First Fix Working Standards and Completed Projects in Saudi Arabia

Download as pdf or txt
Download as pdf or txt
You are on page 1of 86

COMPANY PROFILE ‘24

w w w. f i r s t f i x - k s a . c o m
INDEX

ABOUT US ........................................................... 03

MARKET SECTORS .......................................... 10

SERVICES ............................................................. 12

HEALTH & SAFETY ........................................... 29

OUR TEAM ........................................................... 31

OUR CLIENTS ..................................................... 33

PROJECT REFERENCES ................................ 37

OUR VALUE PROPOSITIONS ...................... 119

2
ABOUT FIRST FIX

First Fix is a local market dealer delivering world class projects via end to end solutions that provide integrated design, engineering
and construction disciplines of mechanical, electrical & plumbing (MEP) through people, innovation and passion.
CO M PA N Y P R O F I L E / A B O U T U S

ABOUT US

Established in +11000 +190 ARAMCO


2015 Employees Awarded Projects Awarded Projects

Saudi Electric Company Civil Defense Approved ISO 45001 : 2018, ISO 14001 : 2015
Approved Contractor For Fire Protection & Fire Alarm Services ISO 9001 : 2015 Certified

4
CO M PA N Y P R O F I L E / A B O U T U S

MISSION & VISION

Mission : Providing world class services for our current & future clients.

Vision : Become the leading contractor in the GCC by exceeding every


expectation; through innovation, sustainability and excellence.

5
CO M PA N Y P R O F I L E / A B O U T U S

CORE VALUES

Relationships
Sustainability
Building long term relationships with our
Solving environmental challenges
clients, suppliers, team members and
to serve our communities and
partners through trust, commitment,
protect our world.
collaboration and respect.
Innovation Excellence
Anticipating challenges and coming We aspire to be the best in everythingwe
up with best smart solutions tailored do. No matter how urgent or challenging
specifically for each project. the job is, our team is the best and they are
ready for any challenge.

6
‫‪CO M PA N Y P R O F I L E / A B O U T U S‬‬

‫‪FIRST FIX CLASSIFICATION‬‬

‫ﺷﺮﻛﺔ ﺍﻟﺘﺮﻛﻴﺒﺎﺕ ﺍﻻﻭﻟﻴﺔ ﻟﻼﻋﻤﺎﻝ ﺍﻟﻜﻬﺮﺑﺎﺋﻴﺔ ﺍﻟﻤﺤﺪﻭﺩﺓ‬

‫‪100000.0‬‬ ‫ﺳﻌﻮﺩﻱ‬ ‫ﺫﺍﺕ ﻣﺴﺌﻮﻟﻴﺔ ﻣﺤﺪﻭﺩﺓ ﻣﺨﺘﻠﻄﺔ‬ ‫ﻣﺤﻤﺪ ﺻﺎﻟﺢ ﻣﺤﻤﺪ ﺑﻦ ﻻﺩﻥ‬ ‫‪03/12/2014‬‬ ‫‪4030279152‬‬

‫‪77.125‬‬ ‫‪BBB+‬‬ ‫ﻛﺒﻴﺮﺓ‬ ‫‪12/01/2021‬‬ ‫‪20210062‬‬

‫ﺟﻤﻊ ﺍﻟﻤﻴﺎﻩ ‪,‬ﺗﻨﻘﻴﺔ ﺍﻟﻤﻴﺎﻩ ‪,‬ﺗﺤﻠﻴﺔ ﺍﻟﻤﻴﺎﻩ‪,‬ﻧﻘﻞ ﻭﺗﻮﺯﻳﻊ ﺍﻟﻤﻴﺎﻩ‪,‬ﺍﻟﺘﺨﻠﺺ ﻣﻦ ﻣﻴﺎﻩ ﺍﻟﻤﺠﺎﺭﻱ ‪,‬ﺍﻹﻧﺸﺎﺀﺍﺕ ﺍﻟﻌﺎﻣﺔ ﻟﻠﻤﺒﺎﻧﻲ ﺍﻟﺴﻜﻨﻴﺔ‪,‬ﺍﻹﻧﺸﺎﺀﺍﺕ ﺍﻟﻌﺎﻣﺔ ﻟﻠﻤﺒﺎﻧﻲ ﺍﻟﻐﻴﺮ ﺍﻟﺴﻜﻨﻴﺔ ‪ ،‬ﻳﺸﻤﻞ ‪,‬‬
‫)ﺍﻟﻤﺪﺍﺭﺱ ‪ ،‬ﺍﻟﻤﺴﺘﺸﻔﻴﺎﺕ‪ ،‬ﺍﻟﻔﻨﺎﺩﻕ ‪...‬ﺍﻟﺦ(ﺇﻧﺸﺎﺀ ﺍﻟﻤﻄﺎﺭﺍﺕ ﻭﻣﺮﺍﻓﻘﻬﺎ‬ ‫ﺍﻟﺘﺸﻴﻴﺪ ﻭﺍﻟﺒﻨﺎﺀ‬

‫‪12/01/2025‬‬

‫‪7‬‬
CO M PA N Y P R O F I L E / A B O U T U S

OUR GROUP COMPANIES

8
CO M PA N Y P R O F I L E / A B O U T U S

OUR OFFICES

JEDDAH HEAD OFFICE RIYADH OFFICE KHOBAR OFFICE


PO Box 117188 PO Box No-57967, Riyadh 12474 3rd Floor, Somou Tower 4300,
Jeddah 21391, KSA Prince Sultan Bin AbdulAziz Rd, Prince Turkey Street,
Riyadh, KSA Al Yarmouk, Al Khobar 34423

9
MARKET SECTORS
CO M PA N Y P R O F I L E / M A R K E T S E C T O R S

MARKET SECTORS

EDUCATION SMART
AVIATION FACILITIES GOVERNMENT ENERGY CITIES UTILITIES

MEDICAL SUSTAINABLE
FACILITIES BUILDINGS RESIDENTIAL EVENTS PORTS INDUSTRIAL

HIGH-RISE
PETROCHEMICAL INFRASTRUCTURE TELECOM RETAIL BUILDINGS OIL & GAS

STADUIMS TRANSPORTATION

11
OUR SERVICES

PRE-CONSTRUCTION SERVICES
Design Reviews I Design Proficiencies I Value Engineering

CONSTRUCTION SERVICES
Construction Management I Skill Staffing & Training I Programs I Quality Control I Commissioning and Hand Over
CO M PA N Y P R O F I L E / O U R S E R VI C E S

PRE-CONSTRUCTION

First Fix engineers are committed to developing engineering solutions to meet our Design review focuses on:
client’s most complex requirements. Engineering disciplines include: mechanical,
electrical, piping, BMS and automation engineering.

