Habitat For Humanity E.BOQ-11
Habitat For Humanity E.BOQ-11
Habitat For Humanity E.BOQ-11
BoQ and Specification for the Construction of the 200 Meteres Masonary Retaining Wall Ditch
Location: Addis Ababa Gulele W-01
Price includes supply of materials, transport, labour, water & equipment
Price Quotation Date______________________________
7,483.49 2,574,321.52
50cm thick Hard tryptic or equivalent dressed masonary
stone manhole (150cm *120cm width internally) bedding in
cement mortar (1:4). Internal wall top & bottom faces
3.2 cleanly finished with cement plastering. Including 200mm NO 3.00
thick mass concrete base.
1,160.26 3,480.78
Sub-total 2,577,802.30
4 CONCRETE WORK
15cm thick reinforced concrete manhole cover C-25 with
minimum cement content of 360kg/m3 cast in-situ into
braced timber formwork and vibrated around rod
reinforcement bars and cover the manhole with 1:4 ratio
4.1 mortar. (price shall include supply, cut and fix timber NO 3.00
formwork)
3,645.00 10,935.00
boq,spec price
HABITAT FOR HUMANITY ETHIOPIA
BoQ and Specification for the Construction of the 200 Meteres Masonary Retaining Wall Ditch
Location: Addis Ababa Gulele W-01
Price includes supply of materials, transport, labour, water & equipment
Price Quotation Date______________________________
boq,spec price
HABITAT FOR HUMANITY ETHIOPIA
Summary for 200 meters masonary retaining wall ditch
Location: Gulelw W-01
R.# Descriptions Total Amount (Birr)
1 Excavation and Earth Work
2 Installation of Class ''C'' Full Concrete Ditch
3 Masonary Work
4 Concrete Work
Sub Total
15% VAT
Total Amount Including 15% VAT
HABITAT FOR HUMANITY ETHIOPIA
BoQ and Specification for the Construction of the 700 Meteres Concrete Pipe Ditch
Location: Addis Ababa Akaki W-03
Price includes supply of materials, transport, labour, water & equipment
Price Quotation Date______________________________
3,645.00 200,475.00
boq,spec price
HABITAT FOR HUMANITY ETHIOPIA
BoQ and Specification for the Construction of the 700 Meteres Concrete Pipe Ditch
Location: Addis Ababa Akaki W-03
Price includes supply of materials, transport, labour, water & equipment
Price Quotation Date______________________________
boq,spec price
HABITAT FOR HUMANITY ETHIOPIA
Summary for 700 meters concrete pipe ditch
Location: Akaki W-03
R.# Descriptions Total Amount (Birr)
1 Excavation and Earth Work
2 Installation of Class ''C'' Full Concrete Ditch
3 Masonary Work
4 Concrete Work
Sub Total
15% VAT
Total Amount Including 15% VAT
HABITAT FOR HUMANITY ETHIOPIA
GRAND SUMMARY
Construction of 200 Meters Masonary Retaining Wall Ditch and 700 Meters Concrete Pipe Ditch
Location: Gulele W-01 & Akaki W-03
R.# Descriptions Total Amount Including 15% VAT (Bir