 151.0 0.991 0.965 0.803
July 148.8 68.99 25.72 167.1 161.8 1.056 1.028 0.799
August 155.8 79.31 25.95 166.8 161.4 1.053 1.025 0.798
September 157.3 83.97 25.83 157.8 152.5 0.998 0.972 0.800
October 168.1 96.23 26.49 159.3 153.9 1.008 0.981 0.800
November 140.8 85.16 25.84 126.4 122.0 0.808 0.785 0.806
December 134.6 86.21 25.83 117.9 113.6 0.757 0.733 0.808
Year 1732.1 966.25 25.89 1732.5 1674.3 11.000 10.695 0.802

Legends
GlobHor Global horizontal irradiation EArray Effective energy at the output of the array
DiffHor Horizontal diffuse irradiation E_Grid Energy injected into grid
T_Amb Ambient Temperature PR Performance Ratio
GlobInc Global incident in coll. plane
GlobEff Effective Global, corr. for IAM and shadings

02/03/23 PVsyst Licensed to Page 5/7


Project: Achmad Bakir Pasaman
Variant: Achmad Bakir Pasaman

PVsyst V7.2.8
VC0, Simulation date:
02/03/23 14:49
with v7.2.8

Loss diagram
1732 kWh/m² Global horizontal irradiation
+0.0% Global incident in coll. plane

-0.37% IAM factor on global

-3.00% Soiling loss factor

1674 kWh/m² * 36 m² coll. Effective irradiation on collectors

efficiency at STC = 21.34% PV conversion

12.90 MWh Array nominal energy (at STC effic.)


-0.54% Module Degradation Loss ( for year #25)
-0.19% PV loss due to irradiance level

-8.61% PV loss due to temperature

+0.75% Module quality loss

-6.45% Mismatch loss, modules and strings


(including 4.4% for degradation dispersion

-0.28% Ohmic wiring loss


11.00 MWh Array virtual energy at MPP

-2.57% Inverter Loss during operation (efficiency)

0.00% Inverter Loss over nominal inv. power


0.00% Inverter Loss due to max. input current
0.00% Inverter Loss over nominal inv. voltage
-0.01% Inverter Loss due to power threshold
0.00% Inverter Loss due to voltage threshold
-0.04% Night consumption
10.71 MWh Available Energy at Inverter Output

-0.16% AC ohmic loss


10.69 MWh Energy injected into grid

02/03/23 PVsyst Licensed to Page 6/7


Project: Achmad Bakir Pasaman
Variant: Achmad Bakir Pasaman

PVsyst V7.2.8
VC0, Simulation date:
02/03/23 14:49
with v7.2.8

Special graphs
Daily Input/Output diagram

System Output Power Distribution

02/03/23 PVsyst Licensed to Page 7/7