JF - Approach Towards Works
JF - Approach Towards Works
JF - Approach Towards Works
BIM Service & Extraction of Cast-in items Quantity for bridge Segments
BIM Consultant
1
Contents
1. Scope of Works..............................................................................................3
2. Software Used................................................................................................4
4. Exclusions.......................................................................................................5
1. Scope of Works
2
1. Upgrade the Existing bridge segment model against the latest design package information
[LOD 200 to LOD 300].
BR1400 6
BR1903 4
2. All temporary elements have to be modelled in LOD 400 from scratch using the latest
temporary design drawings for the base plate and bolts (ferrules) that connect the
permanent structure. For other elements, modeling in LOD 300. Refer to the below images
for an understanding of temporary elements.
3. Identify the clashes between segment model and temporary model elements and list out the
clash report.
4. Extraction of quantity of cast-in items, like ferrules, base plates, connections plates, and
bolts for temporary & Permanent elements.
2. Software Used
4
4. Exclusions
a) Steel Modelling for Fabrication drawing
b) Rebar modelling
c) 4D & 5D Process
d) BOQ Extractions from model.
5
6