Take Off Sheet: 1.1 Site Clearing

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 7

TAKE OFF SHEET

PROJECT :-USAID ETHIOPIA HEALTH INFRASTRUCTURE PROGRAM DATE:-26/12/2013


LOCATION :- PAGE:- 1
TAKE OFF SHEET NO :- 1 BLOCK:-A WAITING & REGSITRATION
1 2 3 DESCRIPTION 1 2 3 DESCRIPTION
A- SUB STRUCTURE 1.4 Back Fill
Is the total volume of
excavated soil mines total
conceret work under
1. Excavation&Earth Work ground floor slab
1.1 Site clearing
m3 total conceret work
16.867 under floor slab
remove the top organic soil and
vegetation to an average depth
20cm with working space 1m both
side
184.75 m3 total excaveted soil
1 14.83 167.88 m3 Total Back Fill
15.6 231.348 m2 1.5 Water Proof Material
m2 Total site clear
water proof member with
231.348 thickness 0.2mm
1.2 Bulk Execavation 4 4.53

Bulk excavation in ordinary soil to


remove expansive soil material to
adepth not exceeding 0.9m from
reduced level. Working
space=0.25m both side 4.00 72.48 m2
1 14.10 2 4.00
13.30 3.00 24.00 m2
0.70 131.271 m3 96.48 m2 total water proof
1.6 Expansion joint
1 4.04 material
2.55 1 2.80
0.70 7.2114 0.10 0.28 m2
138.48 m3 Total Bulk Execavetion 2 1.30
1.3 Cartawy 0.10 0.26 m2
Becouse of expansive soil all
soil are remove 0.54 m2 total Expansion joint
46.27 m3 total site clearing
138.48 m3 total bulk excavation
184.75 m3 Total Cartawy
________________ ________________
CONTRACTOR SUPERVISOR
1 2 3 DESCRIPTION 1 2 3 DESCRIPTION
2 Concerete Work 2 1.50 on axise B&,C b/n,3&3'

2.1 50mm Lean Concrete C-7 0.20


2.1.1 Under Grade beam 0.10 0.06 m3
3 12.8 on axise 1,2&3 1 3.27 on axise 3' b/n,B&C'
0.25 9.6 m2 0.20
8 4 on axise A,A',C'&D b/n 1&2,2&3 0.10 0.07 m3
m3 Total conceret for
0.25 8 m2 15.91 grade beam

on axise B&,C b/n,3&3' 2.3 Concerete work for


2 1.50 Ground Floor Slab C-25
0.25 0.75 m2 1 12.80 b/n axise A,D&1,3
1 3.27 on axise 3' b/n,B&C' 8.60
0.25 0.82 m2 0.10 11.01
19.17 m2 total Under Grade beam 1 3.65 b/n axise A',C&3
2.2 Concerete work for
Grade Beam C-25 3.54
for rectangural shape 0.10 1.29 m3
3 12.80 on axise 1,2&3 1 40.12 for balcony
0.25 1.30
0.75 7.20 m3 0.10 5.2156 m3
on axise A,A',C'&D b/n 1&2,2&3 m3 Total conceret for
8 4.00 17.52 gound floor slab
0.25 2.4 Formwork
0.75 6.00 m3 12 4.00
2 1.50 on axise B&,C b/n,3&3' 0.83 39.84 m2
0.25 8 4.60
0.75 0.5625 m3 0.83 30.544 m2
1 3.27 on axise 3' b/n,B&C' 4 3.00
0.25 0.80 9.6 m2
m2 total formwork for
0.75 0.61 m3 79.98 grade beam
for triangular shape 2 12.80
3 12.80 on axise 1,2&3 0.10 2.56 m2
0.20 2 11.00
0.10 0.77 m3 0.10 2.20 m2
8 4.00 on axise A,A',C'&D b/n 1&2,2&3 4.76 m2 total formwork for slab
0.20 84.74 m2 total formwork
0.10 0.64 m3
________________ ________________
CONTRACTOR SUPERVISOR
1 2 3 DESCRIPTION 1 2 3 DESCRIPTION

________________ ________________
CONTRACTOR SUPERVISOR
1 2 3 DESCRIPTION 1 2 3 DESCRIPTION

________________ ________________
CONTRACTOR SUPERVISOR
1 2 3 DESCRIPTION 1 2 3 DESCRIPTION
________________ ________________
CONTRACTOR SUPERVISOR
Length No. of No.of Total in
item shape Location Dia. &C/C (m) bars member pcs ø8 ø10 ø12

Total Length 0 0
Bar Weight(KG/m) 0.395 0.617 0.888
Total weight(Kg) this.page 0 0 0
Total weight(Kg) prev.page of sub structure 0 0 0
TOTAL WEIGHT(KG) 0 0 0
Contractor Inspected By
Name:-_______________ Name:-__________________ Name:-_______________
Sign:- _______________ Sign:- _________________ Sign:- ______________
ø14 ø16 ø20

0 0
1.208 1.578 2.466
0 0
0 0 0
0 0
Checked By

You might also like