First Fix reviews, highlights, addresses and resolves issues in early design process (final
design & issued for construction design stage) for an efficient design & smooth handling Build Maintain Function

construction program.

13
CO M PA N Y P R O F I L E / O U R S E R VI C E S

VALUE ENGINEERING

First Fix through its close communication loop between its estimators, project managers and field execution staff will evaluate
each facility systems and components.

Clients tend to seek First Fix value engineering options for its direct / positive impact project’s goals and objectives.

Value engineering practice includes:

Formulating and administering maintenance plans


Predicting spending flows
Recommending on cost limits and making budgets
Instructing on Cash Flow Projecting
Recommending on Life Cycle costing
Cost benefits Examination & Planning
Assessing altering design

14
CO M PA N Y P R O F I L E / O U R S E R VI C E S

CONSTRUCTION

ELECTRICAL MECHANICAL PLUMBING CIVIL INFRASTRUCTURE BIM FIT-OUT & INTERIOR

LOW CURRENT WORKS CONTROL & AUTOMATION MODULAR, PRE-FABRICATED & AIRPORTS WATER TREATMENT
PRE-ENGINEERED BUILDINGS

15
CO M PA N Y P R O F I L E / O U R S E R VI C E S

ELECTRICAL WORKS

MV / LV containment (conduits and raceways) UPS & Central Battery System (CBS)
MV / LV cable laying and termination Power Monitoring Systems
MV / LV panel boards, MCC erection and termination Lighting Control Systems
MV switch gear, pocket stations, RMUs Programmable Logic Controls (PLC) and SCADA
Power distribution systems Fire Detection and Alarm Systems
Street lighting and decorative lighting Earthing Networks & Lightning Protection

16
CO M PA N Y P R O F I L E / O U R S E R VI C E S

MECHANICAL WORKS

Air conditioning systems including chillers, AHUs, FCUs, ducts


Duct insulation & cladding
Splits and package units
Building automation and control
Central heating / cooling
Hot water
Refrigeration
Ventilation / air treatment

17
CO M PA N Y P R O F I L E / O U R S E R VI C E S

PLUMBING WORKS

Experts in all types of plumbing, drainage, process and sanitary fixing works
PVC, PPR, COPPER, Steel, Cast Iron, HDPE, Multi-layer and high pressure line pipe works
Equipment Installation
Pump Rooms
Clean – Agent Fire Suppression Systems
Fire Fighting Network
All types of saunas, jacuzzi and swimming pools
Irrigation line works

18
CO M PA N Y P R O F I L E / O U R S E R VI C E S

WATER WORKS

Reverse Osmosis (RO)


Sewage Treatment Plant
Filtration System
Pumping Stations
Water Reservoirs and Tanks
Water Features

19
CO M PA N Y P R O F I L E / O U R S E R VI C E S

CIVIL INFRASTRUCTURE

Shoring Dewatering Walls


Building Structural Elements Columns
Structural Slabs Beams
Excavation Works Mapping underground utilities Applications
Concrete & Steel Rebars Hardscape
Building Foundations Landscape
Piles

20
CO M PA N Y P R O F I L E / O U R S E R VI C E S

PRE-FABRICATED BUILDINGS

Modular Construction is a process in which a building is constructed Advantages Of


off-site, under controlled plant conditions, using the same materials and Pre-Fabricated Buildings
designing to the same codes and standards as conventionally built facilities
FASTER
– but in about half the time. Buildings are produced in “modules” that when
Construction of modular buildings occurs simultaneously with site work,
put together on site, reflect the identical design intent and specifications
allowing projects to be completed in half the time of traditional construction.
of the most sophisticated site-built facility – without compromise.
SMARTER
Modular buildings are built with the same materials and to the same
Temporary Prefabricated Structures building codes and architectural specifications as traditional construction.
Types Of Hybrid Prefab Systems Once assembled, they are virtually indistinguishable from their site-built
Prefabricated Open Sided Modules counterparts.
Buildings GRC Modular
GREENER
Precast Concrete
The factory-controlled process generates less waste, creates fewer site
disturbances and allows for tighter construction.
21
JUBAIL : P.O. Box 1531, Jubail 31951, Jubail, Kingdom of Saudi Arabia
PRE-FABRICATED BUILDINGS - OUR FACTORY YARD DUBAI : P.O. Box 17365, Jebel Ali Free Zone, Dubai, United Arab Emirates
CO M PA N Y P R O F I L E / O U R S E R VI C E S

PRE-ENGINEERED STEEL BUILDINGS

Pre-engineered metal buildings (PEMBs) are structures made f rom prefabricated parts that are
assembled on site.
Advantages Of
PEMBs are made up of three main parts: the primary framing (which includes the roof panels Pre-Engineered Metal Buildings
and wall panels), the secondary framing (which supports the primary f raming), and the metal
cladding (which covers the outside of the building). The primary f raming is usually made out of Cost-Efficient
steel, while the secondary framing and cladding can be made out of either steel or aluminum. Time Savings
Reliability And Durability
Types Of Buildings That Can Be Pre-Engineered Customizability
Community and recreational centers Sustainability
Warehouses
Barns and agricultural housing facilities
Industrial and commercial buildings
Garages, workshops, and recreational storage facilities
Storage facilities
Data mining facilities

23
CO M PA N Y P R O F I L E / O U R S E R VI C E S

BIM

BIM Capabilities
We utilize three-dimensional building information modeling (BIM) programs early in the design process to enable greater
pre-visualization of conceptual design elements and spatial relationships. With BIM, all members of a design team—including
architects, MEP/FP engineers, structural engineers, civil engineers, cost estimators, and contractors—speak the same
language with a single model to which each discipline contributes their specific knowledge. Each three-dimensional model
contains essential data regarding not only the building’s design, but also that of the building’s performance capabilities,
logistics, and constructibility.

