Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

MOP - Integration New Link RN-BDPGB To RN-BDSCR

Download as pdf or txt
Download as pdf or txt
You are on page 1of 18

New Link Integration RN-BDSBG to RN-BDSCR-01/02

Customer Name: XL AXIATA

Method of Procedure (MOP)


New Link Integration RN-BDPGB-01/02 to RN-
BDSCR-01/02

Site Name : Penggambiran


Version : 1 (Approved)
Last Updated : 08 Desember 2014
Approved by : (customer) -
Approved by : (Lintas) – Herdiana
Effective Date :
MOP

Original Date Effective Date Page


Method of Procedure
1 of 18
Table of Content

1. DOCUMENT VERSION CONTROL ............................................................................... 3


2. PURPOSE & OBJECTIVE ............................................................................................. 4
2.1 Introduction ............................................................................................................................... 4
2.2 Person in contacts (PIC) ............................................................................................................. 4
3. IP PORT ALLOCATION ............................................................................................... 4
MOP Integration RN-BDSBG to RN-BDSCR-01/02

4. PREPARATION CHECK LIST & SCHEDULE .................................................................... 5


4.1 Preparation ................................................................................................................................ 5
4.2 Schedule ..................................................................................................................................... 5
5. IMPLEMENTATION ACTIVITIES .................................................................................. 6
5.1 Traffic downtime ........................................................................................................................ 6
5.2 Implementation Procedure ........................................................................................................ 6
A. PREPARATION ........................................................................................................................ 6
B. EXECUTION ............................................................................................................................ 8
C. MONITORING ...................................................................................................................... 15
6. FALLBACK ACTIVITIES ............................................................................................. 17
6.1 Fallback plan ............................................................................................................................. 17
7. APPROVAL SIGN-OFF.............................................................................................. 18

Original Date Effective Date Page


Method of Procedure
2 of 18
1. DOCUMENT VERSION CONTROL

Type of Status of PIC


No Date Version PIC LTI email email
MoP MoP Cust
Integration Fajri fajri@lt- Taufiq
Draft
1 08-Jan-15 & Migration 1 Nurbadri P indonesia.com I taufiqi@xl.co.id
Integration
Review
2 08-Jan-15 & Migration 1
3
4
MOP Integration RN-BDSBG to RN-BDSCR-01/02

Type of MoP
1. New Site
2. Expansion
3. Software Update / Upgrade
4. Integration
5. Migration
6. System Engineering
7. New Product Introduction (NPI)
8. Proof of Concept (PoC)
9. Trial
Status of MoP
1. DRAFT – Initial propose document from LTI
2. REVIEW – document review between Customer and LTI
3. APPROVED – document signed off by Customer and LTI

Original Date Effective Date Page


Method of Procedure
3 of 18
2. PURPOSE & OBJECTIVE
2.1 Introduction

This document has been prepared to integrate new link between RN-BDPGB-01 and RN-
BDPGB-02 to RN-BDSCR-01/RN-BDSCR-02.

This MoP will be done by Lintas Teknologi Indonesia Team and has to be supervised by
authorized PT. XL Axiata Team, and the schedule shall be proposed in advance to PT. XL
Axiata.

Upon the completion of the works, Lintas Teknologi Indonesia installation team shall inform
MOP Integration RN-BDSBG to RN-BDSCR-01/02

to PT. XL Axiata informing that the procedures has been completed.

2.2 Person in contacts (PIC)

 PT Lintas Teknologi Indonesia :


 Ivan J Marbun
 Arie Satya Nugraha
 Fajri Nurbadri P
 Ardi W
 Debby Kharisma

3. IP PORT ALLOCATION

Allocation port and IP design as below mapping.

