JSA For Materia/equipment Loading Unloading & Shifting Work Jsa
JSA For Materia/equipment Loading Unloading & Shifting Work Jsa
JSA For Materia/equipment Loading Unloading & Shifting Work Jsa
Annexure-6
JOB SAFETY ANALYSIS
Reference work
Permit no: Supervisor:
Prepared By:
JOB SAFETY
ANALYSIS
Plant Location: UNIT-1
Department: Project FABRIACTION YARD Reviewed By:
TO NIACINAMIDE
Page 1 of 3
Format No.: EHS-006/F06-00 Effective Date:
Jubilant Infrastructure Limited-Bharuch
Annexure-6
JOB SAFETY ANALYSIS
Structural Inadequate Operator shall check soil condition and see that outriggers are in
material/equipment farana/crane working position before starting lifting operations
lifting platform (due to Crane/farana to be operated within SWL
soft/unstable soil, Certification and color coding of equipment
outrigger not fully All rigging, singing and lifting to be done by competent person
deployed etc) Prior to use, all equipment’s to be visually inspected
Over loading of All persons to be made aware of danger through tool box talk
farana/crane Ensure sufficient room for operation
Damage to lifting Tag line to be attached to load to prevent swinging
equipment since The material not to be stacked too high
inspection Material to be stacked on adequate base
Personnel having body Materials to be secured/covered are kept under shelter
part trapped by load Good housekeeping to be maintained
Moving crane/load Material to be adequately segregated
hitting people / assets
Material stacked too
high
Inadequate base for
storing materials
Tandem lifting of Unbalance of material All the lifting gears to be third party inspected with valid form-
equipment with 02 Miss communication 10
nos faranha between both operator Check the driver license with HWV driving license and
Toppling of the franna. experience of operator.
slip & trip. Farana should not use is pulling of materials.
fall of material Work permit must be obtained before starting the work.
Movement of vehicle Prepare lifting plan for tandem lifting as consider as critical
near tendon lifting/ lifting.
shifting. Proper PPEs like as Helmet, Goggles, Reflective jacket, shoes,
Hand gloves.
Overhead power line proper distance must be maintained.
Root/ground survey shall be done before lifting materials.
Use tag ropes on each side for avoid over swinging.
Lifting plan shall be discussed with the operators
Supervisor/foreman shall monitor the job continuously
The person who are holding tag ropes shall keep safe distance
from the materials.
Evacuate the area and rigger shall ensure all the area while
shifting the materials.
Do not exceed 80% of the rated capacity of the crane for any
loading/ unloading works and or as per manufacturer standards
under any circumstances.
Only single signalman shall give the signal for the farana/crane
operator.
Conducted tool box talk prior to start the work.
Flag man available during shifting reactor
Page 2 of 3
Format No.: EHS-006/F06-00 Effective Date:
Jubilant Infrastructure Limited-Bharuch
Annexure-6
JOB SAFETY ANALYSIS
Permit issuer
Permit acceptor
Prepared by- Permit Issuer and Permit Acceptor Reviewed by-Plant Manager/ Safety officer
Approved by HOD
Page 3 of 3
Format No.: EHS-006/F06-00 Effective Date: