A. SUB- STRUCTURE
1. EXCAVATION & EARTH WORK
Demolish any stracture and utilities exist on the
construction site. Price shall include
1.1 excavation,demolishing, cartaway and other related works Ls 1.00
to clear and prepare the site for the new building to be
constructed.
Supply and fix G-28 flat metal sheet gutter as per the detail
3.2 drawing. Price shall include metal bracket support and all ml #REF!
other necessary acessories.Devt. length =500 mm
Supply & fix ribbed sheet under eave. Price shall include
40x50mm zigba wood battem run both way & dcoreted
3.3 corner list. Price shall include 40 x 50 mm Zigba wood m² #REF!
battens with c/c spacing of 600 mm both ways,corner list,
three coats of enamaled paint and all other necessary
accessories
4.1 Diam. 10-12 cm eucalyptus for upper and lower chord. ml #REF!
METAL WINDOWS
Type W7 size-180x170cm No 8.00
Type W10 size-90x170cm No 8.00
METAL DOORS
Type D6 size - 90x275 cm No 8.00
Total 8,180,908.81
15% VAT 1,227,136.32
Amount (Birr)
The value of work executed to date is Birr #REF!
Material on site -
The value of work executed and material on site is Birr #REF!
No. DATE NetPayment
No Date Amount (Birr) VAT DEDUCTION AMOUNT (BIRR) `
Advance 1 2,454,272.64 368,140.90
1. Total Previous Payment -
1st Pay
2nd Pay
2. Rebate 6% #REF!
3. Retention 5% #REF!
4. Penalty
BIRR 2,388,771.38 (TWO MILLION THREE HUNDRED EIGHTY EIGHT THOUSAND SEVEN HUNDRED SEVENTY ONE BIRR AND 38/100%
ONLY INCLUDING VAT
CERTIFIED BY APPROVED BY
SIGNITURE SIGNITURE
DATE DATE
በደ/ኢ/ሕ/ክ/ መንግስት የደቡብ ኦሞ ዞን SEPRS DEBUB OMO ZONE URBAN
ከተማ መ/ልማትና ኮንስትራክሽን መምሪያ DEV'T & Construction Departement
Total 8,180,908.81
15% VAT 1,227,136.32
ድምር
Total sum 9,408,045.13
Previous VAT
አስቀድሞ የተከፈለ ተ.ዕ.ታ
No Date Amount (Birr) VAT
1st Advance 2,454,272.64 368140.90 Amount (Birr)
1st Pay - 0.00 The value of work executed Birr #REF!
2nd Pay - - 15% VAT of work excuted is Birr #REF!
- - Material on site -
- - 15% VAT of material on site is Birr -
Total Prev. Vat Payments - - 15% total VAT #REF!
ተቀናሽ (DEDUCTION) የገንዘቡ ልክ /ብር/ AMOUNT
(BIRR)
1. Previous VAT
-
አስቀድሞ የተከፈለ
2. Rebate 6%
#REF!
ቅናሽ
3. VAT Retention 5 %
-
.መያዣ
4.Advance vat repa(30%)
#REF!
የቅድሚያ ክፍያ
Total Deduction
#REF! #REF!
ጠቅላላ ተቀናሽ
Net VAT #REF!
CERTIFIED BY APPROVED BY
SIGNITURE SIGNITURE
DATE DATE
በደ/ኢ/ሕ/ክ/ መንግስት የደቡብ ኦሞ ዞን SEPRS DEBUB OMO ZONE URBAN DEV'T &
ከተማ መ/ልማትና ኮንስትራክሽን መምሪያ Construction Departement
¾Ñî lØ`
K}W\ Y^‹ TÖnKÁ Page No.----------------------
Summary of Measurement ¾¨<M lØ`
Y^¨< Contract No :
Project:- STAFF RESIDENCE
x¨<
Location DASENECH WOREDA HADO KEBELE
›W]¨< S/u?ƒ
Employer:- SOUTH ETHIOPIA HEALTH Burauea
¾Y^¨< }s^ß
Contractor:- SOLOMON MILKO B.C
›T"] SG”Ç=e
Consultant: -
¾}W^¨< Y^“ / ¨ÃU ¾k[u< n‹ ´`´`
Details of works executed and / Materials supplied
}^ ÉU` uŸòM ÉU` uŸòM
lØ` SÓKÝ Sub Total (Birr) Total ( Birr )
Item Description ¾¨<K ¾}W^ ¾¨<K ¾}W^
No Contract Excuted Contract Excuted
A. Sub Structure
1.0 STAFF RESIDENCE BLOCK 3,505,453.51 #REF!
2.0 TRADITION KITCHEN & DRY PIT LAT 1,898,237.50 #REF!
3.0 DRY LATRINE 3,420,783.14 #REF!
4.0 FENCE WORK 332,557.41 -
------------------------------------------------------------------------------------------------------------------------------------------------------
ሥራ ተቋራጭ አማካሪ መሃንዲስ የሥራ ተቆጣጣሪ/ኢንስፔክተር
Contractor Consultant Supervisor/Inspector
Block:- Residence
Item Amount
No Description Unit Contract Executed
A. Sub Structure
______________________________ _________________________
Contractor Supervisor
BLOCK ID:- RESIDENCE/MAIN BLOCK
Item Quantity
No Description Unit
Contract Excuted
Rate Amount Excuted
A. SUB- STRUCTURE
1. EXCAVATION & EARTH WORK
Clear off site to remove top soil to an average depth
1.1 m2 87.36 87.36 20.00 1,747.20
of 30cm
Bulk excavation in ordinary soil from to a depth of
1.2 1500mm from reduced level with 1.0m working m3 43.68 43.68 100.00 4,368.00
space on bothways.
Trench excavation in ordinary soil for masonry
1.3 foundation to a depth not exceeding 1500 mm from m3 17.64 300.00 -
reduced level.
Supply and fix G-28 flat metal sheet gutter as per the
detail drawing. Price shall include metal bracket
3.2 ml 16.80 - 1,200.00 -
support and all other necessary acessories.Devt.
length =500 mm
METAL WINDOWS
Type W7 size-120x120cm No 2.00 2.00 9,000.00 18,000.00
Type W10 size-75x240cm No 6.00 6.00 13,000.00 78,000.00
METAL DOORS - -
Type D6 size - 120x220cm No 2.00 2.00 16,000.00 32,000.00
Total Carried to Summary Eth.Birr ………………..…………………………… 128,000.00
6. FINISHING WORK
Finishing work shall include all surface pre-
cleaning,preparation, application of finishing,
polishing and cleaning at the end of finishing work
and all edge works.
Apply three coats of plastering in cement sand
6.1 mortar (1:3) for front side . Price shall include pre-
cleaning and preparation of the surface.
a) To internal wall and concrete surfaces. m2 119.26 #REF! 650.00 #REF!