List 7706022024094802
List 7706022024094802
List 7706022024094802
JANUARY 2024
For any information-44951154 - Email : balkhawaja@ashghal.gov.qa List no.77.0 Last Revision 06/02/2024
Quality and Safety Department
JANUARY 2024
6 Combined ALMIX 9072 Mesaieed 24.98363 51.58314 240 AP1947 08-Feb-23 07-Feb-24 WC Gabbro QPMC Pen Woqod Woqod
Group Asphalt 60/70
Plant & Roads
Construction AP2011 14-Dec-23 13-Dec-24 BC- Gabbro QPMC Pen Woqod Woqod
A 60/70
AP2009 04-Dec-23 03-Dec-24 BC- Gabbro QPMC Pen Woqod Woqod
B 60/70
AP2016 23-Jan-24 22-Jan-25 BC- Gabbro QPMC PG76E- Membco Membco
B 10
AP2013 02-Jan-24 01-Jan-25 WC Gabbro QPMC PG76E- Membco Membco
10
7 Omega SPECO 08A-6019 Mesaieed 24.97964 51.57874 160 AP1960 11-Apr-23 10-Apr-24 WC Gabbro QPMC Pen Woqod Woqod
Engineering 60/70
For any information-44951154 - Email : balkhawaja@ashghal.gov.qa List no.77.0 Last Revision 06/02/2024
Quality and Safety Department
JANUARY 2024
For any information-44951154 - Email : balkhawaja@ashghal.gov.qa List no.77.0 Last Revision 06/02/2024
Quality and Safety Department
JANUARY 2024
For any information-44951154 - Email : balkhawaja@ashghal.gov.qa List no.77.0 Last Revision 06/02/2024
Quality and Safety Department
JANUARY 2024
17 QD-CPC LINTEC CSD- Lusail 25.45498 51.499806 240 AP1995 27-Aug-23 26-Aug-24 BC- Gabbro QPMC Pen Woqod Woqod
AP01 3000 A 60/70
AP1992 13-Aug-23 12-Aug-24 WC Gabbro QPMC Pen Woqod Woqod
60/70
AP1986 30-Jul-23 29-Jul-24 BC- Gabbro QPMC Pen Woqod Woqod
B 60/70
For any information-44951154 - Email : balkhawaja@ashghal.gov.qa List no.77.0 Last Revision 06/02/2024
Quality and Safety Department
JANUARY 2024
19 QAP-AP01 BENNINGHOVEN ECO Mesaieed 24.98356 51.58368 240 AP1988 09-Aug-23 08-Aug-24 BC- Gabbro QPMC Pen Woqod Woqod
3000/2009 A 60/70
AP1985 27-Jul-23 26-Jul-24 BC- Gabbro QPMC Pen Woqod Woqod
B 60/70
This list presents asphalt mixes, which are approved for PWA projects
Any of these approved mixes can be used at one or more than one project simultaneously
The project consultant (SC/ GEC) and the PWA Project Manager are advised to make sure that the contractor will start the process of
mix certificate renewal not later than three months prior to certificate expiry date, which includes the two months period required by the
quality department of Qatar General Organization for Standards and Metrology
These asphalt Plants they are not producing currently for PWA project
For any information-44951154 - Email : balkhawaja@ashghal.gov.qa List no.77.0 Last Revision 06/02/2024
Quality and Safety Department
JANUARY 2024
2 ALCAT Contracting Company AP02 MARINI P-P120070 Salwa 25.17557 51.44460 240 WC ACES Raetex PG76E- Successful 2019-0017444-
Industrial 10 7
Area St. 41 CRMB
3 CGC (Combined Group AP Sr. no 9072 ALMIX AP 9072 Mesaieed 24.98363 51.58314 240 WC ACES Membco PG76E- Successful 2020-0005445-
Contracting Company) 10 7
CRMB
4 TEYSEER Contracting Company AP01 MARINI CP14206 Mesaieed 25.386558 51.367021 240 WC ACES Membco PG76E- Successful 2021/0049380/1
