Concrete Curing All Code

This document provides an annotated list of pertinent standards and committee reports related to curing Portland cement concrete pavements from the American Concrete Institute (ACI) and other organizations. It discusses several ACI standards that address curing requirements, methods, timing, and considerations for factors like temperature and strength gain. The standards generally focus on prescribed curing times or strength criteria and allow for different curing techniques but do not extensively consider material properties or durability aspects of curing.

Uploaded by

nitta
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
239 views

Concrete Curing All Code

This document provides an annotated list of pertinent standards and committee reports related to curing Portland cement concrete pavements from the American Concrete Institute (ACI) and other organizations. It discusses several ACI standards that address curing requirements, methods, timing, and considerations for factors like temperature and strength gain. The standards generally focus on prescribed curing times or strength criteria and allow for different curing techniques but do not extensively consider material properties or durability aspects of curing.

Uploaded by

nitta
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 19

Appendix A: Annotated Listof Pertinent Standards and Committee Reports...

Page 1 of 19

U.S. Department of Transportation


Federal Highway Administration
1200 New Jersey Avenue, SE
Washington, DC 20590
202-366-4000

Federal Highway Administration Research and Technology


Coordinating, Developing, and Delivering Highway Transportation
Innovations

Search Research & Technology

REPORT
This report is an archived publication and may contain dated technical, contact, and link information
Federal Highway Administration > Publications > Research Publications > Infrastructures > Pavements > 05038 > Guide
for Curing Portland Cement Concrete Pavements, II

Publication Number: FHWA-HRT-05-038 Date: August 2006


Publication Number: FHWA-HRT-05-038
Date: August 2006

Research
Guide for Curing Portland Cement
Design and
Analysis Concrete Pavements, II
Materials
and APPENDIX A: ANNOTATED LIST OF PERTINENT
Construction STANDARDS AND COMMITTEE REPORTS
Technology

Management American Concrete Institute (ACI)


and
Preservation The American Concrete Institute (ACI) Manual of Concrete Practice(91) contains
the major general purpose concrete standards and state-of-the-art committee
Surface reports on concrete in the United States. Several of these standards and reports
Characteristics address curing. The highest level standard, in a regulatory context, is the Building
Code Requirements for Structural Concrete (ACI 318-95(3)). Curing is one topic in
Construction this general standard for concrete. The Standard Specification for Structural
and Concrete (ACI 301-96(43)) is also a general concrete standard, but it does not
Materials have the regulatory authority of the Building Code. This standard is used to
Quality develop contract agreements on execution of concrete construction.
Assurance
Recommendations in ACI 301(43) should not exceed the guidance in ACI 318-95
(3)
Environmental .
Stewardship
ACI standards specific to curing are ACI 308-92, Standard Practice for Curing
Concrete(31), and ACI 308.1-98(45), Standard Specification for Curing Concrete. As
with ACI 301 , ACI 308.1(45) is used to develop contract agreements, the requirements of which
(43)
Top < Prev Main 3 4 5 6 7 8 9 10 11 12 Next > >>

http://www.fhwa.dot.gov/publications/research/infrastructure/pavements/p... 10/29/2015
Appendix A: Annotated Listof Pertinent Standards and Committee Reports... Page 2 of 19

should also fall within the limits of the ACI 318-95.(3) A new standard, Guide for Curing Concrete, has
been written by ACI Committee 308.(92) The eventual result is probably that ACI 308R(6) and ACI 308.1
(45)
together will replace ACI 308.(31) Other official documents that contain guidance on curing are ACI
305R(12) on Hot Weather Concreting, ACI 306R(14) on Cold Weather Concreting, ACI 325.9R(21) on
Construction of Concrete Pavements and Concrete Bases, ACI 330R(45) on Design and Construction
of Concrete Parking Lots, ACI 330(93) on Specification for Concrete Parking Lots, and ACI 228.1R(49)
on In-Place Methods to Estimate Concrete Strength.

Generally, ACI standards and committee reports focus primarily on prescribed curing times or on some
fraction of specified strength as quantitative criteria. Durability criteria allowances are discussed but
have not been developed. There is little consideration for the specific materials or proportions of
materials used in the concrete mixture, although some ACI standards consider portland cement type
and rate of strength gain. There is some mention of accounting for water-cement ratio, but this is not
well developed. Considerable attention is given to details of different curing methods. Temperature is
mostly considered in the context of maximum and minimum allowable concrete temperatures,
protection from freezing, and thermal shocks. Time-temperature considerations are dealt with in the
context of cold weather and in use of the maturity method when it is allowed for predicting the time to
end curing. The following paragraphs discuss each standard in some detail.

ACI 318-95, Building Code for Structural Concrete(3)

Meeks and Carino (1999) review the history of the Building Code guidance on curing.(4) Guidance in
the 1995 version is relatively simple. It directs that concrete, other than high-early strength concrete,
be maintained above 10 °C and kept moist for at least 7 days. Curing for high-early strength concrete
should be maintained for 3 days with temperatures also above 10 °C. Temperature-accelerated curing
is allowed, but the details must be developed by the user and durability must not be worse than when
the time-based prescriptive requirements are used. For details, reference is made to ACI 308(31), ACI
306R(14) (cold weather concreting) and ACI 305R (hot weather concreting).(12)

ACI 301-96, Standard Specification for Structural Concrete(42)

Curing is addressed in section 5.3.6 of the body of the specification. There is no mention of curing in
the Mandatory Requirements Checklist. The general requirement is to cure for 7 days after placement
(3 days for high early-strength concrete), but moisture retention measures may be terminated when:
(1) field cured cylinders reach 70 percent of required strength (fc¢); or (2) the temperature is 10 °C or
higher for the time required to achieve 85 percent of fc¢ in laboratory cured cylinders; or (3) the
concrete's strength reaches fc¢ as determined by accepted nondestructive methods. A reference is
given for the accepted nondestructive methods (paragraph 2.3.4.2). These methods include cast-in-
place cylinders (ASTM C 873(94)), penetration resistance (ASTM C 803(95)), pullout strength (ASTM C
900(96)), and maturity (ASTM C 1074(39)).

Methods allowed for moisture preservation include:

• Ponding, continuous fogging, or continuous sprinkling.


• Keeping mats or fabric wet.
• Applying steam (<150 °C) continuously.
• Using of sheet material (ASTM C 171).(17)
• Using of curing compounds (ASTM C 309).(23)
• Other accepted moisture-retaining methods (unspecified).

A proposed revision of ACI 301(43) was published in the July 1999 issue of Concrete International (v.
21 n. 7). The new guidance allows that curing compounds be specified by ASTM C 1315(24), as an
alternative to C 309(23) and that concretes containing silica fume be cured with added-water methods.

Additional information on the use of curing compounds is given in ACI 301-96.(43) Curing compound
should be applied
Top
according
< Prev
to the manufacturer's
Main 3 4 5
instructions
6 7 8
after
9
the
10
water
11
sheen
12
has disappeared
Next > >>

http://www.fhwa.dot.gov/publications/research/infrastructure/pavements/p... 10/29/2015
Appendix A: Annotated Listof Pertinent Standards and Committee Reports... Page 3 of 19

from the concrete surface and finishing operations are complete. The rate of application should not
exceed 5 m2/L. For rough surfaces, two coats are required, applied at right angles, at an application
rate not to exceed 5 m2/L. ACI 301-96(43) also cautions that curing compounds act as bond breakers.

Section 4.2.2.7 sets minimum concrete temperatures, varying from 10 °C to 13 °C, depending on the
cross-sectional area. Maximum allowable concrete temperature is 32 °C.

ACI 308-92, Standard Practice for Curing Concrete(31)

Chapter 1 of ACI 308(31) discusses general curing needs and presents the well known nomograph
relating evaporation from a free-water surface to temperature, wind velocity, and relative humidity. A
value of evaporation of 1.0 kg/m2/h or more requires measures to prevent excessive moisture loss
from the surface of the concrete. An evaporation rate greater than 0.5 kg/m2/h may also require some
measures to control evaporation. Chapter 1 also defines the temperature limits for placing concrete.
The practical lower limit is 10 °C, although hydration has been shown to continue down to -10 °C. The
recommended upper limit is approximately the maximum temperature anticipated during service,
although temperatures over 100 °C are sometimes used for accelerated-curing purposes.

Chapter 2 describes various curing methods, materials, and evaluation procedures. Materials that
allow extra water to be applied to the concrete (aside from the mixing water) via ponding, spraying,
and continuously wetting include mats, earth, sand, sawdust, straw, and hay. Materials that simply
retain mixing water include plastic sheets, treated paper, and liquid membrane-forming curing
compound. ASTM C 156(18) is cited (section 2.8) as the general method to use to evaluate curing
materials, although the most recent revision of this test method includes only liquid membrane-forming
curing compounds. This method is discussed in detail below.

Section 2.3.3 describes curing compound practices. Application rates of 0.20 to 0.25 L/m2, usually
expressed as 4.0-5.0 m2/L are recommended. There are recommendations on application practices
and a caution about the damage to concrete surfaces that can result if curing compound is applied too
early, while bleeding is still occurring, even though the bleeding is imperceptible due to the high
evaporation rates.

Section 2.9 gives criteria for effectiveness of curing. The basic criterion is prescriptive. The document
states that, if surface moisture and temperature are maintained within "desired" levels, then adequate
curing will result. Procedures are described for measuring strength development and for using maturity
to assess the degree of curing. Neither of these is sensitive to the degree of curing of surface or near-
surface concrete, which can be essential in determining some durability properties.

Section 2.10 recommends the length of curing to be 3 days for concretes containing Type III cement
and 7 days for concrete containing Type I cement. Length of curing for concretes containing Type II
cement is recommended to be 14 days. There is no recommendation for concretes containing Type IV
cements (which are either nonexistent or extremely rare) or Type V cement or for concretes containing
pozzolans or slag.

Chapter 3 deals with specific types of construction. Section 3.1 is specific to pavements and slabs.
These types of structures are particularly sensitive to curing because of the high surface-volume
ratios. They are also sensitive to thermal stresses caused by environmentally related temperature
cycling. Under extreme evaporation conditions (unspecified), curing may be required even before the
concrete has set. At temperatures greater than 5 °C, curing should be maintained for 7 days or until
concrete reaches 70 percent of its specified compressive or flexural strength.

ACI 308.1-98, Standard Specification for Curing Concrete(45)

This standard defines two new terms: initial curing and a final curing. Initial curing is defined as
"deliberate action taken between placement and final finishing of concrete to reduce the loss of
moisture from the surface of concrete." Final curing is defined as "deliberate action taken between the
final finishing and termination of curing."
Top < Prev Main 3 4 5 6 7 8 9 10 11 12 Next > >>

http://www.fhwa.dot.gov/publications/research/infrastructure/pavements/p... 10/29/2015
Appendix A: Annotated Listof Pertinent Standards and Committee Reports... Page 4 of 19

The initial curing period is normally neglected unless hot weather or water-cement ratios lower than
0.40 exist. The latter condition is only mentioned in a "Note to the Architect/Engineer" in the
"Mandatory Specification Checklist." There is no other mention of mixture proportions. Fogging
(section 5) and entrapment of bleed water under a uniform film of evaporation retardant are the only
methods allowed for curing during the initial curing period.

Length of curing is either a predetermined period of time or determined by a level of strength or


durability (paragraphs 1.1.6 and 1.6.4). The default curing time is 7 days if the temperature is greater
10 °C. Curing may be terminated early if strength is at least 70 percent of fc¢ or if desired levels of
durability are reached. There is no additional information on the latter criterion, except in the "Notes to
the Architect/Engineer," which references ACI 308(31), ACI 201.2R, and ASTM STP 169C (Senbetta
(1994)).(52) Durability criteria must be determined by the designer. Additionally, any of the following
moisture-retention techniques are allowed: sheet materials, pigmented curing compounds, addition of
water, water-absorbent materials.

Section 2 discusses moisture retention using sheet materials (ASTM C 171).(17) Inspection directions
require that the concrete surface be verified visually as being continuously wet. If dry spots are found,
then additional water must be added. It is noted in the "Optional Specification Checklist" that the
Architect/Engineer may specify the frequency of inspections. It also directs that dark sheets be used
when temperatures are less than 15 °C and that white sheets be used when daily high temperatures
are greater than 30 °C. The optional checklist also advises that when the temperature during the first
day after placing exceeds 20 °C, then white or similarly reflective sheeting is preferable.

Section 3 on liquid membrane-forming curing compounds requires that materials comply with ASTM C
309 and be white or gray pigmented to reflect light.(23) It also requires use of power spray equipment
unless the surface to be covered is less than 200 m2 or if overspray of curing compound to adjacent
areas must be avoided, in which case hand pump spraying is allowed. Materials must comply with
regulations on VOCs, although no information is given on these regulations. The optional checklist
allows non-VOC compliant materials if they are allowed by regulations of the using agency.

For floors with high wear resistance requirements, optimum top-surface strength, and minimal crack
widths, the optional checklist allows that a curing compound may be specified with lower moisture loss
requirements than in ASTM C 309.(23) A maximum moisture loss of 0.3 kg/m2 at a coverage rate of 7.4
m2/L is recommended. Heavier application rates or multiple application rates may also be specified as
optional requirements.

Section 4 on ponding requires that the temperature of curing water be no more than 10 °C cooler than
the surface of the concrete. Water must meet the requirements of ASTM C 94.(14)

Section 5 on fog spraying requires that the water meet the same requirements as for ponding. During
initial curing, water must be directed so that the fog drifts down onto the concrete to prevent damage to
the surface. No water is allowed to accumulate until after the time of setting. During final curing, the
requirement is to keep the concrete continuously wet.

Section 6 on sprinkling requires that the water meets the same requirements as for ponding. Sprinkling
is allowed only for final curing to avoid erosion of the concrete surface, unless the concrete surface is
protected by a form.

Section 7 on water-absorbent materials requires that water meet the same requirements as for
ponding. There is a caution on staining of materials, and burlap must meet AASHTO M 182.(20) This
technique must only be used for final curing and materials must be kept continuously wet.

ACI 308R-01, Guide to Curing Concrete(6)

This standard is essentially a major revision of ACI 308(31) and contains quite a bit of pertinent
information. The guidance on recommended requirements is not radically different than provided in
other ACI standards. The basic requirements are already published in ACI 308.1(45) described above,
but the guide contains considerable supplementary information that is not currently in any of the other
ACI guidance. Top < Prev Main 3 4 5 6 7 8 9 10 11 12 Next > >>

http://www.fhwa.dot.gov/publications/research/infrastructure/pavements/p... 10/29/2015
Appendix A: Annotated Listof Pertinent Standards and Committee Reports... Page 5 of 19

The guide presents a good discussion of important considerations in the first minutes and hours after
placing concrete, before final finishing and application of final curing. Duration of curing and properties
of the surface-affected zone are also considered in ways different from most other guidance. The
guide contains a section specific to pavements and slabs and a chapter on monitoring curing and
curing effectiveness.

ACI 306R-88, Cold Weather Concreting(14)

This standard is an advisory document intended as supplemental material to the contract specification.
Much of it deals with practices useful in avoiding freezing concrete at early ages. Section 6 deals with
the issue of slow strength development at low temperatures. An example of the use of the maturity
method is given. A tabulation (table 18, below) is given for minimum length of curing at two
temperatures (10 and 21 °C) needed to obtain various percentages of 28-day strength. Allowance is
made for cement type (I, II, and III).

Section 7 is about insulation. Extensive tabular data are presented by which the user can select the
insulating factor (R) of insulation needed to maintain concrete temperature at 10 °C for either 3 or 7
days. The tables account for thickness of the structural member, number of sides exposed to air, and
ambient temperature. This procedure is based on retention of the heat of hydration of the cementitious
materials in the concrete. There is no adjustment for the variable heat of hydration exhibited by
different cementitious materials.

Section 8 addresses curing requirements and methods. Heated enclosures tend to create drying
conditions, so attention must be paid to moisture retention. Water curing is not recommended because
of the practical problems associated with freezing of leaking water.

Table 18. Reproduction of table 6.8 of ACI 306R-88(14). Duration of recommended

protection for percentage of standard-cured 28-day (d) strength.

At 10 °C, d At 21 °C, d
Percentage of standard-cured 28-d strength
Type of Cement Type of Cement

I II III I II III
0 6 9 3 4 4 3
65 11 14 5 8 10 14*
85 21 28 16 16 18 12
95 29 35 26 23 24 20

*This number is in error. It was 4 d in the previous edition.

ACI 305R-91, Hot Weather Concreting(12)

This standard is also an advisory document and is intended as supplemental material to the contract
specification. It defines hot weather concreting as any combination of temperature, wind velocity,
relative humidity, and solar radiation that impairs the quality of fresh or hardened concrete because of
effects on moisture loss or rate of cement hydration. Quantitative guidance is given on methods to
calculate expected temperature of concrete from the temperature of ingredients and on techniques to
reduce the temperature
Top of fresh
< Prev concrete.
Main 3 4 5 6 7 8 9 10 11 12 Next > >>

http://www.fhwa.dot.gov/publications/research/infrastructure/pavements/p... 10/29/2015
Appendix A: Annotated Listof Pertinent Standards and Committee Reports... Page 6 of 19

Section 4 addresses the details of curing in hot weather. It references ACI 308(31) for general
guidance, but it also cautions in section 4.4 that concrete should not be allowed to get too hot since
ultimate strength is negatively impacted by high initial curing temperatures. It also cautions against too
rapid cooling in young concrete, which may result in formation of thermal shrinkage cracks. Curing
water should be near the concrete temperature, or at least the cooling rate should be no more than 3 °
C /h or no more than 28 °C in 24 h.

White pigmented curing compound is recommended to reflect light and reduce solar heating. It is
recommended that liquid membrane-forming curing compounds exceed the ASTM C 309(23)
requirements, which indicate that some agencies require a limit on water loss, as determined by ASTM
C 156(18), of 0.39 kg/m2. The requirement in ASTM C 309(23) is 0.55 kg/m2.

If the concrete water-cement ratio is less than 0.40, then the concrete should be water cured rather
than using a water-retentive membrane. The standard cautions that pavements 30.5- to 45.7-cm thick
can experience significant thermal heating due to the cement's heat of hydration. Temperature rises of
6.7 °C per 60 kg/m3 of cement can be expected in 18 to 72 h if no heat is lost.

ACI 325.9R-91 (reapproved 1997), Construction of Concrete Pavements and


Concrete Bases(21)

Chapter 2, "Materials," Section 2.5 addresses curing materials. Guidance is offered on burlap,
waterproof paper, and liquid membrane-forming curing compounds. Burlap is required to comply with
AASHTO M 182(20), with further provisions that nonabsorptive materials and unit weights of less than
0.24 kg/m2 not be used. M 182(20) allows a minimum unit weight of 0.23 kg/m2. ASTM C 171(17) is
referenced for waterproof paper and ASTM C 309(23) is referenced for liquid membrane-forming curing
compounds, with Type 2, white-pigmented, being preferred.

Chapter 10 on curing and protection refers to practices in ACI 308, with additional guidance that
surface water must be gone, plus the surface of the concrete must not be sensitive to marring.(31)
Curing duration is 7 days if temperatures are above 4 °C or strength is greater than or equal to 70
percent of fc¢. Section 10.1.1 on curing compound practice directs application rates follow
manufacturer's recommendation or be no less than 3.7 m2/L in the absence of manufacturer's
recommendation. Section 10.1.2 cautions not to use mono-molecular coatings (evaporation
retardants) for curing. Details for use of cotton mats, waterproof paper, and white- pigmented
polyethylene sheets are given. Section 10.1.6 provides guidance on addressing curing problems
associated with saw cuts in pavements, including the use of ropes or twisted fabric inserted into the
cut or placing strips of adhesive polyethylene over the cut.

Chapter 12 on cold and hot weather concreting references ACI 306R(14) and 305R(12), respectively.

ACI 330R-92 (reapproved 1997), Design and Construction of Concrete


Parking Lots(46)

Chapter 4 on construction recommends ASTM C 309(23) for curing compounds with a minimum
application rate of 5 m2/L or manufacturer's recommendations. Opening to traffic is recommended to
be no less than 3 days for automobile traffic and no less than 7 days for all other traffic if temperatures
are above 16 °C. More time (unspecified) is required if temperatures are cooler. A compressive
strength of 21 MPa or greater can substitute for the time requirement.

ACI 330.1-94, Specification for Plain Concrete Parking Lots(93)

This standard presents the guidance in ACI 330R(46) in a format suitable for writing project
specifications.

Top < Prev Main 3 4 5 6 7 8 9 10 11 12 Next > >>

http://www.fhwa.dot.gov/publications/research/infrastructure/pavements/p... 10/29/2015
Appendix A: Annotated Listof Pertinent Standards and Committee Reports... Page 7 of 19

ACI 228.1R-95, In-Place Methods to Estimate Concrete Strength(49)

This standard describes a number of in-place test methods for measuring strength that might be of
practical value in evaluating curing. Methods include rebound number (ASTM C 805(80)), penetration
resistance (ASTM C 803(95)), pullout test (ASTM C 900(96), break-off test (ASTM C 1150),(97) ultrasonic
pulse velocity (ASTM C 597(98), maturity method (ASTM C 1074(39)), and cast-in-place cylinders
(ASTM C 873(94)). The standard also describes principles of the test methods and some practical
details on limitations.

ASTM
ASTM standards cover material specifications and test methods. These are the standards primarily
referenced in the ACI standards. ASTM's curing standards are described below. Other standards are
useful for measuring or estimating development of properties that depend on curing. These are
summarized in ACI 228.1R-95, as described above.(49)

ASTM C 309-97, Specification for Liquid Membrane-Forming Curing


Compounds for Concrete(23)

This is the original and principal standard referenced for liquid membrane-forming curing compound.
The standard classifies curing compounds into Types 1 and 2, and Classes A and B. Type 1 is clear or
translucent (Type 1-D may contain a fugitive dye). Type 2 is white pigmented. Older versions of the
specification allowed a gray-pigmented curing compound. The class defines the type of solids in the
curing compound. Class A is unrestricted. Class B must be a resin.

The standard includes qualitative requirements, called "General Requirement," on sprayability, surface
adhesion to concrete, shelf life, toxicity, and deleterious reactions with concrete. There are quantitative
requirements on water-retention properties, reflectance properties (for Type 2), and drying times. The
water-retention requirement is the principal performance requirement pertaining to the curing function.
The limit is 0.55 kg/m2 at 72 h when tested according to ASTM C 156 at an application rate of 5 m2/L
or according to the manufacturer's recommendation.(18)

ASTM C 1315-95, Specification for Liquid Membrane-Forming Compounds


Having Special Properties for Curing and Sealing Concrete(24)

This standard covers some of the same scope as ASTM C 309(23), but requires higher performance in
moisture retention properties at a lighter application rate and some additional properties that are
independent of moisture retention that are not required in C 309(23). Like C 309(23), materials are
classified as Types and Classes. Type I is clear or translucent. Type II is white pigmented. There is no
provision for fugitive dyes. Class A is nonyellowing. Class B is moderately yellowing, and Class C may
undergo severe darkening.

As in C 309, there are qualitative requirements on applicability, adhesion, deleterious reactions with
concrete, toxicity, and shelf life.(23) Minimum solids content is 25 percent. This requirement is intended
to ensure a minimum membrane thickness of 0.025 mm. Maximum moisture loss, tested according to
C 156, is 0.40 kg/m2 in 72 h.(18) Unless otherwise specified, the application rate for acceptance testing
is 7.5 m2/L for Type I materials and 5 m2/L for Type II materials. There are also quantitative
requirements for reflectance, drying time, yellowing in ultraviolet light, acid and alkali resistance, and
adhesion of tile cement placed over the curing compound.

ASTM C 156-95, Test Method for Water Retention by Concrete Curing


Materials(18)
Top < Prev Main 3 4 5 6 7 8 9 10 11 12 Next > >>

http://www.fhwa.dot.gov/publications/research/infrastructure/pavements/p... 10/29/2015
Appendix A: Annotated Listof Pertinent Standards and Committee Reports... Page 8 of 19

This test method measures the moisture retention properties of curing compounds and sheet materials
by measuring mass loss at 72 h of a standard mortar specimen coated with the material under test.
Test conditions are 37.8 °C, 32 percent RH, and airflow sufficient to cause a water evaporation rate of
2.0 to 3.4 g/h from a free-water surface. The coverage rate for curing compounds is 5 m2/L or
according to manufacturer's requirements. Application method is according to manufacturer's
guidance.

This test method, or slight variants of it, is the most commonly used method for evaluating curing
compounds for water retention. The test method is often criticized for lack of precision. The published
within-laboratory standard deviation is 0.13 kg/m2. A laboratory would be expected to duplicate test
results to within a range of 0.36 kg/m2. The between-laboratory standard deviation is 0.30 kg/m2. Two
laboratories would be expected to duplicate test results to within a range of 0.84 kg/m2. Work is
underway to improve the precision of the test method.

ASTM C 1151-91, Test Method for Evaluating the Effectiveness of Materials


for Curing Concrete (withdrawn)(27)

This test method, like C 156, is intended to test curing compounds and sheet materials.(18) This test
method is based on measurement of water absorption by a cured sample of mortar, comparing the
absorption of the exterior surface with an interior surface exposed by cutting a specimen. The concept
behind the method is that a poor quality curing compound will allow the surface to dry, resulting in a
less compact microstructure, and hence more water absorption relative to the interior of the specimen,
which is not sensitive to the quality of curing compound. Senbetta (1994) reviews the development of
this test method. There is little data on its precision.(52) A within-laboratory standard deviation is
reported, but this was the result of a single laboratory's effort. When expressed as a coefficient of
variation, the precision is 18.6 percent, using the recommended limit of 3.7 by 10-6 cm2/s as the basis
for the calculation. There is no information on the between-laboratory precision. This method is not
apparently widely used for acceptance testing of curing materials, although water absorption test
methods are widely recommended in the literature as a test to measure the quality of curing in the
near-surface zone of concrete.

ASTM C 171-97. Specification for Sheet Materials for Curing Concrete(17)

The scope of this specification is for sheet materials for use in moisture retention and in minimizing
temperature rise due to solar radiation. For moisture retention, it cites the 0.55 kg/m2 water-loss
requirement at 72 h used for curing compounds, determined according to C 156.(18) There are also
requirements on physical properties that address durability consideration and a reflectance
requirement for white sheet materials.

American Association of State Highway and Transportation Officials


(AASHTO)
AASHTO has its own set of materials specifications and test methods. These include specifications M
182(20) for burlap, M 171-97(17) for sheet materials, and M 148-97(24) for curing compounds. The only
test method pertinent to curing is T 155-91.(55)

M 171(17) is identical to ASTM C 171-95(99) and M 148(24) is identical to ASTM C 309-94(23), except that
SI units are the preferred standard units of measure. Test method T 155(55) is identical to ASTM C
156-95(18). Specification M 182 for burlap is a uniquely AASHTO standard.(20)

AASHTO also publishes a "Guide Specification for Highway Construction,"(33) a "Quality Assurance
Guide Specification,"(100) and a "Construction Manual for Highway Construction."(101) All of these
contain guidance on curing.
Top < Prev Main 3 4 5 6 7 8 9 10 11 12 Next > >>

http://www.fhwa.dot.gov/publications/research/infrastructure/pavements/p... 10/29/2015
Appendix A: Annotated Listof Pertinent Standards and Committee Reports... Page 9 of 19

AASHTO M 182-91, Specification for Burlap Cloth Made from Jute or Kenaf(20)

The scope of this specification covers burlap for use in curing concrete. Four classes are defined
according to the density (expressed in the non-SI units of ounces per square yards) of the material.
There are quantitative requirements on the physical properties of the material (density, thread counts
and on minimum widths and lengths of pieces) and qualitative requirements on defects. There are no
performance requirements on burlap's suitability as a curing material.

ASHTO Guide Specification for Highway Construction(33)

Division 500 covers rigid pavements. Curing information is in Section 501.03 on Construction,
paragraph M. The basic requirement is to cure the concrete for at least 3 days, starting immediately
after the finishing operation. It requires avoiding exposing concrete for more than 30 min at any time
during the curing operation. Fogging is required for curing until the final curing method is in place.

Placing concrete is limited to ambient temperatures between 10 and 30 °C. The concrete must be
protected (presumably from freezing) for at least 10 days or until a flexural strength of 15 MPa is
achieved (AASHTO T 97).(102) Protection with blankets is required if the temperature drops below 2 °C.

Four curing methods are allowed, as described below. There is no guidance for choosing among them:

1. Impervious membrane method (curing compounds). Curing compound may only be applied in
dry weather and applied with a fully atomized spray equipped with a tank agitator and wind
guard. An application rate of 3.5 m2/l is required. Hand spraying of irregular shapes is allowed.
2. White opaque polyethylene film.
3. Burlap. Two layers are required, saturated with water before placing.
4. Waterproof paper.

Division 800, Section 808 is on concrete structures. Paragraph I deals with curing including guidance
on bridge decks.

General guidance is to start curing immediately after free water has left the surface of the concrete and
finishing is complete. Curing is to continue for 7 uninterrupted days, 10 days when more than 10
percent (by mass) pozzolan is used. Curing time can be reduced if field-cured test cylinders indicate
that 70 percent of specified strength has been achieved. In hot weather, water is applied to surfaces
that have been previously treated with curing compound or that are covered with forms until cooling is
no longer needed.

Five curing methods are allowed, but there is no guidance on choosing among them:

1. Forms in place. Retain forms in place without loosening them for the cure.
2. Water method. Keep surface wet by ponding, spraying, or continuously wetting materials.
3. Liquid membrane-forming curing compound. Type 2 (white pigmented) is allowed only on
bridge decks, on surfaces that will not be exposed to view, or on other specially approved
locations. The minimum application rate is 14 m2/l. Application must begin as soon as surface
water has disappeared, using a power applicator in one or two coats. The second coat must be
applied within 30 min of the first. Hand powered application may be used for small, irregular
areas.
4. Waterproof cover method (sheeting). These are allowed only when they can be secured against
wind or other disturbance. There is additional guidance on minimum overlap, sealing joints, and
damage.
5. Steam or radiant heat. This guidance applies to precast products only, where the curing is done
at the manufacturing facility. Detailed requirements are given on rate of heating, use of sheeting
or curing compounds to retain moisture during steam curing, and other details of the procedure.
There is no guidance on maximum curing temperature.

There is special guidance on curing bridge decks. Bridge decks are to be cured with a combination of
curing compound and water. Type 2 (white pigmented) curing compound is required, with application
starting immediately
Top after
< Prevfinishing
Main is 3complete.
4 5Water
6 curing
7 8is applied
9 10not 11
more12thanNext
4 h >after>>

http://www.fhwa.dot.gov/publications/research/infrastructure/pavements/p... 10/29/2015
Appendix A: Annotated Listof Pertinent Standards and Committee Repo... Page 10 of 19

finishing. There is no additional guidance on length of cure other than the 7 to 10 days given in the
general guidance, above.

AASHTO Quality Assurance Guide Specification(100)

This standard was published 1996, but has not been balloted by AASHTO, so it is not an official

AASHTO guide or standard. Section QA-501 addresses portland cement concrete pavement. Curing is
not specifically addressed in the body of the document. Compressive strength, thickness, and ride are
the three major items addressed in this document.

Appendix A is a "Guide for Quality Control and Acceptance Requirements for Portland Cement
Concrete." It states that the contractor must have a quality control plan that describes tests and test
frequencies. It also states that the plan must address all elements that affect the quality of structural
concrete, listing "Finishing and Curing" as one of them. Otherwise, there is no guidance on curing
issues.

AASHTO Construction Manual for Highway Construction(101)

This book is intended to be a guide to State highway departments in writing their own construction
manuals. Section 501.03 deals with construction requirements. Paragraph O addresses curing, but
only directs the reader to project specifications for guidance. Section 501.06 deals with inspection and
instructs the inspector to check curing application and to keep a diary, but there is no specific
guidance. Section 707 deals with sampling and testing frequency for materials. There is no mention of
curing.

U.S. Army Corps of Engineers (USACE)


USACE guidance is contained in the Corps of Engineers Guide Specifications (CEGS), technical
manuals (TM), engineer manuals (EM), and test methods and specifications. Test method and
specifications are normally ASTM standards, however, there are some standards that are unique to
the USACE. These have an alphanumeric prefix of "CRD-C." In the relatively recent past, guide
specifications were distinct for military and civil construction, having designations of CEGS and Civil
Works Guide Specification (CWGS), respectively. There is currently an effort to consolidate these into
a single set of standards (all designated CSGS), but this is not yet complete. The two guide
specifications described below have yet been consolidated and their titles suggest duplication.
Guidance is largely the same, with the noted exceptions.

CEGS 03300-95, Guide Specification for Cast-in-Place Structural Concrete(19)

Section 2.4 on curing materials, gives specifications for curing compounds and for burlap. Curing
compound must meet ASTM C 309, Type 1-D (fugitive dye) or Type 2 (white pigmented).(23) For
surfaces that are to be painted, or are to receive bituminous roofing, or waterproofing, or floors that are
to receive adhesive applications of resilient flooring, only styrene acrylate or chlorinated rubber
compounds meeting Class B requirements can be used. Type 1-D curing compound shall have the
reflective requirements of C 309 waived.(23) AASHTO M 182 for burlap and cotton mat is cited.(20)
Curing water shall be fresh, clean, potable, and free of injurious amounts of oil, acid, salt, or alkali,
except that nonpotable water may be used if it meets the requirements of USACE specification CRD-C
400.(16) This specification calls for tests on strength development and staining.

Paragraph 3.15 describes required practice. A general caution is given that concrete shall be protected
from premature drying, extremes in temperature, rapid temperature change, mechanical damage or
effects of flowing water throughout the curing period. The curing period is 3 days for concrete
containing Type III cement (ASTM C 150) and 7 days for other concrete.(44) Temperature of air and
forms in contact with concrete must be above 10 °C for the first 3 days and above 0 °C for the
remainder of the curing
Top period.
< Prev If the 3temperature
Main 4 5 is6less7than8 0 °C,
9 then
10 measures
11 12 must
Next be
> taken
>> to

http://www.fhwa.dot.gov/publications/research/infrastructure/pavements/p... 10/29/2015
Appendix A: Annotated Listof Pertinent Standards and Committee Repo... Page 11 of 19

ensure that the concrete is kept at 5 °C or above for the 7-day period. On removal of protection,
temperature at 50 mm inside concrete shall not differ from ambient by more than 13 °C.

Apart from the exceptions listed in section 2.4 on compatibility with coatings (described above) moist
curing shall be used on areas that are to receive hardeners, paint, or other applied coating. Concrete
containing silica fume shall be cured by fog misting during finishing, followed immediately by
continuous moist curing.

For moist curing, wooden forms are to be kept continuously wet. In hot weather, nonsupporting steel
forms shall be loosened and the formed surface kept wet. Burlap and mats shall be completely
saturated before application to the concrete surface. When ponding is used, temperature of the water
shall no be more than 10 °C cooler than the concrete.

On slabs, curing compound shall be applied as soon as bleed water disappears, with tops of joints
sealed to prevent curing compound from seeping in and moisture being lost. Curing compound shall
be applied in a two-coat continuous operation at a minimum pressure of 500 kPa with an application
rate of not more than 10 m2/L for each coat, with the second coat applied perpendicular to the first. If it
rains within 3 h, the entire application must be redone. Surfaces on which nonpigmented curing
compound are used shall be shaded from direct sun for the first 3 days.

Except for plastic coated burlap, impervious sheeting alone shall not be used for curing. Such
impervious sheeting shall only be used on horizontal or nearly horizontal surfaces. Additional guidance
is given on details of use.

Paragraph 3.17.9 gives guidance on curing inspection. Moist curing inspection shall occur once per
shift or not less than two times per day, including nonworkdays. Moisture condition is recorded. If an
area is found to be dry, corrective action is taken and curing extended 1 day. When curing compound
is used, the contractor verifies that it is properly mixed. At end of each operation, the contractor shall
estimate the quantity of curing compound used and the surface area covered. When the calculated
rate of application is below that specified (no tolerance given) or is not uniform, the entire surface must
be sprayed again. Sheets are inspected once per shift and once per day on nonworkdays, noting
conditions of sheets, laps, and joints. If deficiencies are found, they are repaired and curing extended
by 1 day. Reports are completed in writing daily, and weekly summaries are prepared.

CEGS 03301-94, Guide Specification for Cast-in-Place Structural Concrete for


Civil Works(103)

The major difference between CEGS 03300(19) and 03301(103) is in the guidance on duration of curing.
CEGS 03301 gives considerably more detail with respect to differences among cementitious materials.
The following is excerpted from that standard:

Type III portland cement......................................................................................3 days

Portland cement when accelerator is used to achieve high early strength, except when fly
ash or ground granulated blast furnace slag (GGBFS) is
used.............................................................................3 days

Type I portland cement........................................................................................7 days

Type IS or Type IP cement..................................................................................7 days

Portland cement blended with silica fume.............................................................14 days

Type II portland cement.......................................................................................14 days

Portland cement blended with 25 percent or less fly ash GGBFS............................14 days

Portland cement blended with more than 25 percent fly ash or GGBFS....................21 days

Top < Prev Main 3 4 5 6 7 8 9 10 11 12 Next > >>

http://www.fhwa.dot.gov/publications/research/infrastructure/pavements/p... 10/29/2015
Appendix A: Annotated Listof Pertinent Standards and Committee Repo... Page 12 of 19

CSGS 02753 Guide Specification for Heavy Duty Pavements(104)


This guide specification covers airfield pavements as well as other heavy-duty pavements. It directs
that pavement be cured for at least 7 days. Three methods are allowed: membrane curing (curing
compounds), moist curing, and impervious sheet curing.

Guidance on membrane curing directs that curing compound be applied as soon as free water has
disappeared from the surface after finishing. If evaporation is high and bleeding has not stopped, then
fog spray shall be used to keep the surface wet until the concrete reaches time of setting and bleed
has stopped. No instructions on how to determine these conditions and events are included.

Curing compound is required to meet the USACE specification CRD-C 300,(84) which is a more
stringent specification that ASTM C 309(23) (see description below). Some manufacturers advertise a
line of curing compounds that meet this requirement.

The concrete surface shall not be dry on application of curing compound and additional moistening
may be necessary to avoid this condition. Curing compound must be applied with power equipment
that spans the entire width of the pavement. Equipment must be fitted with mechanical agitation to
prevent settling of solids in the storage tank. Equipment shall be well maintained. An approved quality
assurance system is required to insure a continuously wet condition.

Application rate is 5.0 m2/L (±5 percent) in either one or two coats. The dried membrane shall be free
of cracks or pin holes (noncompliance requires reapplication). If heavy rainfall occurs within 3 h of
application, then the curing compound must be applied again. Instructions are included for dealing with
hand spraying of irregular areas, for repairing damaged areas, and for spraying after joint cutting.
Contingency curing capability is required to be on site in the event of failure of curing compound
application equipment.

Moist curing must start immediately after finishing. Methods include ponding, sprinkling, wet mats or
burlap, and wet plastic coated burlap.

Guidance on sheet curing focuses almost exclusively on sizes of sheets and overlap of sheets, and
details of covering exposed edges.

Army TM 5-822-7 (Air Force AFM 88-6, chapter 8(105)). Practice for Concrete
Pavements (1987)(25)

As part of general guidance on placing, ACI 306R(14) is referenced for cold weather concreting
(temperatures below 4 °C) and ACI 305R(12) is referenced for hot weather concreting (temperatures
above 32 °C). Calcium chloride is allowed as an accelerator in cold weather. In hot weather, it is
recommended to avoid placing when evaporation rates are in excess of 1.0 kg/m2/h as determined
from the evaporation rate nomograph in ACI 308(31). It is further suggested that an evaporation rate of
0.75 kg/m2/h would be a safer limit to avoid plastic shrinkage cracking. Concrete should not be placed
when concrete temperature exceeds 32 °C or when the air temperature is less than 4 °C.

In the section on curing, it is cautioned that all equipment and supplies must be on hand before
concreting begins to insure no delays in application of moisture retention and temperature control
measures. In general, pigmented curing compound is required. Equipment for applying curing
compound must be power driven and constructed so as to straddle the newly paved lane and to give
uniform and complete coverage. Nozzles must be surrounded by a hood to prevent wind from blowing
the spray. Hand-operated pressure sprayers are allowed on odd widths and shapes, and on edges
exposed by form removal. Curing compound must form a continuous void-free membrane and be
maintained throughout the curing period. No guidance is given on how to determine this condition. No
guidance is given on the length of the curing period.

Where experience has shown that curing compound alone does not prevent shrinkage cracking, then
a combination of curing compound and moist curing may be specified.
Top < Prev Main 3 4 5 6 7 8 9 10 11 12 Next > >>

http://www.fhwa.dot.gov/publications/research/infrastructure/pavements/p... 10/29/2015
Appendix A: Annotated Listof Pertinent Standards and Committee Repo... Page 13 of 19

Low melting point wax-based curing compounds should be avoided if the concrete surface is to be
painted.

EM 1110-2-2000, Practice for Concrete in Civil Works Structures (February 94)


(8)

Curing is covered in chapter 8 on "Concrete Construction." As part of the general guidance, it is


recommended that the contractor submit a plan for curing before construction begins. It emphasizes
that positive curing procedures must be used. Form curing-where no additional water is added-is not
acceptable. Forms left in place must be kept continuously wet. Water cannot have staining capability
and hand sprinkling is not satisfactory, except as an emergency procedure.

Membrane-forming curing compound is particularly recommended because of ease of inspection.


Uneven application is easily detected visually. When nonpigmented curing compound is used because
of aesthetics, an inspector must be on hand to check uniformity of application, although there is no
guidance on how to do this. When using nonpigmented curing compound and temperatures are above
32 °C, concrete must be shaded for 3 days. Compressed air lines must have traps to prevent moisture
or oil from contaminating the curing compound. Ordinary, hand-held garden type sprayers are not
satisfactory.

In cold weather concreting, as defined in ACI 306R(14), concrete temperatures should be monitored at
several locations, particularly at corners and should be protected from cycles of freezing and thawing
until it reaches a strength of 24 MPa. Drying is not likely to be a problem in cold weather unless
protection systems create a particularly dry or warm condition. Precautions should be taken if concrete
is warmer than 15 °C and exposed to air warmer than 10 °C.

During hot weather concreting, as defined in ACI 305R(12), precautions against plastic shrinkage
cracking should be taken if evaporation rates exceed 1.0 kg/m2/h, as determined from the evaporation
rate nomograph or as determined by direct measurement of evaporation from an open dish. Moist
curing is recommended as the best way to prevent plastic shrinkage cracks in hot weather. There are
no maximum limits on concrete or ambient temperatures, but general guidance on hot weather
concreting is provided.

For curing high strength concrete, water curing is recommended, particularly at early ages and when
water-cement ratios are below 0.4.

As part of the concrete report required after project completion, a section on curing methods,
inspections, and nonconformances is recommended.

CRD-C 300-90. Specifications for Membrane-Forming Curing Compounds for


Curing Concrete(84)

This specification closely resembles ASTM C 309(23) except for the water-retention requirement
(actually a water-loss requirement). The specification requires no more than 0.31 kg/m2 loss at 7 days.
Curing compounds meeting this requirement are normally specified for airfield pavements. Most other
USACE specifications require curing compounds that meet ASTM C 309.(23) Several manufacturers
make a curing compound complying with CRD-C 300, and this is indicated in the product literature.

CRD-C 302-79. Test Method for Sprayability and Unit Moisture Loss Through
the Membrane Formed by a Concrete Curing Compound(106)

This test method closely resembles ASTM C 156(18) except that the conditions in the curing cabinet
require an airflow of 10 m/s (C 156(18) requires sufficient air flow to produce a target evaporation), and
the test period is 7 days.

Top < Prev Main 3 4 5 6 7 8 9 10 11 12 Next > >>

http://www.fhwa.dot.gov/publications/research/infrastructure/pavements/p... 10/29/2015
Appendix A: Annotated Listof Pertinent Standards and Committee Repo... Page 14 of 19

CRD-C 400-63, Requirements for Water for Use in Mixing or Curing Concrete
(16)

Guidance on curing water is that it "... must be free of materials that significantly affect the hydration of
reactions of portland cement or that otherwise interfere with the phenomena that are intended to occur
during the curing of concrete," (p. 1). There is no test method or quantitative requirement on this
interference. However, when the same statement is used in the context of specifying mixing water, the
requirement is a comparison of strength development of 50.8 mm mortar cubes made with the water in
question versus strength of cubes made with deionized water.

Other National Standards

British Standards Institution (BSI)

British Standard, BS 8110 (1997), "Structural Use of Concrete: Part 1. Code of practice for design and
construction" addresses curing in Section 6 titled, "Concrete, materials, specification, and
construction."(40)

Curing and protection should start immediately after the compaction of the concrete to protect it from:

• Premature drying out, particularly by solar radiation and wind.


• Leaching out by rain and flowing water.
• Rapid cooling during the first few days after placing.
• High internal thermal gradients.
• Low temperature or frost.
• Vibration and impact, which may disrupt the concrete and interfere with its bond to the
reinforcement.

Minimum length of curing required depends on type of cement, ambient conditions, and temperature of
concrete. The guidance is reproduced below (table 19) with annotations in italics relating cement types
to the nearest ASTM equivalent. Surface temperature should not be allowed to fall below 5 °C during
this time.

Table 19. Reproduction of table 6.1 of BS 8110, Part 1(40), Section 6 on minimum periods of

curing and protection.

Minimum periods of curing and


protection

Ambient Average surface temperature


Type of cement conditions after of concrete
casting
t °C (any temperature
5 to
between 10 °C and 25
10 °C
°C)

PC 42.5 or PC 52.5 to BS 12 Average Days Days

SRPC 42.5 to BS 4027 4


Top < Prev Main 3 4 5 6 7 8 9 10 11 12 Next > >>

http://www.fhwa.dot.gov/publications/research/infrastructure/pavements/p... 10/29/2015
Appendix A: Annotated Listof Pertinent Standards and Committee Repo... Page 15 of 19

Minimum periods of curing and


protection

Ambient Average surface temperature


Type of cement conditions after of concrete
casting
t °C (any temperature
5 to
between 10 °C and 25
10 °C
°C)

60

(t+10)

80
Poor 6
(t+10)

80
Average 6
(t+10)
All cements in table 1 of BS 5328, Part 1
(1997), except those listed above. Blended 140
cements, ASTM C 595(60), C 1157(53) Poor 10
(t+10)

All Good No special requirements

Note 1. Abbreviations for the type of cement used are as follows:

• PC 42.5: Portland cement (class 42.5)(see BS 12)-ASTM C 150(44) Type I.


• PC 52.5: Portland cement (class 52.5)(see BS 12)-ASTM C 150(44) Type III.
• SRPC 42.5: Sulfate-resisting portland cement (class 42.5)(see BS 4027)-ASTM C 150(44)
Type V.

Note 2. Ambient conditions after casting are as follows:

• Good: damp and protected (relative humidity greater than 80 percent; protected from sun and
wind.
• Average: intermediate between good and poor.
• Poor: dry or unprotected (relative humidity less than 50 percent; not protected from sun and
wind).

Five curing methods are allowed. There is no guidance on choosing among them:

• Maintaining formwork in place.


• Covering with sheet materials.
• Using a compound with an efficiency index of 90 percent, according to BS 7542.(28)
• Covering with damp absorbent material.
• Continuous or frequent wetting.

BS 7542 is the test method used to test curing compounds.(28) This method is very much like ASTM C
156, in that a standard mortar specimen is coated with curing compound, then exposed to a hot, dry
conditions, and mass loss measured.(18) However, instead of reporting simple mass loss, as in C 156,
the method reports mass loss relative to the mass loss of an uncoated control specimen, in units of
percent.(18) TheTop
property is called
< Prev Main the3"curing
4 efficiency
5 6 index."
7 8 A value
9 10of 0 11
percent
12 indicates
Next > that
>> the

http://www.fhwa.dot.gov/publications/research/infrastructure/pavements/p... 10/29/2015
Appendix A: Annotated Listof Pertinent Standards and Committee Repo... Page 16 of 19

curing compound-treated specimen lost as much water as the control. An index result of 100 percent
means that the curing compound-treated specimen lost no water. A value of 90 percent is considered
acceptable. Test conditions are: temperature 38 °C, 35 percent RH, and wind velocity of 0.5 m/s. The
test age is 3 days. Precision is not given in the test method, but within-laboratory standard deviations
of about 4.5 percent for three materials with curing efficiencies higher than 80 percent, and 11 percent
for one material with a curing efficiency of 56 percent were reported by Cabrera, Gowiripalan, and
Wainwright (1989).(107)

Euro-International Committee for Concrete (CEB)-International Federation for


Prestressing (FIP)

A summary of the guidance on curing in the Euro-International Committee for Concrete (CEB)-
International Federation for Prestressing (FIP) Model Code (1990)(41) is taken from Meeks and Carino
(1999)(4). The title of the section in the code is "Curing and Protection." This code only considers the
moisture balance aspect of curing. Time-temperature considerations are not addressed. Protection
involves avoiding effects of rain or flowing water, early freezing, thermal stresses, vibration, and
impact.

It is recognized that curing has only a minor effect on the strength development of concrete, with the
exception of very thin sections, because the core of thick sections maintains enough water for
hydration to occur even without any deliberate curing. Lack of curing has a major effect on the
properties of surface or near-surface concrete.

The recognized methods of curing are:

• Keeping formwork in place.


• Covering with plastic films.
• Placing wet coverings.
• Sprinkling with water (at temperatures above freezing).
• Applying curing compounds.

The code notes that not all methods work equally well; therefore, it is important to have frequent
inspections, although no specific guidance is given. It is also noted that methods that involve addition
of water give a concrete with a denser pore structure than methods that only retain water. For low
water-cement ratio concretes, it is recommended that a type of curing that involves adding additional
water be used.

Duration of curing for concrete in normal service environments (humid, wet, seawater, frost) is
prescribed according to ambient conditions during curing and rate of development of impermeability in
the concrete. Ambient conditions are categorized into three levels. Condition I is defined as exposure
to no direct sun and RH greater than 80 percent. Condition II is defined as exposure to medium sun,
medium wind velocity, or RH between 50 and 80 percent. Condition III is defined as exposure to strong
sun, high wind velocity, or RH of less than 50 percent. No quantitative values of illumination or wind
velocity are given.

Rate of development of impermeability is prescribed according to type of cement and the water
cement ratio of the concrete. Curing times range from 1 to 8 days depending on the combination of
these factors. The tabulation of this information is reproduced in table 20. This guidance is for ambient
temperatures of approximately 20 °C. The maturity method is recommended to estimate required
curing time for temperatures higher or lower than this. Such calculations result in an approximate
doubling of the curing time at 10 °C. For temperatures around 30 °C, maturity calculations result in an
approximate halving of the curing time. For pozzolan-containing concretes, curing time is to be
increased by 1 or 2 days. For severe chemical exposures, it is recommended that curing time be
extended by 3 to 5 days.

European Committee for Standardization (CEN)

Top < Prev Main 3 4 5 6 7 8 9 10 11 12 Next > >>

http://www.fhwa.dot.gov/publications/research/infrastructure/pavements/p... 10/29/2015
Appendix A: Annotated Listof Pertinent Standards and Committee Repo... Page 17 of 19

Information on European standards for curing was taken from Litzner and Becker (1999).(108) A table
on curing requirements was presented in this reference, cited as being taken from EN 206.(42) Table
21 is a reproduction of this table. Exposure classes XO and XC1 are for dry concrete inside buildings.

Table 20. Reproduction of Table d.10 on minimum duration of curing in days for T >10 °C,

exposure classes 2a; 2b; 4a and 5a, according to Table d.1 cement CE I.(108)

Very
Rate of development of impermeability of concrete Rapid Medium Slow
Rapid

I No direct sunshine, relative


humidity of surrounding air >80 1 2 3 4
percent

Exposed ambient II Exposed to medium sunshine or


conditions during and medium wind velocity or relative 2 3 4 5
after curing humidity 50-80 percent

III Exposed to strong sunshine or


high wind velocity or relative humidity 3 4 6 8
less than 50 percent

Rate of development of impermeability of concrete

Water-cement Class of
Rate of development of impermeability
ratio cement*

0.5-0.6 RS
Very rapid
<0.5 RS; R

0.5-0.6 R
Rapid
<0.5 N

0.5-0.6 N
Medium
<0.5 SL

Slow All other cases

Table 21. Minimum curing period for EN 206 exposure classes other than XO and XC1.(42)

Surface concrete Minimum curing period, days*, + for a concrete strength


temperature (T), ° C development r = fcm,2/fcm,28

r ≥ 0.15 r < 0.15 Very


r ≥ 0.50 Rapid r ≥ 0.30 Medium
Slow Slow

T ≥ 25 1.0 1.5 2.0 3.0

25 > T ≤ 15 1.0 2.0 3.0 5

15 > T ≤ 10 2.0 4.0 7 10

10 > T ≤ 5‡ 3.0 6 10 15
Top < Prev Main 3 4 5 6 7 8 9 10 11 12 Next > >>

http://www.fhwa.dot.gov/publications/research/infrastructure/pavements/p... 10/29/2015
Appendix A: Annotated Listof Pertinent Standards and Committee Repo... Page 18 of 19

Surface concrete Minimum curing period, days*, + for a concrete strength


temperature (T), ° C development r = fcm,2/fcm,28

Notes:

* Plus any period of setting exceeding 5 h.

+ Linear interpolation between values in the rows is acceptable.

‡ For temperatures below 5 °C, the duration should be extended for a period equal to the time
below 5 °C.

Canadian Standards Association (CSA)

The Canadian guidance on concrete curing is in CSA23.1-94,(109) as summarized by Meeks and


Carino (1999).(4) The basic curing requirement is for 3 days moist curing, with temperatures greater
than 10 °C, or for the time required to reach 35 percent of the specified 28-day strength. Field cured
specimens or nondestructive methods may be used. For aggressive chemical or abrasive service
conditions, curing time should be increased by 4 days over the basic requirement or to the time
necessary to reach 75 percent of specified 28-day strength. There is no quantitative guidance for
curing of concretes that develop strength slowly, but there is a general caution about the need to
account for this in project specifications. Reference is made to ACI 308 for curing methods and details
of practice.(31)

Norway

Norwegian Standard 3420, as reported in Meeks and Carino (1999)(4) addresses concrete curing
requirements, as summarized in Meeks and Carino (1999).(4) Concrete shall be kept moist for 3 days
after setting, either with water or by prevention of evaporation. If the water-cement ratio is less than
0.40, then water curing must be used. For special requirements on impermeability, absence of cracks,
and resistance to chemical attack, 14 days of curing is required. No artificial drying is allowed until 70
percent of specified 28-day strength is reached. Special care is advised with use of silica fume or
large amounts of fly ash to prevent early drying of the concrete surface and resultant plastic shrinkage
cracks. In very aggressive environments, maximum curing temperature is 65 °C.

Australia

Australian Standard 3600 (AS 3600, 1994(48)) addresses curing, as summarized by Meeks and Carino
(1999).(4) Guidance is based mostly on severity of exposure condition in service. Exposure is classified
according to climate zones (temperate, tropical, and arid) and environmental aggressiveness within
each of these. Curing guidance is then based on minimum curing time or, alternatively by minimum
compressive strength. For relatively mild exposures, at least 3 days moist curing is required, or if
accelerated curing is used, curing to a compressive strength of 15 MPa is required. Design strengths
of 20 to 25 MPa, depending on details of exposure, are required. For more aggressive exposures, at
least 7 days curing under ambient conditions is required, or if accelerated curing is used, curing is
required to a strength of 20 MPa for a 32 MPa design strength, to 25 MPa for a 40 MPa design
strength, or to 32 MPa for a 50 MPa design strength. The design strengths vary according to exposure
class.

The Roads and Traffic Authority of New South Wales (RTA)(110) has established field performance
criteria for curing. Water sorptivity is used to determine effectiveness of curing on site. See Chirgwin
and Ho (1995)(111) for the test method and Ho and Chirgwin (1996)(112) for the performance
specification. Table 22 is reproduced from the latter reference. Concretes containing large amounts of
slag must be cured
Top for an additional
< Prev Main 73 days
4 in moderate
5 6 7to severe
8 9exposures.
10 11 12 Next > >>

http://www.fhwa.dot.gov/publications/research/infrastructure/pavements/p... 10/29/2015
Appendix A: Annotated Listof Pertinent Standards and Committee Repo... Page 19 of 19

Silica fume concrete is required to be cured with water for 3 to 6 days. There is also a limit on crack
width on bridge decks.

Table 22. Reproduction of RTA specification requirements from Ho and Chirgwin (1996).(112)

Minimum Minimum
Exposure Maximum Maximum
a
binder period of
water- sorptivity
content, standard
Classification Environment binder ratio depth, mm
kg/m3 curing, d

Dry climate, no
A industry, 0.56 7 (7)b 45
nonaggressive

Industrial areas,
B1 320 0.56 7 (7) 35
inland

Close to coast or
B2 permanently in salt 390 0.46 7 (15) 17
water

C Tidal/splash zone 450 0.40 14 (22) 11


a
Binder = cementitious materials
b
Number of days in parentheses are for high slag cement

State (DOT) Standards


A limited survey of State DOT standards showed that States differ in many of the details of curing
practice. A more thorough review of these standards was done; the results are summarized in
appendix B.

Page Owner: Office of Research, Development, and Technology, Office of Infrastructure, RDT

Topics: research, infrastructure, pavements and materials


Keywords: research, infrastructure, pavements and materials, Curing, Portland cement concrete
paving, curing compound, evaporation reducers, initial set, final set, plastic shrinkage
TRT Terms: research, facilities, transportation, highway facilities, roads, parts of roads, pavements
Scheduled Update: Archive - No Update needed

This page last modified on 01/04/2013

Top < Prev Main 3 4 5 6 7 8 9 10 11 12 Next > >>

http://www.fhwa.dot.gov/publications/research/infrastructure/pavements/p... 10/29/2015

You might also like