Professional Documents
Culture Documents
Boq G+0
Boq G+0
BODITI TVET2/44
SUMMARY FOR CLASS ROOM BLOCK
Total
BODITI TVET2/44
OM BLOCK
Amount (Birr)
226,200.00
499,663.80
154,375.00
425,600.00
465,510.00
283,929.00
19,200.00
38,500.00
19,200.00
33,460.00
101,630.00
2,267,267.80
BODITI TVET3/44
Item no Description of Work Unit Qty Rate Amount
200.00 4000
Supply and fix dia.50mm plastic (PVC) down pipe fixed to
5.8 wall or columns with metal straps at minimum c/c 100cm.and m
fix metal strainer at the top.
42.00 100.00 4200
Total Carried to Summary 465,510.00
Item no Description of Work Unit Qty Rate Amount
6. Metal Works
Supply and fix 1.5 mm thick 38x38mm LTZ profile framed
windows, Window-doors and Doors all according to the detail
drawing and schedule. price shall include hinges approved
quality cylindrical lock,handle,grills,all other necessary
accessories, and one coat of primary & two coats of synthetic
paint.
6.1 Windows
W1 size 2200 x 1800mm No 20.00 5,940.00 118800
W2 size 2500 x 1800mm No 6.00 6,750.00 40500
W3 size 1600 x 1800mm No 1.00 4,320.00 4320
DOORS
D2 size 900 x 2100mm No 14.00 2,835.00 39690
6.2 Fixing 800x800x2.5mm RHS colunm to the beam at bottom
and top. Price shall include one coat of primary & two coats of ml
synthetic paint.
230.34 350 80619
6.3 Fixing C shape metal sheet to window and door corner and
RHS colunm. Price shall include one coat of primary & two
coats of synthetic paint and to bend,welding and cuting 2mm ml
flat metal sheet as showen in the drawing.
230.34 250 57585
Total Carried to Summary 283,929.00
Item no Description of Work Unit Qty Rate Amount
7. PLASTERING
Finishing work shall include all surface pre-cleaning
7.1 preparation, application of finishing, polishing and cleaning at
the end of finishing work.
Apply three coats of plastering in cement sand mortar 1:3 to
HCB wall m2
240.00 80.00 19200
Total Carried to Summary 19,200.00
8. PAVING AND FLOORING
70mm thick cement sand screed bedding. In cement sand ratio
8.1 1:3 m2
750.00 120.00 90,000.00
Construct an average size of 300mm half circle concrete
ditch around the building over selected material fill.
Compact around edges provide a minimum of 0.5% slope
8.2 m
towards flow direction. The surface shall be smooth and
edges straight.
110.00 350.00 38,500.00
Total Carried to Summary 38,500.00
9. PAINTING
Apply three coats of plastic paint of chosen type and color to
9.1 all surface of walls & plastered concrete beams and columns. m2
240.00 80.00 19,200.00
Total Carried to Summary 19,200.00
10. GLAZING
Fix 4mm thick clear glass to all metal Door , Windows &
10.1 Door - Windows. Price shall include good quality sticking m2
putty. 133.84 250.00 33,460.00
Total Carried to Summary 33,460.00
ELECTRICAL INSTALLATION
Supply and install :-
1. Distribution Boards
Flush mounted Metalic distribution Board, LPP-ADM-GF , in
sheet steel enclosure with lockable door and including bus bars
1.1 of 63Amp/3Phase, all necessary fixing and connecting
accessories, complete and consisting of:-
47 350.00 16,450.00
16 350.00 5,600.00
Item no Description of Work Unit Qty Rate Amount
5. Flush Mounted Socket Outlets
Flush mounting single 10-16A/1P Legrand type or approved
5.1 equivalent No 16 150.00
2,400.00
6. Light Fittings and Lamps
Connected and tested including lamps and accessories
complete, all as specified or described in lighting fittings
schedule and as shown on the drawings.
6.1 Philips TMS 012 with 1xTL-D 36w (Batten) No 5 1500.00 7,500.00
6.2 Philips TCS 098 2x TL-D 36W luvered No 42 1500.00 63,000.00
Total Carried to Summary……………… 101,630.00
Project:-
CLIENT :
CONSULTANT: Bitalico Trading PLC.
CONTRACTOR :
Title: Take off sheet
No L*W*H Product Description No L*W*H
A. SUBSTRUCTURE
1.00
1,050.00
130.00
340
________________ ______________
Project:-
CLIENT :
CONSULTANT: Bitalico Trading PLC.