10 169 10 92 255.255.255.252 Network


10 169 10 93 255.255.255.252 RN-BDSCR-01 port ge-1/0/6
10 169 10 94 255.255.255.252 RN-BDPGB-01 port ge-1/0/6

10 169 10 95 255.255.255.252 Broadcast


10 169 10 96 255.255.255.252 Network
10 169 10 97 255.255.255.252 RN-BDSCR-02 port ge-1/0/6
10 169 10 98 255.255.255.252 RN-BDPGB-02 port ge-1/0/6

10 169 10 99 255.255.255.252 Broadcast

Original Date Effective Date Page


Method of Procedure
4 of 18
4. PREPARATION CHECK LIST & SCHEDULE
4.1 Preparation
Analysis existing physical & logical network interconnection check list before
installation:

 Permit for site entry


 Availability of “waspang (PIC)” from XL AXIATA
 Link requirement is ready
 Permission login/password approved by customer

4.2 Schedule
MOP Integration RN-BDSBG to RN-BDSCR-01/02

The MPLS network setup will be done on live network and It is proposed to be scheduled
on :TBD, 2016

Original Date Effective Date Page


Method of Procedure
5 of 18
MOP

5. IMPLEMENTATION ACTIVITIES
5.1 Traffic downtime
This implementation has no downtime
Integration RN-BDSBG to RN-BDSCR-01/02

5.2 Implementation Procedure

NO DESCRIPTION COMMAND CONFIGURATION ACTION Time Frame STATUS


(Minutes)
A. PREPARATION
1 Physical inspection * check the physical hardware The purpose of this step is  OK
and Power On to detect any obvious  NOK
mechanical damage done
to the chassis or to the
system board.
1. check the chassis and
system boards for any sign
of sign of mechanical
damage
2. check that all FRU are
correctly seated
3. connect the power
supplies and turn them on
one at a time
2 General system The purpose of this section  OK
status is to collect data about the  NOK
router hardware
configuration and
environment.
a Active alarm show chassis alarm

MOP New Link Integration RN-BDSBG to RN-BDSCR-01/ RN-BDSCR-02 6


MOP

NO DESCRIPTION COMMAND CONFIGURATION ACTION Time Frame STATUS


(Minutes)
b Save the system show chassis hardware
hardware
configuration for
Integration RN-BDSBG to RN-BDSCR-01/02

future reference
c Voltage and show chassis environment
temperatures
d Status of individual show chassis fpc detail
components
3 Routing Engine and The purpose of this section  OK
Storage media is to check if the routing  NOK
engine and its storage
media are all working
properly
a Routing engine show chassis routing-engine
status
b Storage media on show system storage if the directories are
each routing engine correctly mounted, we can
run "show system
snapshot" to copy junos
software from the compact
flash onto the hard drive
4 Software Junos The purpose of this step is  OK
to check the junos are  NOK
correctly install on the
machine
a Version show version
show version invoke-on all-routing-engine
b Running process show system process
c Detail show system software detail
d Log show log messages |no-more

MOP New Link Integration RN-BDSBG to RN-BDSCR-01/ RN-BDSCR-02 7


MOP

NO DESCRIPTION COMMAND CONFIGURATION ACTION Time Frame STATUS


(Minutes)
B. EXECUTION
5. Configure interface RN-BDSCR-01: RN-BDSCR-01 5 minutes  OK
 NOK
Integration RN-BDSBG to RN-BDSCR-01/02

ge-1/0/6 at RN- >configure private RN-BDPGB-01


BDSCR-01 and # Paste This Command #
interface ge-1/0/6 at delete interfaces ge-1/0/6
RN-BDPGB-01 set interfaces ge-1/0/6 description “BB_GSM_1x_1GE_to_RN-BDPGB-01_ge-
1/0/6”
set interfaces ge-1/0/6 mtu 4500
set interfaces ge-1/0/6 gigether-options no-auto-negotiation
set interfaces ge-1/0/6 unit 0 family inet address 10.169.10.93/30

show |compare
commit synchronize and-quit

RN-BDPGB-01:
>configure private
# Paste This Command #
delete interfaces ge-1/0/7
set interfaces ge-1/0/7 description “BB_GSM_1x_1GE_to_RN-BDSCR-01_ge-
1/0/6”
set interfaces ge-1/0/7 mtu 4500
set interfaces ge-1/0/7 gigether-options no-auto-negotiation
set interfaces ge-1/0/7 unit 0 family inet address 10.169.10.94/30

show |compare
commit and-quit

MOP New Link Integration RN-BDSBG to RN-BDSCR-01/ RN-BDSCR-02 8


MOP

NO DESCRIPTION COMMAND CONFIGURATION ACTION Time Frame STATUS


(Minutes)
Verify :
ping bypass-routing 10.169.10.93 size 4500 rapid count 1000
Integration RN-BDSBG to RN-BDSCR-01/02