We have found that combining the BIM programs Autodesk Revit and Navisworks in the construction documents phase
helps us identify and correct potential problems among the different design and engineering disciplines early on, creating
more coordinated documents and a smoother construction process. As contractors continue to shift toward practices rooted
entirely in BIM, our ability to provide a quality model is a valuable tool to help our clients save time and money.

BIM is the next generation in documentation for architects. As such, we want to make sure we maximize the software’s
capabilities in order to deliver the highest quality documents to our clients. Our BIM Quality Assurance Team comprises
architects with extensive technical experience. It dedicates significant time and measures to instating and reviewing our
BIM standards, as well as leading continuing professional development for the office.

24
CO M PA N Y P R O F I L E / O U R S E R VI C E S

BIM

BIM Deliverables
3D Modeling Architectural, Structural, MEP (LOD 100 to LOD 500)
Coordination and Clash Detection
Clash Resolution
Extraction of Modeled Quantities from the BIM Model
Construction Simulation
As Built Model for facility management
Extraction of shop diagram from the BIM Model
Walkthrough and Rendered images

3D Modeling – Digital model for Easy Reviewing of the project:

To appreciate the key features and value introduced by building information modelling (BIM), it is helpful to look back
at the history of design communication and how building modelling has been used in that process.

Prior to the Renaissance, building designs were documented and communicated using physical models. These models
provided a physical representation of the proposed design that everyone could easily see from many perspectives. To
construct a physical model, design features had to be fully understood and resolved in 3D, so the model served many
purposes—as a design tool, as a building plan, and as a record of the design.

25
CO M PA N Y P R O F I L E / O U R S E R VI C E S

BIM

BIM Workflow

26
CO M PA N Y P R O F I L E / O U R S E R VI C E S

LOW CURRENT WORKS

Information Communication Technology (ICT) Building Controls and Automation Systems


Safety Systems Maritime Technologies
Security Systems Intelligent Transportation Systems
Airport Operation Systems Audio Visual Systems
IOT and Emerging Technologies Air Navigation Systems

27
CO M PA N Y P R O F I L E / O U R S E R VI C E S

INTERIOR DESIGN & FIT OUT

Interior Design Fit Out

Space Planning Flooring Plastering


Conceptual Design False Ceiling Paint Work
Mood Board Production Gypsum Work Glass & Aluminum Work

28
HEALTH & SAFETY

We are committed to protect our people and the contractors and suppliers who support our operations. The presence of a safe
working environment underlies and sustains the performance of our entire workforce.
C O M P A N Y P R O F I L E / H E A LT H & S A F E T Y

HEALTH & SAFETY

We’re compliant with all legislation and are committed to doing all we can to ensure
the health and safety of our employees, sub-contractors and public.

This includes:
Implementation of continuous improvement plans
Bi-annual review of health and safety material by senior team
Site-specific health and safety plans
Regular employee consultation, training and supervision
Employees within the team appointed to positions of responsibility
Identification and management of hazards
Scheduled inspecting and maintenance of machinery and equipment.
Regular safety audits by Health and Safety Manager, Site Supervisors and Directors

30
OUR TEAM
CO M PA N Y P R O F I L E / O U R T E A M

EMPLOYEE SUMMARY

Job Category No. of Employees Job Category No. of Employees

Engineer - Site 288 Supervisor - Civil 13

Engineer / Assistant Manager - Project Support 114 Supervisor -Electrical 112

Engineer / Staff - Contract / Commercial 102 Supervisor - Logistics / Transportation / Other 23

Engineer / Staff - Design / Technical 301 Supervisor - Mechanical 167

Engineer / Staff - Project Management 485 Technical Staff - Project Support 0

Management 12 Trainee 703

Management - Project 52 Workforce - Accommodation / Facility 99

Managers - Department 11 Workforce - Civil 307

Office Staff - Finance 21 Workforce - Electrical 2443

Office Staff - Head Office 313 Workforce - Helpers 850

Office Staff - HR / Admin / Support Service / Marketing 61 Workforce - Logistics / Transportation / Other 344

Office Staff - Logistics / Transportation 110 Workforce - Mechanical 3988

Office Staff - Project Support 98

Total 11017

32
OUR CLIENTS
CO M PA N Y P R O F I L E / O U R C L I E N T S

GOVERNMENT SECTOR

34
CO M PA N Y P R O F I L E / O U R C L I E N T S

SEMI-GOVERNMENT SECTOR

35
CO M PA N Y P R O F I L E / O U R C L I E N T S

PRIVATE SECTOR

36
PROJECT REFERENCE

ONGOING PROJECTS COMPLETED PROJECTS PRE-FABRICATED BUILDING PROJECTS


CO M PA N Y P R O F I L E / P R OJ E C T R E F E R E N C E

RECENTLY AWARDED PROJECTS

King Khalid Intl. Airport King Khalid Intl. Airport Riyadh Airports Company, Amaala Integrative
Cargo Apron Project Duty-free Project for T3 & T4 Irrigation Network Wellness & Retail Village

