Plan at El (+) 16.200/el (+) 15.500M Level: Up Up
Plan at El (+) 16.200/el (+) 15.500M Level: Up Up
Plan at El (+) 16.200/el (+) 15.500M Level: Up Up
BRACING BAY
B
PIPE HATCH PIPE HATCH PIPE HATCH
600
600
800
1200
1295
SHOE RACK
SD1 800 1000
1 DOOR UNDER HOLD 1385 5646
1200
1000 MAINTENANCE
800
ROOM
1200
1000
CONTROL EQUIPMENT ROOM(A/C) CONTROL ROOM
(A/C) SHIFT INCH.
EL (+) 16.200 AREA
(FFL)
3605
2600
1000
3540
1000 800 1000
SD
2
600
2000
800 1385
1535
T BOP
1600
ENGINEERING B-1 B-2
1365
1365
ROOM FOR #2
BRACING BAY (A/C) LVS-70"
BRACING BAY
C 1200
CCTV
1000
32"
STAIRCASE
UP LIFT
8 7 6 5 4 3 2
PLAN AT EL(+)16.200/EL(+)15.500M LEVEL