CONTRACTOR :
Title: Take off sheet
No L*W*H Product Description No L*W*H
B. SUPERSTRUCTURE
1.CONCRETE WORK
a) In elevation columns.
17 2.70
0.40
0.40
7.34
b) In Floor beams & Top tie beams
2 196.96
0.6
0.30
70.91
c) In 15 cm thick suspended floor
1 27.31 slabs.
21.93
598.91
d) In staircase.
2 7.48
0.30
1.35
6.05
e) In Concrete Gutter and lintls
2.4 Formwork
a) In foundation column.
17 1.60
2.70
73.44
b) In First Floor & Top tie beams
4 196.96
0.30
236.35
c) In suspended slabs.
1 27.31
21.93
598.91
d) In staircase.
1 7.48
2.7
20.18
4 7.48
0.30
8.97
20 1.11
0.15
3.33
32.48
e) In Concrete Gutter and lintls
0.00
For Contractor For Consultant
________________ ______________
Page No___of___
Product Description
For Client
_______________
Page No___of___
Product Description
For Client
_______________
SUMMARY FOR TOILET AND DINING ROOM EXPANSIONBLOCK
BODITI TVET2/44
OOM EXPANSIONBLOCK
Amount (Birr)
10,860.00
36,327.00
15,250.00
13,500.00
19,000.00
151,122.00
10,240.00
4,200.00
16,890.00
3,820.00
281,209.00
BODITI TVET3/44
Item no Description of Work Unit Qty Rate Amount
6.1 DOORS
D1 size 900 x 2100mm No 1.00 2,835.00 2835
D2 size 800 x 1800mm No 10.00 2,160.00 21600
6.2 Fixing 400x400x2mm RHS colunm to the beam at bottom and
top. Price shall include one coat of primary & two coats of ml
synthetic paint.
230.34 300 69102
6.3 Fixing 1.5mm flat metal sheet to RHS colunm for toilet
partion.Price shall include one coat of primary & two coats of ml
synthetic paint and cuting welding and any necessary to fix it.
230.34 250 57585
Total Carried to Summary 151,122.00
Item no Description of Work Unit Qty Rate Amount
7. PLASTERING
Finishing work shall include all surface pre-cleaning
7.1 preparation, application of finishing, polishing and cleaning at
the end of finishing work.
Apply two coats of plastering in cement sand mortar 1:3 to
HCB wall m2
128.00 80.00 10240
Total Carried to Summary 10,240.00
8. PAVING AND FLOORING
70mm thick cement sand screed bedding. In cement sand ratio
8.1 1:3 m2
35.00 120.00 4,200.00
Total Carried to Summary 4,200.00
9. SANITARY INSTALLATION
9.1 SANITARY EQUIPMENT (FIXTURES)
Fix Tabor or equivalent turkish water closet including low
flush cistern complete with universal mechanism & float valve,
and other required accessories of approved standards & best
9.1.1 quality. Unit price shall include all the necessary assistance No
works there to.
2 350.00 700.00
Grade-Beam
on axis a and d 16 7.78 3 4 - - -
16 8.17 3 4 - - -
16 6.67 3 4 - - -
16 11.05 3 4 - - -
16 7.8 3 4 - - -
16 9.02 3 4 - - -
8 1.30 138 4 - 717.6 -
on axis b and c 16 7.78 3 2 - - -
16 8.17 3 2 - - -
16 6.67 3 2 - - -
16 11.05 4 2 - - -
16 7.8 4 2 - - -
16 9.02 4 2 - - -
8 1.30 138 2 - 358.8 -
on axis 1,2,3 & 4 16 6.16 4 6 - - -
16 7.41 4 6 - - -
16 6.67 4 6 - - -
16 4.15 4 6 - - -
16 8.82 4 6 - - -
16 7.51 4 6 - - -
14 6.18 4 6 - - -
8 1.3 111 6 - 865.8 -