Amaala Rosewood Shura West Hotel 2 KAFD MEP Enhancement


Hotel and Resort Shura West Hotel 3 Phase 2
Shura West Hotel 4

38
CO M PA N Y P R O F I L E / P R OJ E C T R E F E R E N C E

ONGOING PROJECTS

KKIA Cargo Apron Project KAFD - 16 Parcels Enhancement


KKIA Dutyfree Project T3 & T4 KAFD - General Public Realm and Softscape
KKIA Irrigation Network Hegra Boutique Hotel
Amaala Integrative Wellness & Retail Village Ummahat Alshaykh Hotel #12 - Dry and Wet Services
Amaala Rosewood Hotel & Resort Security Forces Medical Centre, Riyadh
Shura West Hotel 2, 3 & 4 Mall of Saudi
KAFD - MEP Enhancement Phase 2 Jeddah Historical District
King Salman Park - Royal Arts Complex (Enabling Works)
Al Moosa Rehab And LTC Facility, Al Ahsa

39
CO M PA N Y P R O F I L E / O N G O I N G P R OJ E C T S

KKIA DUTYFREE PROJECT T3 & T4

Scope of Work:
Client: Riyadh Airports Co.
Contractor: First Fix Pre-Construction (Design Scope): Execution Phase: Post-Construction:
Feasibility & Commercial Study Construction to RIBA Stage 6 Post Construction Completion

Technical Assessment & Investigation Reporting Construction Supervision Services (excluded Site Handover
f rom the scope of this RFP, new RFP to be issued)
Conceptual Design Close-out documents and As-Built drawings
Testing and Commissioning
Schematic Design
Delivery
Detailed Design

Construction Documents

40
CO M PA N Y P R O F I L E / O N G O I N G P R OJ E C T S

AMAALA INTEGRATIVE WELLNESS & RETAIL VILLAGE

Scope of Work:
Client: Red Sea Global - Amaala
Underground Fire Fighting network, Chilled Water network, Gas (LPG) network, MV and LV System including the switchgear and cabling
Contractor: First Fix
Potable Water network, Secondary Irrigation Network, MV Cables, LV Cables,
Generator and Essential System
BMS and CBS system cabling, Landscaping Lighting, Earthing and Lightning
Epoxy Coating / Waterproofing of any MEP Plinths
Protection system,
Hardscape and Softscape works
HVAC, BMS, Sewerage and storm system, Potable water system
Concrete works and All Plinths/foundations Required for MEP Equipment and
Fire Fighting system, clean agent systems, Foam deluge system
Supports
Secondary/Tertiary Irrigation System, GRMS System
Power and Lighting System, UPS System, Central battery System, Lighting
Spa Equipment and Swimming Pools System, Solar System for Hot Water,
control system
Leak Detection System
All Light fixtures (Internal and External) except FFE light fixtures
BOH Sanitary Ware and fixtures

41
CO M PA N Y P R O F I L E / O N G O I N G P R OJ E C T S

ROSEWOOD AMAALA HOTEL & RESORT

Scope of Work:
Client: Red Sea Global
Concrete works Fire Fighting Pump Room, Fire protection systems such as sprinkler system, Fire
Contractor: First Fix
External Power Cable Ducts for Road Crossings and manholes fighting systems such as hose reel systems, wet risers, landing valves, breeching
inlets., Fire Suppression systems such as FM 200, Mist, Foam deluge, Pre-Action
Underground Potable Water network, vacuum drainage network, chilled water
Systems, Fire extinguishers, Fire Blankets, Spare Sprinklers as required by
network, firefighting network
authorities, Drain Pipework Required for Fire Fighting System to nearest drain
Mechanical systems like Chillers, chilled water pumps, mechanical air
LPG System
conditioning installations, control gear, fire dampers, AHUs, FCUs, ERVs,
Smoke management system, heat exchangers, ventilation for pool plant room All electrical works including Complete MV Substations, Electric substations LV
switchgear and cabling,
Potable Water Plant including Pumps, Tanks.
Energy management systems, Power factor correction equipment, BMS System,
Water Treatment & Filtration Systems, sanitary ware, roof rain water outlets,
fire detection system, all lighting and wiring works, complete emergency
puddle sleeves, drainage provisions, grease traps and interceptors
lighting system
42
CO M PA N Y P R O F I L E / O N G O I N G P R OJ E C T S

KKIA IRRIGATION NETWORK

Scope of Work:
Client: Riyadh Airports Co
Dismantling works Checking, verification and rectification of existing electrical equipment
Contractor: First Fix
Installation of centrifugal pumps Interconnecting pipe work and fittings
Installation of cables Checking and Installation of panels
Installation of panels Installation of air blowers
Installation of fertilizers Installation of backwash tank
Upgrading Maxicom system to the latest version Installation of split ACs
Upgrading the green house automation control System to the latest version External Network
43
CO M PA N Y P R O F I L E / O N G O I N G P R OJ E C T S

SHURA WEST HOTEL 2, 3 & 4

Scope of Work:
Client: Red Sea Global
Contractor: First Fix Engineering, procurement and construction for the below works All water-proofing, sealants for manholes and house connection chambers

Deep drainage sewer Network Tie-ins to Primary Shura sewer Network

All trenching (including dewatering), temporary works and backfill as per Lifting station outside the buildings including mechanical and electrical
specified materials to established platform levels works (inclusive pumps) along with valve assembly, venting provision and BMS

All sewer pipework, all manholes, and house connection chambers bases / lids provision will be also provided to MEP contactor.

inlc. cast in elements All testing including handover to concrete structural contractor / MEP contractor
44
CO M PA N Y P R O F I L E / O N G O I N G P R OJ E C T S

KING SALMAN PARK - ROYAL ARTS COMPLEX

Scope of Work:
Client: KSP
Contractor: MBL The Project is composed of 16 buildings including: Supply and Installation of all MEP and Infrastructure Works:

1. Museum of Civilizations 9. Master craft Studios Wet Services works Execution

2. National Theatres 10. Art Library The MEP (Mechanical, Electrical & Plumbing) works is divided into the following main categories:

3. Performance Arts Academy 11. Cinema Hall plus kiosk Mechanical: The Mechanical installations mainly cover HVAC works.

4. Visual Arts Academy 12. Exhibition Dome Electrical: The Electrical Installations is covering all electrical works, fire alarm system, telephone system,
BMS, low voltage system.
5. Performing Arts and Music Academy 13. Sculpture Pavilion
Plumbing: The Plumbing Installations is covering drainage system, water supply distributions, sanitary
6. Heritage Academy 14. Outdoor Theatre
ware installations and related works.
7. Multi-purpose auditorium dome 15. West Entrance gateway
Fire Fighting System: The firefighting system is covering sprinkler system, firefighting equipment’s, clean
8. Artistic Studios (2 buildings)
agent FM200 system, etc.
45
CO M PA N Y P R O F I L E / O N G O I N G P R OJ E C T S

ALMOOSA REHAB AND LTC FACILITY - AL AHSA

Client: Al Moosa Specialist Hospital Scope of Work:


Contractor: First Fix Supply, Installation, Testing and commissioning of all MEP Works
Engineer: Al Moosa Specialist Hospital inside the three buildings mentioned below:
CUP Building – 3 Floors (Chilled Water Plant )

INPATIENT Building – 16 Floors

OUTPATIENT Building – 4 Floors

46
CO M PA N Y P R O F I L E / O N G O I N G P R OJ E C T S

KING ABDULLAH FINANCIAL DISTRICT - General Public Realm and Softscape Works

Client: KAFD Scope of Work:


Contractor: Firstfix
Supply, Installation of:
Consultant: Seville Engineering
Civil Works Asphalt Work : Sub-Base , Asphalt Layer , Road Marking , Traffic sign .
Consultants
Landscaping works Finish Work : Screed Work ,Water Proofing ,Block Work , Facade Work ,

Irrigation works Handrail.

Plant (Tree , Grass ) . Electrical and Cables supply


47
CO M PA N Y P R O F I L E / O N G O I N G P R OJ E C T S

HEGRA BOUTIQUE HOTEL - AL ULA


Design and Build

Scope of Work:
Client: MBL
Contractor: MBL Supply, Installation, Testing and commissioning of:
Fire Fighting System Power Distribution Works

Plumbing Systems Lighting Fixtures

HVAC Systems External Works

Swimming Pool Works

48
CO M PA N Y P R O F I L E / O N G O I N G P R OJ E C T S

UMMAHAT ALSHAYKH HOTEL #12 - Al WAJH

Scope of Work:
Client: Red Sea Development Company
Contractor: Red Sea Development Company Supply, Installation of MEP works in : Sitewide Infrastructure Building MEP & Testing & Commissioning

Wet Services Works Wet Services works Execution

Offsite Activities (Engineering, Procurement & Manufacturing) Offsite Activities (Engineering, Procurement & Manufacturing)

Overwater Villas Buildings Execution

Beach Villas & Assets CSS Execution

Dry Services Works Spa & Wellness Supply & Installation Execution

Offsite Activities (Engineering, Procurement & Manufacturing) Testing & Commissioning

Overwater Villas Dry Services Works Execution

Beach Villas & Assets Offsite Activities (Engineering, Procurement & Manufacturing)

Buildings Execution
49 Testing & Commissioning
CO M PA N Y P R O F I L E / O N G O I N G P R OJ E C T S

SECURITY FORCES MEDICAL CENTRE - RIYADH

Scope of Work:
Client: Ministry of Interior
Supply and installation of first and second fix items, installation, testing and commissioning of the long lead
Contractor: ABV Rock
equipment supplied by Main contractor
Consultant: Manens - Tifs
All related MEP Works inside Utility Chillers Building

District Cooling System along with all related Inf rastructure works.

First Fix is the lead MEP Contractor coordinating all the activities of MEP Work along side with architecture,
structure and other parties.

50
CO M PA N Y P R O F I L E / P R OJ E C T R E F E R E N C E

COMPLETED PROJECTS

NEOM Base Economy Assets (NC2) Strategic Reservoir, Taif


KAFD Temporary Parking Strategic Tanks Project, Taif
New Jeddah Downtown (JCD) Masharef Project
KKIA - Fire and Water Piping Network KAFD - Pop up Restaurant Project
Boulevard - Hiteen District, Riyadh Medical Village Inf rastructure works, Riyadh
King Abdulaziz International Airport Data Centre, Jeddah Kingdom Tower Project
Abha Regional Airport – Current Terminal Expansion Riyadh Metro Project
NEOM Bay Airport Upgrade Al Salam Palace
Jazan Refinery Utilities Project KAEC Exhibition Centre Fire fighting
Elegance Tower Project, Riyadh VIA Riyadh
King Abdullah Port, Rabigh Misk Foundation
Red Sea Week Event Project Super Dome Jeddah
KAFD Subterranean Road & Utility Tunnels Muvi Cinemas
Ministry of Defense KAFD CP 04b - Baytur
World Defense Show 2022 Saudi Customs Smart Gate Phase 1
King Abdul Aziz Road Development “KAAR” MOD - Renovation of Academy Building No 4 & 5
Upgrade West Pier Facilities - Ras Tanura The Walk - Pump Station for Administration 2 & 3
Jeddah Yacht Club
51
CO M PA N Y P R O F I L E / CO M P L E T E D P R OJ E C T S

NEOM BASE ECONOMY ASSETS (NC2)

Scope of Work:
Client: Neom
Structural works Landscape
Contractor: First Fix
Architectural Infrastructure works
Interior Architecture Security including, but not limited to fencing, monitoring, CCTV
Mechanical works (HVAC, Fire, Plumbing, drainage, fuel handling etc.) Telecommunications
Electrical works Signage
Lighting internal and external works Fire Life Safety and Loss prevention design
IT – WIFI Drainage
52
CO M PA N Y P R O F I L E / CO M P L E T E D P R OJ E C T S