Note :
only goes to next step if test ping is normal

7 Inject protocol to RN-BDSCR-01: RN-BDSCR-01 5 minutes  OK


new link interface >configure private RN-BDPGB-01  NOK
and verify # Paste This Command #
set interfaces ge-1/0/6 unit 0 family iso
set interfaces ge-1/0/6 unit 0 family mpls maximum-labels 5
set protocols rsvp interface ge-1/0/6.0
set protocols mpls interface ge-1/0/6.0
set protocols mpls label-switched-path 3G-RN-BDSCR-01-RN-BDPGB-01 to
10.165.60.240
set protocols mpls label-switched-path 3G-RN-BDSCR-01-RN-BDPGB-01 node-
link-protection
set protocols isis interface ge-1/0/6.0 point-to-point
set protocols isis interface ge-1/0/6.0 bfd-liveness-detection minimum-interval
500
set protocols isis interface ge-1/0/6.0 bfd-liveness-detection multiplier 3
set protocols isis interface ge-1/0/6.0 level 2 disable
set class-of-service interfaces ge-1/0/6 scheduler-map map_RAN_Backbone
set class-of-service interfaces ge-1/0/6 unit 0 classifiers exp exp-cs-RAN-
backbone
set class-of-service interfaces ge-1/0/6 unit 0 rewrite-rules exp exp-rw-RAN-
backbone

MOP New Link Integration RN-BDSBG to RN-BDSCR-01/ RN-BDSCR-02 9


MOP

NO DESCRIPTION COMMAND CONFIGURATION ACTION Time Frame STATUS


(Minutes)
show | compare
commit check
commit synchronize and-quit
Integration RN-BDSBG to RN-BDSCR-01/02

RN-BDPGB-01:
>configure private
# Paste This Command #
set interfaces ge-1/0/7 unit 0 family iso
set interfaces ge-1/0/7 unit 0 family mpls maximum-labels 5
set policy-options prefix-list mpls_prefix 10.169.10.0/24
set policy-options prefix-list ip-management 10.169.10.0/24
set protocols mpls interface ge-1/0/7.0
set protocols mpls label-switched-path 3G-RN-BDPGB-01-RN-BDSCR-01 to
10.165.60.252
set protocols mpls label-switched-path 3G-RN-BDPGB-01-RN-BDSCR-01 node-
link-protection
set protocols isis interface ge-1/0/7.0 point-to-point
set protocols isis interface ge-1/0/7.0 bfd-liveness-detection minimum-interval
500
set protocols isis interface ge-1/0/7.0 bfd-liveness-detection multiplier 3
set protocols isis interface ge-1/0/7.0 level 2 disable
set protocols rsvp interface ge-1/0/7.0
set class-of-service interfaces ge-1/0/7 scheduler-map map_RAN_backbone
set class-of-service interfaces ge-1/0/7 unit 0 classifiers exp exp-cs-RAN-
backbone
set class-of-service interfaces ge-1/0/7 unit 0 rewrite-rules exp exp-rw-RAN-
backbone

MOP New Link Integration RN-BDSBG to RN-BDSCR-01/ RN-BDSCR-02 10


MOP

NO DESCRIPTION COMMAND CONFIGURATION ACTION Time Frame STATUS


(Minutes)

show | compare
commit check
Integration RN-BDSBG to RN-BDSCR-01/02

commit and-quit

Verify :
show isis adjacency | no-more
show isis interface | no-more
show mpls interface | no-more
show ldp interface | no-more
show rsvp interface | no-more
show mpls lsp | no-more
show mpls lsp extensive | no-more
show rsvp neighbor | no-more
show bgp summary

11 Configure interface RN-BDSCR-02: RN-BDSCR-02 5 minutes  OK


ge-1/0/6 at RN- configure private RN-BDPGB-02  NOK
BDPGB-02
# Paste This Command #
delete interfaces ge-1/0/6
set interfaces ge-1/0/6 description “BB_GSM_1x_1GE_to_RN-BDPGB-02_ge-
1/0/6”
set interfaces ge-1/0/6 mtu 4500
set interfaces ge-1/0/6 gigether-options no-auto-negotiation
set interfaces ge-1/0/6 unit 0 family inet address 10.169.10.97/30

show |compare
commit synchronize and-quit

MOP New Link Integration RN-BDSBG to RN-BDSCR-01/ RN-BDSCR-02 11


MOP

NO DESCRIPTION COMMAND CONFIGURATION ACTION Time Frame STATUS


(Minutes)