Ground Floor Slab (mesh)
8 28.9 111 1 - 3207.9 -
8 22.4 138 1 - 3091.2 -
Total length 0 9065.7 0
Unit weight KG/ml 0.222 0.395 0.617
Total KG/ml 0 3580.9515 0
Add wesitage 5% 0 3760.00 0.00
Number of Berggas 0 314 0
For first floor
1st Floor Slab (mesh)
vertical 10 9.4 17 4 - - 639.2
10 6.62 52 2 - - 688.48
10 9.08 51 1 - - 463.08
10 7.4 52 2 - - 769.6
10 7.4 11 2 - - 162.8
10 7.82 52 3 - - 1219.92
12 4.13 167 1 - - -
12 4.52 167 1 - - -
12 3.45 167 1 - - -
horizontal 10 10.05 103 2 - - 2070.3
10 11.67 32 2 - - 746.88
10 4.13 167 2 - - 1379.42
10 7.7 151 1 - - 1162.7
12 5.03 151 4 - - -
1st- floor Beam
on axis a and d 20 6.78 2 2 - - -
16 6.78 1 2 - - -
20 8.165 2 2 - - -
16 8.165 1 2 - - -
20 7.14 2 2 - - -
16 7.14 1 2 - - -
20 5.67 2 2 - - -
16 5.67 1 2 - - -
16 5.11 2 2 - - -
20 5.33 2 2 - - -
16 4.33 3 2 - - -
20 10.05 3 2 - - -
20 7.8 3 2 - - -
20 8.025 3 2 - - -
8 1.70 132 2 - 448.8 -
on axis b 20 6.78 2 1 - - -
16 6.78 1 1 - - -
20 8.165 2 1 - - -
16 8.165 1 1 - - -
20 7.14 2 1 - - -
16 7.14 1 1 - - -
20 5.67 2 1 - - -
16 5.67 1 1 - - -
20 5.11 4 1 - - -
16 5.11 1 1 - - -
20 5.33 5 1 - - -
20 4.33 4 1 - - -
16 4.33 5 1 - - -
20 10.05 6 1 - - -
20 7.8 6 1 - - -
20 8.025 3 1 - - -
8 1.70 132 4 - 897.6 -
on axis c 20 6.78 2 1 - - -
16 6.78 1 1 - - -
20 8.165 2 1 - - -
16 8.165 1 1 - - -
20 7.14 2 1 - - -
16 7.14 1 1 - - -
20 5.67 2 1 - - -
16 5.67 1 1 - - -
20 5.11 5 1 - - -
20 5.33 6 1 - - -
20 4.43 7 1 - - -
16 4.43 1 1 - - -
20 10.05 6 1 - - -
16 10.05 1 1 - - -
20 7.8 6 1 - - -
20 8.025 3 1 - - -
8 1.70 132 4 - 897.6 -
on axis 1,2 & 3, 4 20 5.36 2 4 - - -
16 5.36 1 4 - - -
20 7.41 2 4 - - -
16 7.41 1 4 - - -
20 8.92 2 4 - - -
16 8.92 1 4 - - -
20 3.69 2 4 - - -
16 4.62 5 4 - - -
20 4.1 20 4 - - -
20 1.85 3 4 - - -
20 7.82 3 4 - - -
20 7.51 5 4 - - -
20 5.18 3 4 - - -
8 1.3 104 6 - 811.2 -
1st -floor Column
- - -
C-1 sec a-a 16 3.6 8 4 - - -
8 1.5 23 4 - 138 -
C-2 sec b-b 16 3.6 10 4 - - -
8 1.3 23 4 - 119.6 -
C-3 sec b-b 16 3.6 10 4 - - -
8 1.3 23 9 - 269.1 -
stair case 1
12 2.23 24 4 - - -
8 1.06 22 2 - 46.64 -
14 7.48 24 2 - - -
Total length 0 3628.54 9302.38
Unit weight KG/ml 0.222 0.395 0.617
Total KG/ml 0 1433.2733 5739.56846
Add wesitage 5% 0 1504.94 6026.55
Number of Berggas 0 126 503
For Roof
Roof Floor Slab (mesh)
vertical 10 9.4 17 4 - - 639.2
10 6.62 52 2 - - 688.48
10 9.08 51 1 - - 463.08
10 7.4 52 2 - - 769.6
10 7.4 11 2 - - 162.8
10 7.82 52 3 - - 1219.92
12 4.13 167 1 - - -
12 4.52 167 1 - - -
12 3.45 167 1 - - -
horizontal 10 10.05 103 2 - - 2070.3
10 11.67 32 2 - - 746.88
10 4.13 167 2 - - 1379.42
10 7.7 151 1 - - 1162.7
12 5.03 151 4 - - -
Top Tie Beam
on axis a and d 20 6.78 2 2 - - -
16 6.78 1 2 - - -
20 8.165 2 2 - - -
16 8.165 1 2 - - -
20 7.14 2 2 - - -
16 7.14 1 2 - - -
20 5.67 2 2 - - -
16 5.67 1 2 - - -
16 5.11 2 2 - - -
20 5.33 2 2 - - -
16 4.33 3 2 - - -
20 10.05 3 2 - - -
