Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

ADC Part 7

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1 2 3

7500

750 3000 3000 750

1500 1500 1500 1500

BUS SHELTER ADDRESS PLATE TO FACE


ONCOMING TRAFFIC IN ACCORDANCE TO POWDER COATED ALUM. ’F’ TYPE CAPPING
LTA ARCHITECTURAL DESIGN CRITERIA
DRAWING NO. L/CFADC/AR/BS/0005 MS ANGLE ROOF FASCIA (T1)
LATEST REVISION

M.S. SHS (R2)


200

1000 1000 M.S. ’C’ CHANNEL RAFTER (R1)

LIGHT FITTING TO M&E SPECS

M.S. RHS POST (C1)


NEW OG BOX
(IP55) LOCATION
1000

SHALL BE SUBJECTED

–2692
TO SITE CONDITIONS

–2388
2300
AND POWERGRID’S APPROVAL
2170

NOTICE BOARD WITH ALUM. FRAME


C/W 4mm THK. TEMPERED GLASS 2 NOS 100mm HEAVY
(SHALL ALLOW CLEAR MOUNTING
LITTER BIN BY OTHERS
OF POSTERS OF SIZE 940 X 940,
TO BE IN FULL UNOBSTRUCTED
DUTY UPVC PIPES
CONC. SLAB COMPLETE WITH 25mm THK
VIEW THROUGH THE FRONT ALUM. BENCH
GLASS PANEL OF 900 X 900)
GRANOLITHIC FINISHES TO SO’S APPROVAL
LEAD IN 90 LONG
970

BEND PIPES FOR


450 (BENCH)

POWERGRID INCOMING

450
ALUM. BENCH

CABLING
150

FFL

6m PVC EARTH BONDING CABLE 6m PVC EARTH


IN 25mm HEAVY DUTY UPVC PIPE BONDING CABLE IN
25mm HEAVY
DUTY UPVC PIPE

TYPICAL EQUIPOTENTIAL BONDING DETAILS


FOR BUS SHELTER LTA Endorsement :

Scale 1:50

Project Title :

STANDARD INSTALLATION DETAILS

Drawing Title :

TYPICAL EQUIPOTENTIAL BONDING DETAILS


FOR BUS SHELTER

Designed Checked Approved

NURLY MALVIN HO MELVYN THONG

Scale Drawn Date

1:50 JULI JULY 2007

Drawing No. : Rev.

ADRIAN CHEONG/ MELVYN A


A DEC 2010 TAY K.C REVISED DETAIL
HADI WIJAYA THONG L/ROAD/MES/SD/1009
Rev. Date By Description Chk’d App’d
CAD File Name:LROADMES-SD1009A.dgn Sheet 1 of 1 A3

You might also like