Trading & Contracting Company 10
W.L.L. CRMB
5 AL DARWISH Engineering AP01 MARINI PP140006 Mesaieed 24.981326 51.582648 300 WC ACES Raetex PG76E- Successful 2020-0017742-
10 7
CRMB
6 QBC (Qatar Building Company) AP01 AMMANN AZ-62805 Salwa 25.16785 51.44739 320 WC Fugro Raetex PG76E- Successful 2020-0021668-
Industrial 10 7
Area, str. 47 CRMB
7 Marbu Contracting Co. W.L.L. Mesaieed AP ALMIX P9066 Mesaieed 24.98186 51.57842 240 WC ACES Raetex PG76E- Successful -
10
CRMB
For any information-44951154 - Email : balkhawaja@ashghal.gov.qa List no.77.0 Last Revision 06/02/2024
Quality and Safety Department
JANUARY 2024
10 Aljaber & Partners W.L.L AP02 AMMANN AZ-65091 Mesaieed 24.983435 51.58194 240 WC ACES Raetex PG76E- Successful 2020/0044061/1
10
CRMB
11 Quality Asphalt Products QAP-AP02 BENNINGHOVEN EC 40 300 Mesaieed 24.9793921 51.5771286 320 WC ACES Raetex PG76E- Successful 2022/0056805/1
/2019 10
CRMB
12 JH Construction AP05 AMMANN K185 Mesaieed 24.9816102 51.5815673 340 WC TECHLAB Raetex PG76E- Successful 2023/0006215/1
10
CRMB
BC- ACES Raetex PG76E- Successful 2022/0018839/1
B 10
CRMB
13 QD-CPC-NAF AP01 LINTEC CSD-3000 Lusail 25.45498 51.499806 240 WC Fugro Raetex PG76E- Successful 2018/0033416/7
10
CRMB
For any information-44951154 - Email : balkhawaja@ashghal.gov.qa List no.77.0 Last Revision 06/02/2024
Quality and Safety Department
JANUARY 2024
+974 Dynasol
5 Integrated Polymer Solution (IPS) New industrial area (N25.153627,E51.416315) info-integrated@polymerqa.com PG76E-10
44436429 Kumho
PWA Approved PMB Suppliers
For any information-44951154 - Email : balkhawaja@ashghal.gov.qa List no.77.0 Last Revision 06/02/2024
Quality and Safety Department
JANUARY 2024
1 MEMBCO AP01 Bright Future Tyre Recycling Factory New Industrial Area 5.154450 51.427367
2 RAETEX AP01 Bright Future Tyre Recycling Factory Mesaieed 24.982607 51.582931
This list included CRMB Producers approved to supply CRMB for PWA projects
The project Consultants (SC/GEC) and PWA Project Manager are advised to make sure Contractors and their Suppliers for asphalt
mixes (Asphalt Plants) will start the process of the preparation of CRMB Asphalt Mixes and submit them for verification to QSD and
for approval to the Engineer.
For any information-44951154 - Email : balkhawaja@ashghal.gov.qa List no.77.0 Last Revision 06/02/2024
Quality and Safety Department
JANUARY 2024
Pre-
Seq Asphalt Plant % Of RAP in each
Company Qualification
No. Location asphalt Mix
Status
1 TEYSEER Contracting Company Trading & Contracting Company W.L.L. AP01, Mesaieed 15 Successful
2 QBC (Qatar Building Company) Industrial Area 15 Successful
3 Combined Group Asphalt Plant & Roads Construction WLL Almix plant, P9072, Mesaieed 15 Successful
4 AL DARWISH Engineering Marini plant, PP140006, Mesaieed 15 Successful
For any information-44951154 - Email : balkhawaja@ashghal.gov.qa List no.77.0 Last Revision 06/02/2024