20 7.8 3 2 - - -
20 8.025 3 2 - - -
8 1.70 132 2 - 448.8 -
on axis b 20 6.78 2 1 - - -
16 6.78 1 1 - - -
20 8.165 2 1 - - -
16 8.165 1 1 - - -
20 7.14 2 1 - - -
16 7.14 1 1 - - -
20 5.67 2 1 - - -
16 5.67 1 1 - - -
20 5.11 4 1 - - -
16 5.11 1 1 - - -
20 5.33 5 1 - - -
20 4.33 4 1 - - -
16 4.33 5 1 - - -
20 10.05 6 1 - - -
20 7.8 6 1 - - -
20 8.025 3 1 - - -
8 1.70 132 4 - 897.6 -
on axis c 20 6.78 2 1 - - -
16 6.78 1 1 - - -
20 8.165 2 1 - - -
16 8.165 1 1 - - -
20 7.14 2 1 - - -
16 7.14 1 1 - - -
20 5.67 2 1 - - -
16 5.67 1 1 - - -
20 5.11 5 1 - - -
20 5.33 6 1 - - -
20 4.43 7 1 - - -
16 4.43 1 1 - - -
20 10.05 6 1 - - -
16 10.05 1 1 - - -
20 7.8 6 1 - - -
20 8.025 3 1 - - -
8 1.70 132 4 - 897.6 -
on axis 1,2 & 3, 4 20 5.36 2 4 - - -
16 5.36 1 4 - - -
20 7.41 2 4 - - -
16 7.41 1 4 - - -
20 8.92 2 4 - - -
16 8.92 1 4 - - -
20 3.69 2 4 - - -
16 4.62 5 4 - - -
20 4.1 20 4 - - -
20 1.85 3 4 - - -
20 7.82 3 4 - - -
20 7.51 5 4 - - -
20 5.18 3 4 - - -
8 1.3 104 6 - 811.2 -
3003.98
3304.3725
106.65
1400
553
270
324
127.98
Æ12 Æ14 Æ16 Æ20 Æ24
- 728 - - -
- 162.4 - - -
- 280.8 - - -
- 151.8 - - -
- 168 - - -
- - - - -
- - 141.12 - -
- - - - -
- - 141.12 - -
- - - - -
- - 141.12 - -
- - - - -
- - - - -
- - 115.2 - -
- - - - -
- - 115.2 - -
- - - - -
- - 115.2 - -
- - - - -
- - 93.36 - -
- - 97.98 - -
- - 80.04 - -
- - 132.6 - -
- - 93.6 - -
- - 108.288 - -
- - - - -
- - 46.68 - -
- - 48.99 - -
- - 40.02 - -
- - 88.4 - -
- - 62.4 - -
- - 72.192 - -
- - - - -
- - 147.84 - -
- - 177.84 - -
- - 160.08 - -
- - 99.6 - -
- - 211.68 - - 4.9
- - 180.24 - -
- 148.32 - - -
- - - - -
- - - - -
- - - - -
0 1639.32 2710.79 0 0
0.888 1.21 1.58 2.47 3.55
0 1983.5772 4283.0482 0 0
0.00 2082.76 4497.20 0.00 0.00
0 174 375 0 0
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
689.71 - - - -
754.84 - - - -
576.15 - - - -
- - - - -
- - - - -
- - - - -
- - - - -
3038.12 - - - -
- - - 27.12 -
- - 13.56 - -
- - - 32.66 -
- - 16.33 - -
- - - 28.56 -
- - 14.28 - -
- - - 22.68 -
- - 11.34 - -
- - 20.44 - -
- - - 21.32 -
- - 25.98 - -
- - - 60.3 -
- - - 46.8 -
- - - 48.15 -
- - - - -
- - - 13.56 -
- - 6.78 - -
- - - 16.33 -
- - 8.165 - -
- - - 14.28 -
- - 7.14 - -
- - - 11.34 -
- - 5.67 - -
- - - 20.44 -
- - 5.11 - -
- - - 26.65 -
- - - 17.32 -
- - 21.65 - -
- - - 60.3 -
- - - 46.8 -
- - - 24.075 -
- - - - -
- - - 13.56 -
- - 6.78 - -
- - - 16.33 -
- - 8.165 - -
- - - 14.28 -
- - 7.14 - -
- - - 11.34 -
- - 5.67 - -
- - - 25.55 -
- - - 31.98 -
- - - 31.01 -
- - 4.43 - -
- - - 60.3 -
- - 10.05 - -
- - - 46.8 -
- - - 24.075 -
- - - - -
- - - 42.88 -
- - 21.44 - -
- - - 59.28 -
- - 29.64 - -
- - - 71.36 - 4.9
- - 35.68 - -
- - - 29.52 -
- - 92.4 - -
- - - 328 -
- - - 22.2 - 4.9
- - - 93.84 -
- - - 150.2 -
- - - 62.16 -
- - - - -
- - - - -
- - 115.2 - -
- - - - -
- - 144 - -
- - - - -
- - 144 - -
- - - - -
214.08 - - - -
- - - - -
- 359.04 - - -
5272.9 359.04 781.04 1673.35 0