KAFD TEMPORARY PARKING

Scope of Work:
Client: KAFD
Contractor: First Fix Reinstatement of Asphalt Pavement Mechanical Works include but are not limited to Plumbing Works including but are not limited to
Prefab installation with finishes and MEP works drainage, water supply and fire protection
Air Conditioning system (ducting and piping)
Gate barrier installation Ventilation Systems (e.g., for basements, kitchen, toilets) Hard landscape including but not limited paving, and street furniture

Excavation and backfilling including dewatering Smoke Extract System. Pavilions and shading structures
if required Solid Waste and Garbage collection
Structural Works Electrical works Sustainability and green initiatives
Moisture and thermal insulation Ring Main Units (MRMU and RMU) Transportation and Parking Specialty
Civil Engineering Medium Voltage Switch Gear (MVSG) Fire and Life Safety provisions as per Local Authorities’ requirements and
Architectural works regulations
Medium Voltage Panels
Interior floor, wall, and ceiling finishes ELV systems, (e.g., Fire detection and alarm, access control)
Medium Voltage Cables
ICT, IT, Telecom and Security works (if required)

Parking management system

Traffic calming speedbumps, parking designations, and convex mirrors


53 Signage and wayfinding; .
CO M PA N Y P R O F I L E / CO M P L E T E D P R OJ E C T S

NEW JEDDAH DOWNTOWN - JCD

Client: MBL Scope of Work:


Contractor: MBL Supply, Installation, Testing and commissioning of:
Infrastructure works

Mechanical Works including

Buildings, Diversion works and Demolition works

Electrical Works including

Buildings, Diversion works and Substation works

54
CO M PA N Y P R O F I L E / CO M P L E T E D P R OJ E C T S

KING KHALID INTERNATIONAL AIRPORT


Design and Build of New Fire and Water Piping Network

Client: Riyadh Airports Company Scope of Work:


Contractor: First Fix Internal Works (Tunnels) and ExternalWorks: Design and Build Contract of :
Consultant: Egis
Potable water system (pipes, fittings, valves and accessories)

Fire fighting system (pipes, fittings, valves and accessories)

SCADA System

Civil works (trial pits ,utilities detection, radar mapping, concrete works, excavation and backfilling works)

55
CO M PA N Y P R O F I L E / CO M P L E T E D P R OJ E C T S

BOULEVARD EXPANSION - HITEEN DISTRICT, RIYADH

Client: SELA Scope of Work:

Contractor: Khatib and Alami Supply, Installation of:

Drainage network, water network, fire network, irrigation network, water tank and pumps

Civil works

56
CO M PA N Y P R O F I L E / CO M P L E T E D P R OJ E C T S

KING ABDUL AZIZ INTERNATIONAL AIRPORT - DATA CENTRE, JEDDAH

Scope of Work:
Client: General Authority for Civil Aviation (GACA)
Contractor: SBG Full MEP scope for 68 UPS Rooms Communication Pathways HDPE Inner duct, Cable rack support for communication
containment Works manholes
Consultant: Dar Al Handasah
MV Cable pulling at Utility Tunnel Full MEP scope for Communication Rooms (189 Rooms)

Earthing Cabling for MV Network with all related fittings and Cable Ladder installation sizes 300mm & 600mm at Utility Tunnel
accessories Testing & Commissioning of all related works & activities

57
CO M PA N Y P R O F I L E / CO M P L E T E D P R OJ E C T S

ABHA REGIONAL AIRPORT - Current Terminal Expansion

Client: General Authority for Civil Aviation (GACA) Scope of Work:


Contractor: ICAD
Air Handling Units, Ventilation / Exhaust Fans, split units Low voltage cables, races, boxes, fittings, lighting outlets,
Consultants: Dar Al Handasah Ducting, ducting specialties, air outlets switches, sockets

Drainage / Rain-water / Plumbing System UPS for Data Rack

Fire Protection (Sprinklers, FHCs, Fire Extinguishers) Low Voltage Distribution Boards

BMS related to fire fighting works monitoring, HVAC control & Fire Alarm System with all related components CCTV system
monitoring Public Address System
Earthing & Lightning System Electronic Safety & Security System Flight Information Display

58
CO M PA N Y P R O F I L E / CO M P L E T E D P R OJ E C T S

NEOM BAY AIRPORT - Upgrade

Client: General Authority for Civil Aviation (GACA) Scope of Work:


Contractor: Saudi Arabian Baytur
UPS, Batteries & Racks Plumbing System (Plumbing & Drainage Piping, Valves, Sanitary
Consultants: Dar Al Handasah Fixtures, Water Heaters)
Generator with all related accessories MDB, EMDB, SMDB, USMDB,
PP, LP & UPP Solar Panels and Storage Tanks (Water,Fire,Fuel)

LV Cables Oil & Grease Interceptors

Disconnect Switches, Sockets, Electrical Outlet & Floor Boxes Fire fighting Pumps, Fire Hose Cabinets, Sprinkler System

Lighting Fixtures Foam Water Fire Suppression System (Tanks, Pumps, Piping,

Street Lighting Poles & Fixtures, Earthing and Lightening Accessories)

Protections DX–Type Package / Split / CRAC Units


59
CO M PA N Y P R O F I L E / CO M P L E T E D P R OJ E C T S

JAZAN REFINERY UTILITIES - (JRUP) EPC 13

Client: ARAMCO Scope of Work:


Contractor: Consolidated Contractors Company CCC Installation, alignment, hand-over of all electrical equipment such as MV / LV switch gear, MCC, Control
Consultants: ARAMCO & Distribution Panels Bus Cables

MV, LV and control cable pulling, dressing and tagging

LV and control cable glanding, termination and testing


60
CO M PA N Y P R O F I L E / CO M P L E T E D P R OJ E C T S

ELEGANCE TOWER - RIYADH, (MOT HQ)

