BOQ Final
BOQ Final
BOQ Final
600 STRUCTURES
CROSSING STRUCTURES
610 P1 Excavation
610 P1.1 Excavation of Soft Material Irrespective of Depth m3 883.52
610 P1.2 Excavation in Hard Material Irrespective of Depth m3
Backfilling
610 P2.2 Using Imported Selected Material(granular material) m3 328.00
603 P1.2 C 30, reinforced m3 277.30
603 P1 (4) Lean concrete (C-10) m3 27.85
604 P1.5 Grade 400 Reinforcement Tone 30.50
Channel Excavation m3 115.00