0.888 1.21 1.58 2.47 3.55 6.515
4682.3352 434.4384 1234.0432 4133.1745 0
4916.45 456.16 1295.75 4339.83 0.00
410 39 108 362 0
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
689.71 - - - -
754.84 - - - -
576.15 - - - -
- - - - -
- - - - -
- - - - -
- - - - -
3038.12 - - - -
- - - 27.12 -
- - 13.56 - -
- - - 32.66 -
- - 16.33 - -
- - - 28.56 -
- - 14.28 - -
- - - 22.68 -
- - 11.34 - -
- - 20.44 - -
- - - 21.32 -
- - 25.98 - -
- - - 60.3 -
- - - 46.8 -
- - - 48.15 -
- - - - -
- - - 13.56 -
- - 6.78 - -
- - - 16.33 -
- - 8.165 - -
- - - 14.28 -
- - 7.14 - -
- - - 11.34 -
- - 5.67 - -
- - - 20.44 -
- - 5.11 - -
- - - 26.65 -
- - - 17.32 -
- - 21.65 - -
- - - 60.3 -
- - - 46.8 -
- - - 24.075 -
- - - - -
- - - 13.56 -
- - 6.78 - -
- - - 16.33 -
- - 8.165 - -
- - - 14.28 -
- - 7.14 - -
- - - 11.34 -
- - 5.67 - -
- - - 25.55 -
- - - 31.98 -
- - - 31.01 -
- - 4.43 - -
- - - 60.3 -
- - 10.05 - -
- - - 46.8 -
- - - 24.075 -
- - - - -
- - - 42.88 -
- - 21.44 - -
- - - 59.28 -
- - 29.64 - -
- - - 71.36 - 4.9
- - 35.68 - -
- - - 29.52 -
- - 92.4 - -
- - - 328 -
- - - 22.2 - 4.9
- - - 93.84 -
- - - 150.2 -
- - - 62.16 -
- - - - -
180.00
159.84
175.824
820.512
148.4736
51 18.5
178.5 190
368.5
145.5575
160.11325
288.09325
SUMMARY FOR CLASS ROOM BLOCK
BODITI TVET2/44
OM BLOCK
Amount (Birr)
BODITI TVET3/44
Item no Description of Work Unit Qty Rate Amount
7.70
Fix dia.50mm plastic (PVC) down pipe fixed to wall or
5.8 columns with metal straps at minimum c/c 100cm.and fix m
metal strainer at the top.
6.00
Total Carried to Summary
Item no Description of Work Unit Qty Rate Amount
7. PLASTERING
Finishing work shall include all surface pre-cleaning
7.1 preparation, application of finishing, polishing and cleaning at
the end of finishing work.
Apply two coats of plastering in cement sand mortar 1:3 to
HCB wall m2
152.40
Total Carried to Summary
8. PAVING AND FLOORING
70mm thick cement sand screed bedding. In cement sand ratio
8.1 1:3 m2
47.00
Construct an average size of 300mm half circle concrete
ditch around the building over selected material fill.
Compact around edges provide a minimum of 0.5% slope
8.2 m
towards flow direction. The surface shall be smooth and
edges straight.
7.70
Total Carried to Summary
9. PAINTING
Apply three coats of plastic paint of chosen type and color to
9.1 all surface of walls & plastered concrete beams and columns. m2
76.20
Total Carried to Summary
10. ELECTRICAL INSTALLATION
Supply and install :-
1. Light Points
Flush mounted light points fed through PVC insulated
conductors of 2x2.5mm2 inside PVC conduits of 16mm
diameter, including junction boxes with covers and insulating
1.1 No
screw cap connectors, complete with all necessery materials.
2
Item no Description of Work Unit Qty Rate Amount
4. Flush Mounted Socket Outlets
Flush mounting single 10-16A/1P Legrand type or approved
4.1 equivalent No 2