Client: Ministry of Transport Scope of Work:


Contractor: First Fix Supply and Installation of MEP Systems
Consultants: Dar al Handasah Block works

Demolishing Works

61
CO M PA N Y P R O F I L E / CO M P L E T E D P R OJ E C T S

KING ABDULLAH PORT - RABIGH

Client: Ports Development Company Scope of Work:


Contractor: Huta Marine Supply, Installation, Testing and commissioning of:
Consultant: AECOM Main Substation / Power Plant Control Room Supply & Installation of MV & LV cabling, UPS & status monitoring system

Cabling to switch gear for all 5 Substations Testing & Commissioning of Cables (Hipot Testing)

Full MEP Works for supporting buildings Testing & Commissioning of all related works & activities

62
CO M PA N Y P R O F I L E / CO M P L E T E D P R OJ E C T S

RED SEA WEEK EVENT - NEOM

Client: NEOM Scope of Work:


Contractor: MBL
Supply, Installation, Testing and commissioning of:
Consultant: Saudi Diyar
MEP Works Related to Buildings inside the island MEP Works inside the power house

Utility building (Powerhouse including Generator Rooms, Switchgear Pumping station works
Rooms, Transformer Rooms, Fire Fighting Pump Room, Plumbing Pump Water features
Room & RO Plant)

MEP Infrastructure work ( MV/LV Cables, Potable Water, Sewage, Fire and
Irrigation underground pipes)
63
CO M PA N Y P R O F I L E / CO M P L E T E D P R OJ E C T S

KING ABDULLAH FINANCIAL DISTRICT


Subterranean Road And Utility Tunnels

Client: KAFD Scope of Work:


Contractor: JLL The Project consists of three areas namely Subterranean road, Tunnel 1C and Tunnel 1B
Engineer: KEO The Scope is Supply and Installation of Electrical and Mechanical Work.

Project Duration: 10 months

64
CO M PA N Y P R O F I L E / CO M P L E T E D P R OJ E C T S

MINISTRY OF DEFENSE

Renovation of Academy Building No 4 & 5

Client: Ministry of Defense Scope of Work:


Contractor: ICAD
Supply, Installation of:

HVAC System –(Ducting, Exhaust fans, FAHUs and FCUs) Electrical Works –(Lighting fixtures, switches, panels, cables)

Plumbing Works –(Drainage System, Hot and Cold water system, Pumps, Civil Works –(Blockwork, Plastering, Terazzo, Painting works, Gypsum
Sanitary Fixtures, EWH) Boards, Doors and Windows)

Fire fighting Works –(Piping, Sprinklers, Fire extinguishers, Fire hose cabinets)
65
CO M PA N Y P R O F I L E / CO M P L E T E D P R OJ E C T S

WORLD DEFENSE SHOW 2022 - RIYADH

Client: SELA Scope of Work:


Contractor: Saudi Architects
Construction of structural steel sheds for parking area Plant rooms and electrical rooms
BID01 AND BID02
Construction of Storm Drainage System and surface drainage Bulk excavation Cut and Fill on site and grading to final formation

Construction of ponding areas levels of roads

Construction of Potable water Distribution systems, Fire water Construction of Roads sub-base and base course asphalt concrete

system, irrigation network, sanitary wastewater collection base course and surface Asphalt wearing course

Construction of Site electrical duct banks for mv and lv cables Airfield lighting systems

Street lighting works

66
CO M PA N Y P R O F I L E / CO M P L E T E D P R OJ E C T S

WEST PIER

Facilities Upgrade Ras Tanura

Client: ARAMCO Scope of Work:


Contractor: Huta Diesel loading pump / Diesel System Oily water collection & treatment system Drinking water system
Engineer: Mustang Al Hejailan Fire water system Compressed air system

Transformers, switch rack and panel boards Wires, cables, conduits and cable trays Lighting system

Cathodic protection

Coordination & tie-in with instrumentation works and existing utilities


67
CO M PA N Y P R O F I L E / CO M P L E T E D P R OJ E C T S

VIA RIYADH

Client: SELA Scope of Work:


Contractor: MBL
Supply, Installation of:
Consultants: Dar Al Omran Consultants
HVAC System Electrical Works

Fire fighting Works LPG System Network

Plumbing Works

68
CO M PA N Y P R O F I L E / CO M P L E T E D P R OJ E C T S

JEDDAH YACHT CLUB

Client: SELA Scope of Work:


Contractor: MBL
Supply, Installation of:
Consultants: ACC
Lighting fixtures, switches, LV cables, MDB, Air Units, Exhaust fans, Generator Fans, FCUs,
panels, UPS and AHU MCCs. Expansion tanks, Pressurization units

Ducting works, chiller units, chilled water Fire fighting system


pumps, chilled water AHUs, FAHUs, Makeup Drainage and Water Supply Systems

69
CO M PA N Y P R O F I L E / CO M P L E T E D P R OJ E C T S

STRATEGIC RESERVOIR - TAIF

Supply and Installation of Potable Water Network PHASE 1

Client: SWCC Scope of Work:


Contractor: Al-Ayuni Investment and Contracting Company
Supply, Installation, Testing and commissioning of:
Consultant: Khatib Al Alami
Piping works

Welding and coating works

Total 4km piping work with sizes ranging from 600 mmØ to 1800 mmØ
70
CO M PA N Y P R O F I L E / CO M P L E T E D P R OJ E C T S

STRATEGIC TANKS - TAIF

Client: SWCC Scope of Work:


Contractor: Al-Ayuni Investment and Contracting Company
Supply, Installation, Testing and commissioning of:
Consultant: Khatib Al Alami
Installation of piping works f rom 300mm to 2000mm

Welding and coating works


71
CO M PA N Y P R O F I L E / CO M P L E T E D P R OJ E C T S

MASHAREF
Project 2

Client: Kinan Scope of Work:


Contractor: Huta MEP Works for Potable Water, Street Lighting and MV Networks, Infrastructure Works
Consultant: Arabtech Jardaneh
Supply & Installation of StreetLighting

Supply & Installation of Power Network

Supply & Installation of Potable water systems

Supply & Installation of Fire fighting works

72
CO M PA N Y P R O F I L E / CO M P L E T E D P R OJ E C T S

KING ABDULLAH FINANCIAL DISTRICT


CP-04b MEP Works for Parcel 2.08, 2.09 and 2.12

Client: KAFD Scope of Work:


Contractor: Saudi Arabian Baytur Survey on installed MEP systems & status
Engineer: Dar Al Handasah Reporting on the pending works for full operation of MEP systems

Supply and Installation of complete MEP Works:

HVAC Electrical

Fire fighting Low Current


73
CO M PA N Y P R O F I L E / CO M P L E T E D P R OJ E C T S

MUVI CINEMA -TAIF

Client: MUVI Scope of Work:


Contractor: ICAD Steel Structure Work : Steel Work for Stadia and Projection Area .

74
CO M PA N Y P R O F I L E / CO M P L E T E D P R OJ E C T S

KING ABDULLAH FINANCIAL DIST.


Pop Up Restaurant project

Client: KAFD Scope of Work:


Contractor: First Fix Construction and Finishing Restaurant Building steel trellis

Earth Work : Excavation , Backfilling and Leveling . Hardscape work

Sub-Structure Works : Plain Concrete, Isolated Footing , Tie Beam , Retaining Walls , landscaping
Grade Beams , Slab on Grade , Steps. painting works
Super Structural Work : Column , Beam , Slabs ,Stairs . Electrical works: Power, Lighting, Data, fire alarm
Hard Scape Work : Granite , Marble . Mechanical works; drainage, water supply, HVAC, irrigation, mist
Finish Work : Screed Work , Roof Water Proofing ,Block Work , Facade Work , Handrail.- system, fire fighting
cement board cladding

Aluminum and glass facades

stainless steel and Glass

handrail
75
steel and fabric Shades
CO M PA N Y P R O F I L E / P R OJ E C T R E F E R E N C E

PRE-FABRICATED BUILDING PROJECTS

ALULA Film Camp


MDLBEAST 2022
Neom Camp
Dubai Expo Japan Pavilion
Dubai Expo Arrival Plaza
Dubai Expo Control Room
Dubai Expo Overlay Basement Chillers and Storage

76
CO M PA N Y P R O F I L E / P R E- FA B R I CAT E D B U I L D I N G P R OJ E C T S

ALULA FILM CAMP

Client: Royal Commission Al Ula Scope of Work:


Conceptualize Fabrication

Design Installation of an Executive-Level Resort Containing 150 Keys on Turnkey Bases

77 Construction
CO M PA N Y P R O F I L E / P R E- FA B R I CAT E D B U I L D I N G P R OJ E C T S

MDL BEAST 2022

Client: MDL Beast LLC Scope of Work:


Design

78 Fabrication & Delivery of Prefabricated Volumetric Units to form the VIB (Very Important Beast) Observation towers
CO M PA N Y P R O F I L E / P R E- FA B R I CAT E D B U I L D I N G P R OJ E C T S

NEOM CAMP

Client: NEOM Scope of Work:


Conceptualize Fabrication

Design Installation of an Executive-Level Compound containing 120 Keys on Turnkey bases

79 Construction
CO M PA N Y P R O F I L E / P R E- FA B R I CAT E D B U I L D I N G P R OJ E C T S

DUBAI EXPO JAPAN PAVILION

Client: EXPO Dubai 2020 LLC-SO Scope of Work:


Design Development

80 Supply & Installation of Japan Pavilion Sushiro Restaurant


CO M PA N Y P R O F I L E / P R E- FA B R I CAT E D B U I L D I N G P R OJ E C T S

DUBAI EXPO ARRIVAL PLAZA

Client: EXPO Dubai 2020 LLC-SO Scope of Work:


Supply

Delivery and Installation of Arrivals Plaza Structures – Sustainability

Mobility & Opportunity


81
CO M PA N Y P R O F I L E / P R E- FA B R I CAT E D B U I L D I N G P R OJ E C T S

DUBAI EXPO CONTROL ROOM

Client: EXPO Dubai 2020 LLC-SO Scope of Work:


Supply

82 Delivery & Installation of New Build EOC and refurbishment works


CO M PA N Y P R O F I L E / P R E- FA B R I CAT E D B U I L D I N G P R OJ E C T S

DUBAI EXPO OVERLAY BASEMENT CHILLERS AND STORAGE

Client: EXPO Dubai 2020 LLC-SO Scope of Work:


Design

Build

83 Maintenance & Completion Works Of Overlay Works For Service Zone &Basement Operational Compounds & Removal Fr. Site At End Of The Project
OUR VALUE PROPOSITIONS
CO M PA N Y P R O F I L E / O U R VA L U E P R O P O S I T I O N S

Presence of international and local staff, experienced in the field of designing, executing,
integration and maintenance of mega projects and Construction.
Co-operation with world leading suppliers and local providers.
Professional Contract, Commercial and Program administration capabilities.
Single point of contact for covering the entire range of MEP services.
Non-Vendor specific, focusing on custom management system.
ISO9001-2008 Quality Management
Understanding and ability for fast track and challenging project requirements, with the
availability of an enthusiastic team.
Saudi Electric Company approved contractor
Civil defense approved for fire protection & fire alarm services
ARAMCO certified MEP contractor

85
JEDDAH HEAD OFFICE : PO Box 117188, Jeddah 21391, KSA
RIYADH OFFICE : PO Box No-57967, Riyadh 12474, Prince Sultan Bin AbdulAziz Rd, Riyadh, KSA info@firstfix-ksa.com I www.firstfix-ksa.com