GGB JKR TMP 02 DRAFT - Check
GGB JKR TMP 02 DRAFT - Check
GGB JKR TMP 02 DRAFT - Check
AWAS
PEMBINAAN
DI HADAPAN
30
250m 200m 100m km / j
PEMBINAAN
JKR
TAMAT
HOTLINE:KONTRAKTOR
RAWANG BOUND
PEMBINAAN
JKR
TAMAT
HOTLINE:KONTRAKTOR
A
LEMBAGA ZAKAT SELANGOR
50m 50m 50m 50m 50m 100m
R
AWAS
PEMBINAAN
30 DI HADAPAN
250m
km / j 100m 200m
D
NOTES:- LEGEND:-
AWAS
1. ALL DESIGN FOR TRAFFIC MANAGEMENT PLAN BASE ON ATJ 2C/85 - PINDAAN 2016 (DURING CONSTRUCTION) ALIRAN TRAFIK BLINKERS KENDERAAN BERAT
2.
3.
ALL SIGNBOARD DESIGN FACES SHALL BE FLUORESCENT ORANGE PRISMATIC RETRO-REFLECTIVE SHEETING.
BARRIER SHOULD BE CONTINUOUS ALONG CONSTRUCTION AREA.
KELUAR/MASUK
DI HADAPAN
50
"PLASTIC BARRIER" WORK AREA
4. BLINKERS TO BE PLACED 10m INTERVAL AT TAPER AND 30m INTERVAL AT STRAIGHT STRETCH. 50 m km / j
5. DELINEATOR STRINGS / BLINKERS ARE PLACED AT ALL APPROACH TO AND ALONG THE CONSTRUCTION AREA. "FLAGMAN"
6. ACCESS TO WORK SITE - FLAGMAN REQUIRED FOR CONSTRUCTION VEHICLE ENTER OR EXIT THE WORKING AREA.
7. FOR NIGHT WORKS, THE CONTRACTOR SHALL INSTALL A FLOOD LIGHT AT THE WORKING AREA. "TRAFFIC CONTROL CONE"