1. Installation environment
2. Unboxing
3. Instrument installation
4. Instrument debugging
5. Preparation before test
6. Calibration
7. Control test
8. Sample test
9. Maintenance
10. Software upgrade
11. Shutdown procedures
1. Installation environment
Temperature: 10-30 °C
F
r
o
n
Analyzer t
2.2 Cut off the straps, remove the plastic film and pull out.
Straps
2. Unboxing
3.1 Install the instrument in the right place, fill in the distilled water to the water
tank and connect the liquid path.
Waste water
Water connector Water sensor sensor
4.1 Power on the machine, using engineer account log in, click confirm to
start machine self check
4.2 Enter the test interface, confirm that each position are correct
2
3. Click
Cuvette
2. Choose
cuvette number
4. Instrument debugging
2. Click
Cleaning
1. Choose
Cleaning
1. Select 3. Click
Probe Cuv Probe Cuv
3. Click
Reagent
1. Manually rotate the stirring motor, the arc of the sample probe
movement shall be at the middle of the cup.
2. Sample probe Z axis limit depth position:After the sample
probe hits the bottom, it is further reduced by 5 steps and 5 steps
until it is reduced to 40 steps when the block is slightly bounced.
3. Select the number of
4. Click Save button
sample needle movement
to save the current
steps to control sample
calibration position
needle movement
4. Instrument debugging
4
3 1. Manually rotate the stirring motor, the arc of the sample
probe movement shall be at the middle of the cup.
2. After confirming the 5-well sample tray, use the 9-well
sample tray to confirm the relevant position. Use the 9-well to
switch to the 9-well mode.
3. Calibration and Confirmation procedures for micro cup and
BCT refer to standard cup procedures.
4. Instrument debugging
5.2 Parameter settings: Click Setting Choose suitable Sample cup type Choose Sample
tray type
5. Preparation before test
5.3 Prepare the reaction cuvette: Click Monitor Mark Place the cuvette into the
reaction disk Click the blank space inside the screen of the reaction disk to mark the reaction
cuvette(Can be marked individually or all together) Save status Close the reaction disk cover
With the use of the reaction disk
control button, gently place in the 1
reaction cuvette. Do not touch the
side of the reaction cuvette 3
Reaction disk
control button
5. Preparation before test
5.4 Prepare the reagent: Place the reagent into the reagent disk in the direction of the icon Click
Reagent Store Select the position of reagent(Click one by one or click Select all) Click Reading
1
After open the bottle cap, insert
the reagent in the direction
indicated by the icon (any
position)
3
5. Preparation before test
1、Take out the 2、Take 100ul 3、Pipette it into 4、Pipette 200ul 5、Place the
calibrator. Reconstitute it calibrator the clean tube distilled water into Calibrator and
and wait for 15 mins. another tube distilled water into
any position of
sample rack
6. Calibration
6.2 Calibration application and result check: Select assay Add Input parameter
information Save Rule Select assay Rule setting Save Test Select assay Start
testing Result
5
3 2
4 8
7
6
1
6. Calibration
9 13
12
11
10
1、Take out the 2、Take 100ul 3、 Pipette it into 4、 Place the control
control. Reconstitute it control. the clean tube into any position of
and wait for 15 mins. sample rack
7. Control Test
7.2 Control test application and result check: Click QC Select assay Add Input control
information Save Rule Select assay Select multi-Westgard rule Test Select assay Start test
result check
6
1
3
4
5 8
2 7
7. Control Test
9 13
12
11
10
8. Sample Test
8.2 Sample test application: Click Sample Select Cup No. Input sample information
Select assay(Single or Combo) Save Start test
4
5
1
3
8. Sample Test
2
3
9. Maintenance
Wipe the probe from up to down Wipe the analysis panel with alcohol gauze
few times with alcohol gauze
9. Maintenance
10.1 Upgrade procedure: Insert pan driver into the USB port of the machine, the machine
will pops up “USB disk found !”. Then start upgrade the software. The upgrade sequence should be
Auxiliary routine Lower computer Upper computer.
10.2 Auxiliary routine upgrade: Click “Select file” Choose “media” “sda1/sda2” GBA-
1000_TemperatureControl_Application.bin “Open” “Start upgrade”. After finished upgrade, the
machine will pops up a dialog shows upgrade success, then turn off the main power switch and
restart the instrument.
10. Software Upgrade
10.3 Lower computer upgrade: Click “Select file” Choose “media” “sda1/sda2” GBA-
1000_MainControlApplication.bin “Open” “Start upgrade”. After finished upgrade, the machine
will pops up a dialog shows upgrade success, then turn off the main power switch and restart the
instrument.
10. Software Upgrade
10.4 Upper computer upgrade: Click “Select file” Choose “media” “sda1/sda2”
SPCProject “Open” “Start upgrade”. After finished upgrade, the machine will pops up a dialog
shows upgrade success, then turn off the main power switch and restart the instrument.
11. Shutdown procedures
Remove the used Cap the reagent bottle Turn off the power Turn off the main
cuvette back into the fridge switch power switch
! Attention!
Make sure the followings before you shut off the analyzer, otherwise it will
result in data loss or instrument failure.
• No test is running, and the analyzer is in standby mode.
• Print completed.
GBA-1000 is successfully installed!