Sdmm/Mwd/Jar Daily Report: Ueepl Representatives

Download as pdf or txt
Download as pdf or txt
You are on page 1of 7

SDMM/MWD/JAR DAILY R

(REPORT CYCLE FROM 02-03-2024 06:00 HRS TO 0


Contract No.: VDA/BRD-ONSG/919980/BN6PC22004/
Date 01 March 2024 Client ONGC
Job No UE12 Well Name MKAF
Kit # SET #2 Area MEKEYPORE
Report No 33 Rig name E-1400-VI
UEEPL REPRESENTATIVES
ONGC REPRESENTATIVES MR. S.K DUTTA MWD Rep. MANORANJAN GOGOI
ONGC DIC M.R BASUMATARY / K.KAMAN MWD Rep. VIKASH KUMAR

HOLE DATA PUMP/MUD DATA


Hole Size 12.25" Bit Jets MP#1 MP#2
Max. Angle 27° P MWD Pump Make BPCL BPCL
PDD 138° P Motor Duplex/Triplex TRIPLEX TRIPLEX
13 3/8" C/SHOE 2000 M P Bit Stroke/Liner 12/6.5 12/6.5
Planned TD 3000 M P Total SPM
Hole Temp SPP Flow Rate(GPM)

BHA COMPONENT SERIAL # LENGTH TOTAL From To Rig


06:00 C/O PJSM.
09:00 MAINTENANCE OF D/W CHAIN.
09:00 10:00 M/A FOR CSG LINE SLIP. SLIPPED 9M CSG
10:00 CNTD R/I FROM P/SHIFT. R/I 30 STDS OF 5
12:00 TAGGED BOTTOM.
12:00 15:30 C&C PRIOR TO FINAL P/O FOR CASING TIL
15:30 18:00 M/A FOR POOH. B/OFF KELLY. P/O 02 SGL
18:00 C/O PJSM.
CONTD. P/O. P/O 45 STDS + 10 SGLS HWD
X-O + 2 SGL 8" D/C + 11 3/4" STD + 1 SGL 8
02:00 B/OFF JAR AND L/DN THE SAME.
02:00 M/A FOR CSG LOWERING. LOWERED 9 5/8
13 JOINTS 9 5/8" CSG.
06:00 CSG FILLED AFTER EVERY 5 JOINTS. FUR
Depths: HRS MWD Tool SDMM JAR MWD BRT
Start: BRT 0.00 BRT 0.00 BRT 18.00 SDMM BRT
End: Circ. 0.00 Circ. 0.00 Circ. 3.00 D-Jar BRT
Meters: Cum Circ. 0.00 Cum Circ. 0.00 Cum Circ. 11.00 MWD ART
Drill Hrs SDMM ART
Cum Drill D-Jar ART
COMMENTS

UEEPL Representatives ONG

RAHUL BAISHYA / NURALAM AHMED MANORANJAN GOGOI / VIKASH KUMAR M.R BA

OPERATING STANDBY ZERO


MWD 0.00 24.00
SDMM 0.00 24.00
JAR 18.00 6.00
DMM/MWD/JAR DAILY REPORT
YCLE FROM 02-03-2024 06:00 HRS TO 03-03-2024 06:00 HRS)
.: VDA/BRD-ONSG/919980/BN6PC22004/9030011134/2022-23

UEEPL REPRESENTATIVES
DIR Rep. RAHUL BAISHYA
DIR Rep. NURALAM AHMED

Density
PV/YP
Sand
Solids
Viscosity
pH
Fluid Type

Rig Activity
PJSM.
NTENANCE OF D/W CHAIN.
FOR CSG LINE SLIP. SLIPPED 9M CSG LINE.
TD R/I FROM P/SHIFT. R/I 30 STDS OF 5" DP + 02 SNGL OF 5"DP. M/UP KELLY
GGED BOTTOM.
C PRIOR TO FINAL P/O FOR CASING TILL SHALE SHAKER CLEAN.
FOR POOH. B/OFF KELLY. P/O 02 SGL OF 5"DP+ 47 STDS OF 5"DP. FDIIP.
PJSM.
NTD. P/O. P/O 45 STDS + 10 SGLS HWDP + JAR + 1 SGL HWDP + 2 STDS 6.5" D/C +
+ 2 SGL 8" D/C + 11 3/4" STD + 1 SGL 8" D/C + B/S + BIT.
FF JAR AND L/DN THE SAME.
FOR CSG LOWERING. LOWERED 9 5/8" CSG SHOE + 2 JOINT + F/COLLAR +
JOINTS 9 5/8" CSG.
G FILLED AFTER EVERY 5 JOINTS. FURTHER CSG LOWERING IS IIIP.
RUN#6 BRT@10:00 HRS ON 01-03-2024

RUN#6 ART@00:00 HRS ON 03-02-2024

ONGC Representatives

M.R BASUMATARY / K.KAMAN


S