Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Sai Const.30 TS Ib BP-1

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

2500

2900
3000 1500

100 TON SILO


(02 NO.) R.C.C 14°
1100 WALL
G.L G.L
2400 9000
PLANT INSTALLATION FRONT VIEW
10 MTR. SCREW
CONVEYER (03 NO.) VIEW OF A-A
CEMENT HOPPER
WATER HOPPER

INCLINED CONVEYER
10600 Ø3500

718
INLINE BIN

4071
COLLECTOR
HOPPER 2900
4000
A 2000
2000

118
200 200 30.5°
1100 500 G.L.
G.L 500 G.L G.L G.L

11600

6700 4200 2643 3599 2475

11000 Ø3500

2475

CABIN P.C.C B-B VIEW


3000 X 3000 X 300 HEIGHT

9000
Ø3500

B 5028
2100 2100
8127
4197
Y
3904 1948 C/C 2585 C/C 2585 C/C 1948 C/C

Ø3500
2700

B
2200 1745 C/C
1900 C/C 2400

X Y
X X
4200 C/C 2643 C/C 3600 C/C 11600
6579 X

NOTE :-
1) CONTROL THE FOUNDATION DEPTH TO MEET THE
WATER TANK
NATURE OF SOIL BEARING CAPACITY (SBC) BY CUSTOMER. 10,000 LTR CAPACITY
2) DO NOT SCALE THE DRAWING.
3) IF ANY DOUBT PLEASE ASK TO ELSA.
4) WATER TANK 10,000 LTRS CAP.3000 X 2000 X 1800
MM DEEP FOR 8 HOURS CONTINUOUS RUNNING.
5) REQUIRED MATERIAL FOR EARTHLING. ELSA
5.1) 5 SQ. MM COPPER WIRE 25 MTR.
5.2) PERFORATED G.I PIPE 1 21" NB X 1 MTR. 3 NOS.
TOP VIEW
5.3) COAL 150 KG.
5.4) SALT 150 KG.
(PAGE NO.1)
5.5) EARTHLING PLATE 300 X300X 5 MM. 3 NOS.

You might also like