RN-BDPGB-02:
Integration RN-BDSBG to RN-BDSCR-01/02

>configure private
# Paste This Command #
delete interfaces ge-1/0/7
set interfaces ge-1/0/6 description “BB_GSM_1x_1GE_to_RN-BDSCR-02_ge-
1/0/6”
set interfaces ge-1/0/7 mtu 4500
set interfaces ge-1/0/7 gigether-options no-auto-negotiation
set interfaces ge-1/0/7 unit 0 family inet address 10.169.10.98/30

show |compare
commit check
commit and-quit

Verify :
ping bypass-routing 10.169.10.97 size 4500 rapid count 100

Note :
only goes to next step if test ping is normal

12 Inject protocol to RN-BDSCR-02: RN-BDSCR-02 5 minutes  OK


new link interface >configure private RN-BDPGB-02  NOK
and verify
# Paste This Command #
set interfaces ge-1/0/6 unit 0 family iso
set interfaces ge-1/0/6 unit 0 family mpls maximum-labels 5
set protocols rsvp interface ge-1/0/6.0

MOP New Link Integration RN-BDSBG to RN-BDSCR-01/ RN-BDSCR-02 12


MOP

NO DESCRIPTION COMMAND CONFIGURATION ACTION Time Frame STATUS


(Minutes)
set protocols mpls interface ge-1/0/6.0
set protocols mpls label-switched-path 3G-RN-BDSCR-02-RN-BDPGB-02 to
10.165.60.241
Integration RN-BDSBG to RN-BDSCR-01/02

set protocols mpls label-switched-path 3G-RN-BDSCR-02-RN-BDPGB-02 node-


link-protection
set protocols isis interface ge-1/0/6.0 point-to-point
set protocols isis interface ge-1/0/6.0 bfd-liveness-detection minimum-interval
500
set protocols isis interface ge-1/0/6.0 bfd-liveness-detection multiplier 3
set protocols isis interface ge-1/0/6.0 level 2 disable
set class-of-service interfaces ge-1/0/6 scheduler-map map_RAN_Backbone
set class-of-service interfaces ge-1/0/6 unit 0 classifiers exp exp-cs-RAN-
backbone
set class-of-service interfaces ge-1/0/6 unit 0 rewrite-rules exp exp-rw-RAN-
backbone

show | compare
commit check
commit synchronize and-quit

RN-BDPGB-02:
>configure private
# Paste This Command #
set interfaces ge-1/0/7 unit 0 family iso
set interfaces ge-1/0/7 unit 0 family mpls maximum-labels 5
set policy-options prefix-list mpls_prefix 10.169.10.0/24
set policy-options prefix-list ip-management10.169.10.0/24

MOP New Link Integration RN-BDSBG to RN-BDSCR-01/ RN-BDSCR-02 13


MOP

NO DESCRIPTION COMMAND CONFIGURATION ACTION Time Frame STATUS


(Minutes)
delete policy-options policy-statement Internal_route
set protocols mpls interface ge-1/0/7.0
set protocols mpls label-switched-path 3G-RN-BDPGB-02-RN-BDSCR-02 to
Integration RN-BDSBG to RN-BDSCR-01/02

10.165.60.253
set protocols mpls label-switched-path 3G-RN-BDPGB-02-RN-BDSCR-02 node-
link-protection
set protocols isis interface ge-1/0/7.0 point-to-point
set protocols isis interface ge-1/0/7.0 bfd-liveness-detection minimum-interval
500
set protocols isis interface ge-1/0/7.0 bfd-liveness-detection multiplier 3
set protocols isis interface ge-1/0/7.0 level 2 disable
set protocols rsvp interface ge-1/0/7.0
set class-of-service interfaces ge-1/0/7 scheduler-map map_RAN_backbone
set class-of-service interfaces ge-1/0/7 unit 0 classifiers exp exp-cs-RAN-
backbone
set class-of-service interfaces ge-1/0/7 unit 0 rewrite-rules exp exp-rw-RAN-
backbone

show | compare
commit check
commit and-quit

Verify :
show isis adjacency | no-more
show isis interface | no-more
show mpls interface | no-more
show ldp interface | no-more
show rsvp interface | no-more

