KING SALMAN INTERNATIONAL COMPLEX FOR

MARITIME INDUSTRIES AND SERVICES(MYP)


�.)gruu.11 ¢ou'
soudi oromco PACKAGE 4, 5 & 6 I
SEPC..O k IP I!! Ill It!
W ffi. ft! if -✓Slt-:'f,ltYDRO

Field Clarification Note (FCN)


Doc. No: MYP-IK-FCN-6860 Rev.:B Plant Number:963,964 Package 5 & 6 Item No.:

Subject: WELDING DETAILS DRAWING FOR SUPPORTS

AREAS/DISCIPLINE

D Building/Civil D Structural □ Electrical D Fireproofing, Painting and


Insulation

' D Mechanical D Instrumentation D Communication D Process

■ Piping D Process Control D Interface D PLUMBING/HVAC

Drawing No. N/A

I
Drawing Title N/A
Drawing Rev.

TO:
N/A

ENGINEERING DEPARTMENT
Sheet No.
I
N/A
I Index
I
N/A

Part 1 - IK Query Attachment : ■ YES / □ NO

Clarification required on

1.Changing the base plate thickness from 10mm to 8mm.

2.Provide welding detail drawing for proposed supports.

□ Cost Impact ■ Schedule Impact □ Waiver Required

CONTRACTOR Name Designation Signature Date

Originator Md.Farhaj uddin Mechanical Engineer 14-11-2022


��
Reviewed By Zhou Gang Construction Manager
- \.
iij11-t�\a
,
JJ>'l-'l 11-/7

\�:»1'
Checked By Cao Yan Chief Engineer
: t).N'-)\/.�
Verified by
\-{ ,1 ...,1'" 9,,,-z._.
Jing Qinguang QA MANAGER

I
Approved by
f � .... ,, --<Z-1------
ARSHAD MAHMOOD PROJECT MANAGER
� �
'\"
Part II - OOK Response Attachment : ■ YES / □ NO

Form No.SAC-SA-MYP-DC-TMP-0022 Rev. 2


Field Engineering Change Evaluation Form
Evaluation Form No: MYP-IK-QA-EFRM-6860 FCN No: MYP-IK-FCN-6860
WELDING DETAILS DRAWING FOR
Plant Number: 963 & 964 -PS & P6 FCN Subject:
SUPPORTS
Drawing No: N/A Drawing Title: N/A
Drawing Rev:
N/A Sheet No. N/A
(the latest IFC Drawings shall be used for
Index N/A FCN Rev. No B
Discipline
□ Building/Civil D Structural D Electrical D Fireproofing, Painting and Insulation
□ Mechanical □ Instrumentation □ Communication D Process
0 Piping □ Process Control D Interface □ Plumbing/HVAC

Change Description Minor Major Remarks

□ Is the engineering change related to clarification of IFC drawings that


are not clear or consistent? 6 N/A
{
□ Is the engineering change related to clarification of IFC drawings for g □
confliction with dimension from other interfacing disciplines? Without With
deviation to Deviation to
SAEP SAEP

□ Is the engineering change related to lack or absence of construction


detailed design drawing? 6 N/A


Encountered restraints or extreme difficulties in the workplace where
IFC drawing is not workable such as space clearance limitation,
rz( □
Without With
obstruction to existing facilities etc. deviation to Deviation to
SAEP SAEP

□ Violation to Safety and or maintenance code provision if IFC drawing


or job specification will govern, thereby a clarification is required.
N/A □
The change/s determined as minor or not affecting the standard or in
□ response with the actual site condition, red line mark-up shall be as � N/A
sufficient documentation.

□ The field changes contain code deviation or are missing critical


information, which shall be regarded as Major change
N/A □
□ Any Items moved, deleted in engineering Drawing, or materials
changed or replacement.
N/A □
Other engineering changes that is deemed necessary to seek
□ clarification from Saudi Aramco prior to execution of works, which

PMT shall decide whether it is major or minor
�luation Conclusion:
� Evaluated as Minor Change D Evaluated as major Change □ Re-evaluate after response received
To Prepare the Red Line Mark-up Drawing To Prepare the Technical Query (TQ), and Consultant Designer shall be concurred
If Consultant Discipline designer concurrence required or not D Yes D No

Engineering Change Verification and Validation Column


Position Name Signature Date
Consultant discipline
Evaluated by:
designer /lead engineer
Finalized by: QA Manager

Prepared by: Jerry Jing Dated on l3 th June 2022, Rev. 2