Detail at 'B'

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1000 C.L.

OF SERVICE ROAD (LHS)


1007
C.L. OF MAIN CARRIAGE WAY (RHS) C.L. OF MAIN CARRIAGE WAY (LHS)
EARTHEN C.L. OF SERVICE ROAD (RHS) EARTHEN 1000 1000
SHOULDER SHOULDER 27450 EARTHEN EARTHEN
7000 15500
PROPOSED CARRIAGEWAY (MAIN CARRIAGEWAY + ACCESS LANE) SHOULDER SHOULDER
SERVICE ROAD VARIES 500 500 8500 EXISTING DECK WIDTH VARIES 7000
OPEN TO SKY
450
SERVICE ROAD (A)
2.5% F.R.L.

75

75

75
2.5% F.R.L. 2.5% 3.5% 2.5%

(a)

PROP. LENGTH PROPOSED LENGTH


PROP. LENGTH OF BOX
OF BOX
CLEAR HEIGHT
OF BOX RHS

CLEAR HEIGHT

CLEAR HEIGHT
LHS 1.0m c/c HORI. & VERTI.

(H1)
600 mm THK.
1.0m c/c HORI. & VERTI. FILTER MEDIA

150THK. P.C.C. (M:15) 150THK. P.C.C. (M:15) SECTION `B-B' 150THK. P.C.C. (M:15) (c) CONSTRUCTION JOINT

100
(A) 150x150
HAUNCH
C

RETAINING WALL
INVERT LEVEL

(H2)
100
BASE SLAB

(F)
150

(G)

(E)
150
150THK. P.C.C. (M:15)
(D) (B) (C)
DETAIL AT `B'

(c)
B
RHS

CLE
AR S
600 mm THK.

(a)
TOP SLAB

PAN
FILTER MEDIA

100
200
PROPOSED LENGTH
OF BOX

CRASH BARRIER
DRAINAGE
SPOUT 100 300 150

150x150
HAUNCH

(c)
CONSTRUCTION JOINT
RETAINING WALL

600 mm THK.
FILTER MEDIA (c)

DETAIL AT `A'

RETAINING WALL
500 1500
250
(A)
CRASH BARRIER

CRASH BARRIER

600
500
TOP SLAB

(a)
LHS

B
DETAIL AT `C'

Center Line
Of Culvert
(L) OVERALL LENGTH (L)

RCC PARAPET

75

(a)
WEEP HOLES

CLEAR HEIGHT
RETAINING WALL

1.0m c/c HORI. & VERTI.

H1
FILTER MEDIA
600 mm THK.
RETAINING WALL CLEAR SPAN
(c) (c)

(b)
500 1500
FOOTPATH

H2
1500 500
VARIES
FOOTPATH
500 500 150THK. P.C.C. (M:15)
PLAN

SECTION `C-C'

BOTTOM SIDE LENGTH HEIGHT


NOS. OF CLEAR TOP
SPAN (m) SPAN (m) (b) (m) WALL OF OF
SPAN HEIGHT (a) (m)
(SQUARE) (SKEW) (c) (m) RETAINING RETAINING
(m)
WALL WALL
(L) (m) (H1) (m)

1 1X7.85 1X15.7 2.75 0.825 0.875 0.550 5.475 3.650

PROJECT : CLIENT: CONSULTANT: DRAWN BY SHARIIK


DRAWING TITLE :-
Preparation of Detailed Project Report (DPR) for development of Economic Corridors, GENERAL ARRANGEMENT DRAWING FOR

Inter-Corridors, Feeder Routes and National Corridors (GQ and NS-EW Corridors) to NATIONAL HIGHWAY AUTHORITY OF INDIA, CHAITANYA PROJECTS CONSULTANCY PVT LTD. DESIGNED BY NILAY
MINOR BRIDGE AT CH.607+610

R1 12/06/2020 - -
C-5,2nd Floor, Plot No. 21-22, R.K.Tower, Sector-4,
improve the efficiency of freight movement in India under Bharatmala Pariyojana MINISTRY OF ROAD TRANSPORT & HIGHWAYS DRAWING N0.
NILAY
(Lot-6/Package-4) for National Corridor 19 (Panagarh-Palsit-Dankuni stretch up to NH-6
CHECKED BY R1
R0 10/10/2019 - - GOVERNMENT OF INDIA. Ph:- 0120-3223419, 4120472, Fax:- 0120-4110472
Connector) in the State of West Bengal Email:- chaitanya.projects@gmail.com APPROVED BY ASIF SCALE : NTS DATE : 12/06/2020
REVISION DATE STAGE REMARKS