AWIT AT LARO PLAYGROUND

ITEM
NO.
DESCRIPTION QTY UNIT

I. GENERAL REQUIREMENTS
1 Mobilization, Demobilization and Utilities 1.00 lot
2 Temporary Facilities 1.00 lot
3 Temporary Fencing 1.00 lot
4 Project Billboard (4'x8'-1 Project) 1.00 pc
5 As- Built Plans 1.00 lot
6 Permits and bonds 1.00 lot
ii. SITE DEVELOPMENT
II.A Landscaping and Flora
1 Pest Control and Soil Poisoning 1.00 lot
2 De-weeding and Removal of Organic Material 1.00 lot
3 Topsoil Replenishment 1.00 cu.m
4 Thai Bamboo (Bambusa dolichomerihalla) 30.00 pc
5 Santan (Ixora) 30.00 pc
6 Citronella (Cymbopogon) 24.00 pc
7 Gumamela (Hibiscus) 24.00 pc
II.B Hardscape
1 Excavation Works 1.00 lot
2 Sand Underlayment 3.00 cu.m
2 Concrete Pavers 30.00 sq.m
3 Concrete Works- Zocalo 1.00 lot
4 2" thk Compressed Rubber Mulch Sheeting 230.00 sq.m
III. ARCHITECTURAL WORKS
III.A Concrete and Masonry
1 Eight (8) Inch dia. Concrete Pipe (for pedestal) 36.00 pc
2 Ten (10) Inch dia. R.C. Pipe (for pedestal) 16.00 pc
3 Plaster Works 1.00 lot
III.B Metalworks
1 4mm THK 2"x4" Tubular Steel (for Pukyutan frame) 270.00 l.m
2 4mm THK 3"x3" Tubular Steel (for Bahay Kubo frame) 40.00 l.m
3 3/4" Galvanized Iron Pipe (for Pukyutan and Ladder rungs) 480.00 l.m
4 GA (verify) 2"x4" Welded Wire Mesh (for Pukyutan cells) 37.80 sq.m
5 5/8" dia Anchor Bolt (for pedestal) 12.00 pc
6 4mm thk (verify) Anchor Strap (for pedestal) 24.00 pc
7 5/8" dia Washer and Nut (for pedestal) 24.00 pc
8 C-Channel Steel Bar (for Roofing) 32.00 l.m
9 C-Channel Steel Bar (for Xylophones and Chimes) 8.00 l.m
10 GA (verify) 1 1/2"x2" Tubular Steel (for Railings and Tukod) 28.00 l.m
10 GA (verify) 3"x4" Tubular Steel (for Bahay Kubo beams) 40.00 l.m
11 Steel Rope Clip and Eye Bolt (for Climbing Ropes) 8.00 set
12 1 1/2" dia Galvanized Iron Pipe (for Fireman Pole) 3.00 pc
13 4" dia Galvanized Iron Pipe (for Swing) 1.00 pc
14 GA (verify) 3"x3" Tubular Steel (for Swing) 1.00 pc
15 Steel Bridge Rope Clip and Eye Bolt (for Bridge) 4.00 pc
16 Steel Chain (for Swing) 6.00 l.m
III.C Wood and Plastics
1 8"x8" "Trabeza" Railroad Ties (for Pukyutan base) 10.00 pcs

page 1 of 4
ITEM
NO.
DESCRIPTION QTY UNIT

2 Creosoted Meralco Wooden Post (for Pukyutan base) 4.00 log


4 1/2" dia braided Nylon Rope (for Hexagonal Netting and Bridge) 2.00 roll
6x1" Open-cell Ribbed Wood Composite Planks (for flooring, bridge
5 18.00 br.ft.
and Balance Beams)
10mm thk. Impact-resistant Polycarbonate Sheeting (for Pukyutan
6 4.00 sheet
panels)
III.D Thermal and Moisture Protection

1 Synthetic Nipa Roofing (for Bahay Kubo and Guardhouse) 14.00 sq.m

2 Waterproof Sheeting Roof Underlayent 3.00 sheet


3 Waterproof Concrete Admixture (for Pedestals) 1.00 lot
4 1/2" thk. Marine Plywood (for Bahay Kubo Ceiling) 3.00 sheet
III.E Finishes
1 Red Oxide Primer (for Steel members) - gal
2 Epoxy Putty (for Steel members) - liters
3 Epoxy Paint (for Steel members) - gal
4 Latex Paint (for Concrete members, bollards) - gal
5 Quick Drying Enamel (for Guardhouse) - gal
6 Rubberized Asphalt Paint (for Filipino Games/ Mural) - gal
III.F Special Construction
1 HDPE Drum (for percussion musical instruments) 10.00 pc
2 Plastic Slide (verify dimensions on site) 2.00 pc
3 PVC Piping (for chimes and xylophones) various sizes 8.00 pcs
III.G Electrical Works
1 2-E27 Outdoor Up/Downlight Wall Sconce 10.00 pc
2 1-E27 Outdoor Garden Light 8.00 pc
3 Electrical Wiring and Incidentals to Complete 1.00 lot
SUMMARY
I. GENERAL REQUIREMENTS
II. SITE DEVELOPMENT
III. ARCHITECTURAL WORKS
TOTAL COST

page 2 of 4