Front Compound Wall - 06-09-23
Front Compound Wall - 06-09-23
Front Compound Wall - 06-09-23
6'-0" X 5'-3"
C4
W4
Lintel:8'-0" WSEATING
R
W3 VERANDAH
Lintel:8'-0"
safety shutter
2'-3"
Sill:1'-4" Sill:1'-4"
1'-3"
OVERHEAD UNIT FF Lintel:8'-0" SHOE
Lintel:8'-0" Lintel:8'-0"
GF Sill:2'-6" RACK 14' X 7'-11"
Sill:2'-6" Sill:3'-7" Lintel:8'-0"
2'-1"
PB1
MARBLE CLADDING
Sill:1'-4"
4' 2'-9"
FFL : 3'0" GT
+2'-9" LEVEL
1'-3" 1'-3" 1'-3" CHAMBER OF
IC
GT SIZE 2'0" X 2'0"
PIL : 0'6" UP
15" step
6 riser
IC
PIL : 0'0"
GROUND FLOOR PLAN
PB1
C3
GATE CABIN
12"
FFL : 3'0" UNDER GROUND
FFL : 3'0"
REFERENCE LINE FOR ELEVATION
WATER TANK
FFL : 3'0" 9"
FOOTING F2
9'-3"X7'-9"
FOOTING F3
PIL : 1'0" PIL : 2'0"
7'-0" DEPTH
PIL : 1'9"
C4
+2'-3" LEVEL UP
PB1
+2'-9" LEVEL REFER DETAILS OF THIS PORTION IN DWG OF PLINTH BEAM OF MAIN BLDG
5'
FOOTING F2 FOOTING F2 FOOTING F2 FOOTING F2 FOOTING F2
6'-7"
OTTA
3' 13'-6" X 12'-9"
4' 4'
3'-0"
MAIN GATE
2'-6"
13' 13' 13'-10" 13'
14"
sliding door WICKET GATE
LVL. +13'9"
1" 11"
2'
3'
1'
LVL. +10'9"
9" 2' 1' 2'-3" 6"1'-6" 2'-9"
5'-3"
BROWN STONE CLADDING BROWN STONE CLADDING ROUGH TEXTURED WALL
ROUGH TEXTURED WALL ROUGH TEXTURED WALL WITH INLAY WALL
11'
13'-9"
6"
6"
6'-6"
6'-6"
6'-6"
6'-6"
6'
LVL. +2'9" LVL. -5"
2'-9"
LVL. +0'9"
ROAD LEVEL
9'-8" 13' 13' 13' 13' 1'-6" 12'-6" 2'-9" 13' 1'-10" 6'-2" 9"
6" THK WALL . 14" THK WALL . 6" THK WALL . 14" THK WALL . 6" THK WALL .
BROWN STONE INLAY WORK ROUGH TEXTRED WALL BROWN STONE INLAY WORK ROUGH TEXTRED WALL ROUGH TEXTRED WALL
9"
sliding door
1'-2"
5"
5"
5"
5"
5"
9'-8" 13' 13' 13' 13' 1'-6" 12'-6" 2'-9" 13' 1'-11" 6' 9"
SW
DATE
DRAWN BY : dhara
STUDIO
N
NO. DATE REMARKS DESIGN ATELIER PVT. LTD. S
NE
CHK. BY : PRASHANT MODY
SE
405_SHACHET-II, Nr. Reliance House, Opp. GLS College, Off. C.G. Road,
Ahmedabad - 380 009. Gujarat, INDIA
E
d
in
W
Phone : +91-79-26461826 DATE : 12/04/2023
E-mail : design@nehamody.com
REV. NO. R11