Acid Wash Presentation
Acid Wash Presentation
Acid Wash Presentation
4)
Stimulation operation 2) Acid wash Obstacle(Asphaltene)
in Azadegan oil field operation for removal for producer
contains: producer wells wells
Producer
New Well
Well
organic deposition
is due to of
Drilling Fluid property change of
produced oil
Porosity &
Temperature GOR Well Sketch Permeability
Fracture Gradient of
Formation
Friction Pressure
Safety Margin
Strategy of Acidizing:
• Considering the temperature of the formation to be treated
• Select appropriate acid additives, to avoid corrosion, sludge and any problem that damage pay zone
• Enhance the injecting pressure and flow rate as high as possible
• form the “wormhole” as much as possible and deepen its depth
• Design effective Preflush and Overflush conditioning and break any formed gel
Laboratory Studies and Optimization of
additives concentration:
1. Corrosion test:
-N-80 coupon sample was run in contact of 15% HCl with the proposed additives
-test must be run in High Pressure condition to avoid vaporization
-corrosion rate must be less than 0.05 lb/ft2 for 6hr to be acceptable
Without
With Anti Sludge
Anti Sludge
After Test
After Test
Software Design:
Casing & Tubing
Skin vs Time
Data
Pressure & Injection
Zone Properties Rate vs Time
Output
Input
Cumulative
Damage Production
Skin Vs Time
Cumulative Production
Stimulation Fluid:
• In aim to achieve the best stimulation results following Stimulation fluids are proposed:
1.Preflush:
-acts as a spacer between reservoir fluid and main fluid
-guarantees the water wet condition of reservoir rock
-breaking the gelled fluids in flow-back stage
-pushes formation fluids to the reservoir and minimizes the oil-acid contact
-Pumped before main acid
-For example for prepare 15 bbl Preflush:
Pump Units
Pump Truck
Line
X-Mas Tree
CT Injector CT Reel
Power Pack
CT BOP
Blind Rams
Shear Rams
Slip Rams
Pipe Rams
Downstream Upstream
4)Slick line Rig Up
-Set Protection Sleeve in TRSCSSSV (or remove WRSCSSSV and Set Dummy in Landing Nipple)
-RIH Gauge Cutter to max accessible depth in order to
Running Tool
Pulling Tool
Gauge Cutter
Protection Sleeve
Lubricator
BOP
Operation Flow Chart:
Coiled Tubing reel acid pickling Procedure:
• In order to prevent and minimize induced formation damage caused by debris and iron content, acid pickling
is proposed prior to start the operation
• pumping 5 bbl 15% HCl
through coiled tubing
followed by 25 bbl(CT Volume)
fresh water as displacement
to pickle the Coiled Tubing
reel while return is open Reel
and circulate it out. Injector
Line from
Pump Truck
Coiled Tubing Accessibility:
• Zero Depth & Confirm Zero Weight, ensure the acquisition is on and recording.
• Open the master valve and swab valve and record the amount of turns need
• Start RIH CT at 60 ft /min inside the tubing, when approaching any completion equipment with ID changes
(nipple profiles, tubing crossovers, etc.), reduce RIH speed to 10-15 ft/min
• Every 2000 ft perform a pull test and break circulation to check weight/drag.
• Continue RIH to check the accessibility in the open hole
Acid Wash Procedure:
• RIH CT to the maximum depth
• Once CT reach to the maximum depth.
• Start mixing the volume of stimulation fluids
• Zero the bbl counter and begin pumping recommended acid treatment as per Pump Schedule
• When displacing the reel to acid, once the acid is at the nozzle, ensure the coiled tubing x tubing annulus
closed. Monitor the pressure and rate while pumping
• Pump the Treatment as per the pumping schedule. (Pump Rate, Volume Pumped vs. POOH schedule)
• Continue pump and squeeze a total volume of stimulation fluids while moving C.T at a controlled speed in
order to uniformly distribute acid throughout the hole.
• Once all acid pumped out of CT POOH.
• Over displace using Overflush (while CT RIH to TD), displace CT by 25bbl fresh water and squeeze all the
fluids with Diesel to be pumped through CT annulus(Bullhead from surface)
• Preflush:
-Pumped while CT RIH from top of producing interval to TD
• Main Acid:
-Pumped while CT POOH from TD to top of producing interval
• Overflush:
-Pumped while CT RIH from top of producing interval to TD
• Diesel or Water:
-Bullhead from surface while CT at end of completion string
Solution Tanks
Contain:
Preflush
Pumping Units Main Acid
Overflush
Diesel
Fresh Water
Manifold
Line from Pump Unit to CT
CT Injector
Pump Units
Solution Tanks
Pumping Data
Rate
Pumping Pressure
Well Clean Up:
• Start well clean up by changing adjustable choke gradually and record the data manually and through Data
Acquisition System
• Flow the well on suitable choke depends on well situation
• Increase the choke to get stabilized parameters
• Switch to fixed choke in case of choke manifold plugged by Asphaltene or debris.
• Take sample from choke manifold
• Check monitoring parameters (pH, BS&W,and density) every one hour
• When stabilized parameters are confirmed (BS&W<1% and stable flowing pressure) proceed for separator
test followed by flowing survey.
Upstream Data Header
Digital Temperature Gauge
Mechanical Pressure Gauge
Fixed Choke
Adjustable Choke
Fixed Choke 24/64 inch
Digital Temperature Gauge
BS & W=6 %
For example
Weight= 58 lb/ft3
X-Mas Tree
CT BOP
Separator test:
• Divert flow to test separator and measure & record the flow properties as below:
-Wellhead: pressure/Temp. Before and after chock
-Separator: Pressure, Temp., Gas/Oil/Water Rate, Oil Rate, GOR, PH, Oil API, Gas gravity, H2S &CO2 content,
BS&W
3-Phase Separator
Inlet
Oil Outlet
Pressure Gauge
Temperature gauge
Gas Outlet
For Heavy Gas(Rather than Air)
Zero
For Light Gas
Inlet Gas
Differential Pressure
Across Orifice
After Orifice
Before Orifice
Daniel Orifice
For Measuring
Gas Rate
Daniel Orifice
Sep Tem. Sep Pr. Gas S.G.
0.625’’
0.875’’
CO2 Tube
For Measuring H2S & CO2 Content
Flowing Survey:
• R.I.H. Slick line for drifting Tubing (by suitable size of the Gauge Cutter), to Maximum accessible depth then
POOH
• Pick up 2 numbers. Tandem-programmed (Pressure /Temperature) Memory gauge
• Continue flow the well at choke manifold when stabilized parameters are confirmed till (BS&W<1% and
stable flowing pressure)
• RIH gauge and perform flowing survey (while SL POOH) as client representative program on suitable choke
size (fix choke) and different depths
Memory Gauge
Battery
Temperature Profile
Pressure Profile
Pressure Temperature
By using time
Recorded by SL
Operator and depth
That memory
stopped
And data that it
recorded
We can calculate
Pressure and
Temperature
Gradient across well
column
Secure the Well & Release Equipment:
• Close Master Valve
• Bleed Off Pressure to Zero
• Flushing Equipment
• Close Swab Valve
• Close TRSCSSSV
• Close HMV
• Close Kill Line valve
• Close Production Valve
• Disconnect Separator and all equipment
Swab Valve
Adjustable Choke
Kill Valve
Production Valve