MOP New Link Integration RN-BDSBG to RN-BDSCR-01/ RN-BDSCR-02 14


MOP

NO DESCRIPTION COMMAND CONFIGURATION ACTION Time Frame STATUS


(Minutes)
show mpls lsp | no-more
show mpls lsp extensive | no-more
show rsvp neighbor | no-more
Integration RN-BDSBG to RN-BDSCR-01/02

show bgp summary

15 Make sure all Please confirm to team fault regarding all services under PE and RN-BDPGB-02
services are normal

C. MONITORING
1 Check connectivity ping bypass-routing <ip-address> Test IP Connectivity  OK
IP PtP Connection between RN Router to RN  NOK
show interfaces terse Router , to PE Router ,
Node B and RNC
2 Check VRRP and show vrrp summary Test VRRP in Router RAN
failover works
normally , also ARP show arp
3 IGP This is the first step that we
must enable/check for
MPLS-VPN fuction. This
section will provide
information about routing
table of inet.0 for optimal
reachibility.
a ISIS use link state information
to make routing decision
with SPF algorithm
Configured show isis interface

MOP New Link Integration RN-BDSBG to RN-BDSCR-01/ RN-BDSCR-02 15


MOP

NO DESCRIPTION COMMAND CONFIGURATION ACTION Time Frame STATUS


(Minutes)

Status show isis adjacency


Information show route protocol isis
Integration RN-BDSBG to RN-BDSCR-01/02

show isis database


4 Signaling The second step to create  OK
labeling for MPLS-VPN. This  NOK
will provide information of
routing table on inet.3
a LDP Create FEC and manage
LSP to eggress
Configured peer show ldp interface
Peer show ldp neighbor
Information show route table inet.3
show ldp database
Active show ldp session
5 BGP Perform recursive lookup  OK
to resolve BGP next-hop  NOK
and will select route with
lowest preference between
inet.0 and inet.3
a Status show bgp summary
b Information show route advertising-protocol bgp
show route receiving-protocol bgp
show route protocol bgp

MOP New Link Integration RN-BDSBG to RN-BDSCR-01/ RN-BDSCR-02 16


MOP

6. FALLBACK ACTIVITIES
6.1 Fallback plan
FALLBACK PLAN
1 Restore original configure private Router  OK
 NOK
Integration RN-BDSBG to RN-BDSCR-01/02

configuration in load override yyyymmdd.NAME RN-BDSCR-01


PE-BDSHO-01
router
RN-BDPGB-01
show | compare
RN-BDPGB-02
commit check
commit and-quit Estimated time : 1 minutes

2 Verify all status in show configuration | no-more Router  OK


router show interfaces terse | no-more RN-BDSCR-01  NOK
show system process extensive | no-more PE-BDSHO-01
show bgp summary | no-more RN-BDPGB-01
show bgp neighbor | no-more RN-BDPGB-02
show isis interface | no-more
show isis adjacency | no-more Estimated time : 5 minutes
show mpls interface | no-more
show ldp interface | no-more
show ldp neighbor | no-more
show ldp session | no-more
show rsvp interface | no-more
show rsvp neighbor | no-more
show rsvp session | no-more
show mpls lsp | no-more
show mpls lsp extensive | no-more
show route table inet.3 | no-more
show route summary | no-more
show chassis alarm | no-more

MOP New Link Integration RN-BDSBG to RN-BDSCR-01/ RN-BDSCR-02 17


7. APPROVAL SIGN-OFF

We declare that the design for the abovementioned systems and functions, as defined in this
document is executed to the full satisfaction of the customer based on EWO#...........................
The following representatives from the respective organizations involved in this project are
satisfied that this document captures the full requirement for this service.

PT. Huawei Services (SLM MPLS) PT. XL Axiata


MOP Integration RN-BDSBG to RN-BDSCR-01/02

___________________________ ___________________________

PT. Lintas Teknologi Indonesia PT. Lintas Teknologi Indonesia

____________________________ _____________________________

MOP New Link Integration RN-BDSBG to BA-BDSHO-01/ RN-BDSCR-02


18

You might also like