Detail at 'B'
Detail at 'B'
Detail at 'B'
75
75
75
2.5% F.R.L. 2.5% 3.5% 2.5%
(a)
CLEAR HEIGHT
CLEAR HEIGHT
LHS 1.0m c/c HORI. & VERTI.
(H1)
600 mm THK.
1.0m c/c HORI. & VERTI. FILTER MEDIA
150THK. P.C.C. (M:15) 150THK. P.C.C. (M:15) SECTION `B-B' 150THK. P.C.C. (M:15) (c) CONSTRUCTION JOINT
100
(A) 150x150
HAUNCH
C
RETAINING WALL
INVERT LEVEL
(H2)
100
BASE SLAB
(F)
150
(G)
(E)
150
150THK. P.C.C. (M:15)
(D) (B) (C)
DETAIL AT `B'
(c)
B
RHS
CLE
AR S
600 mm THK.
(a)
TOP SLAB
PAN
FILTER MEDIA
100
200
PROPOSED LENGTH
OF BOX
CRASH BARRIER
DRAINAGE
SPOUT 100 300 150
150x150
HAUNCH
(c)
CONSTRUCTION JOINT
RETAINING WALL
600 mm THK.
FILTER MEDIA (c)
DETAIL AT `A'
RETAINING WALL
500 1500
250
(A)
CRASH BARRIER
CRASH BARRIER
600
500
TOP SLAB
(a)
LHS
B
DETAIL AT `C'
Center Line
Of Culvert
(L) OVERALL LENGTH (L)
RCC PARAPET
75
(a)
WEEP HOLES
CLEAR HEIGHT
RETAINING WALL
H1
FILTER MEDIA
600 mm THK.
RETAINING WALL CLEAR SPAN
(c) (c)
(b)
500 1500
FOOTPATH
H2
1500 500
VARIES
FOOTPATH
500 500 150THK. P.C.C. (M:15)
PLAN
SECTION `C-C'
Inter-Corridors, Feeder Routes and National Corridors (GQ and NS-EW Corridors) to NATIONAL HIGHWAY AUTHORITY OF INDIA, CHAITANYA PROJECTS CONSULTANCY PVT LTD. DESIGNED BY NILAY
MINOR BRIDGE AT CH.607+610
R1 12/06/2020 - -
C-5,2nd Floor, Plot No. 21-22, R.K.Tower, Sector-4,
improve the efficiency of freight movement in India under Bharatmala Pariyojana MINISTRY OF ROAD TRANSPORT & HIGHWAYS DRAWING N0.
NILAY
(Lot-6/Package-4) for National Corridor 19 (Panagarh-Palsit-Dankuni stretch up to NH-6
CHECKED BY R1
R0 10/10/2019 - - GOVERNMENT OF INDIA. Ph:- 0120-3223419, 4120472, Fax:- 0120-4110472
Connector) in the State of West Bengal Email:- chaitanya.projects@gmail.com APPROVED BY ASIF SCALE : NTS DATE : 12/06/2020
REVISION DATE STAGE REMARKS