GBA-1000 Installation

Download as pdf or txt
Download as pdf or txt
You are on page 1of 42

Introduction of

GBA-1000 Installation
Catalogue
1. Installation environment
2. Unboxing
3. Instrument installation
4. Instrument debugging
5. Preparation before test
6. Calibration
7. Control test
8. Sample test
9. Maintenance
10. Software upgrade
11. Shutdown procedures
1. Installation environment

1.1 Installation environment requirements

Temperature: 10-30 °C

Relative humidity: ≤ 70%, Non-condensing

1.2 Instrument size


Long: 540mm
Wide: 328mm
High: 515mm
Weight: 35Kg
1. Installation environment requirements

1.3 Space requirements


Unit:mm

F
r
o
n
Analyzer t

1.4 Power Requirements


A grounded power socket is requested.
The distance between socket and instrument must less than 2.5M.
2. Unboxing

2.1 Transportation verification


Make sure the package is not damaged. If it is damaged, please contact the
distributor or Goldsite aftersales department.
2. Unboxing

2.2 Cut off the straps, remove the plastic film and pull out.

Straps
2. Unboxing

2.3 Cut off the 3 straps on the movement module.

Cut off the 3 fixing straps(


X,Y,Z axis) on the
movement parts
2. Unboxing

2.4 According to checklist, confirm everything has been received in good


condition
GBA-1000 Packing List
No. Description Unit Quantity
1 Packing list pc 1
2 GBA-1000 Analyzer Unit 1
3 Power cable pc 1
4 GBA-1000 Analyzer Warranty Card pc 1
5 Reaction cuvette Box 1
6 Operator’s Manual Copy 1
7 Quality Certificate pc 1
8 Thermal Printer Paper Roll 1
9 GBA-1000 Analyzer Quickguide pc 1
Plastic tank (for waste and washing
10 solution)
pc 2
11 Plastic Tank Cover pc 2
12 Inlet tubing pc 1
13 Outlet tubing pc 1
14 5-well Sample Rack pc 1
15 9-well Sample Rack pc 1
3. Instrument installation

3.1 Install the instrument in the right place, fill in the distilled water to the water
tank and connect the liquid path.
Waste water
Water connector Water sensor sensor

Waste water connector


3. Instrument installation

3.2 Connect the power cable and turn on the machine.

Turn on the main switch Turn on the machine


4. Instrument debugging

4.1 Power on the machine, using engineer account log in, click confirm to
start machine self check

Account:FAdmin Click confirm, Start Wait about five minutes,


instrument self check after the self check is
Password:FA123456789
finished, click finish to
enter the main interface.
4. Instrument debugging

4.2 Enter the test interface, confirm that each position are correct
2

Click “Maintenance Test”


4. Instrument debugging

4.3 Read the photoelectric AD value

Read the photoelectric AD value (empty all the


1
cuvettes in the reaction disk): according to
"Maintenance -> Test -> Photoelectric ->
2
Dynamic -> cycles (20 times)-> time interval
3 (1000 MS)-> Execute" as shown in Figure. The
AD value corresponding to each group of
wavelengths is in the range of 58000-61000, and
4 the maximum and minimum difference is ≤200.

The difference should be


less than 200
4. Instrument debugging

4.4 Reaction disk position confirmation:Click“Maintenance ->Test ->Combine -


>Choose cuvette ->Choose cuvette number ->Cuvette,As shown in Figure, the cuvettes 1, 21, 41,
and 61 are sequential selected to see if they meet the requirements.

The cuvette number 1, 21, 41, 61 shall


align with the hole for liquid adding in
the reaction disk cover.
Note: The reaction disk cover must
1. Choose be covered
Cuvette

3. Click
Cuvette
2. Choose
cuvette number
4. Instrument debugging

4.5 Sample probe cleaning position confirmation: Click“Maintenance -


>Test ->Combine.

2. Click
Cleaning
1. Choose
Cleaning

Sample probe Z-axis


depth: The sample probe
Manually rotate the stirring is flush with the panel
motor, the arc of the sample above the black circle.
probe movement shall be at
the middle of the washing
well.
4. Instrument debugging

4.6 Sample probe to reaction cuvette position confirmation:Click “Maintenance


->Test ->Combine ->Choose probe cuv ->Choose cuvette number ->Probe cuv,As shown in
Figure, the cuvettes 1, 21, 41, and 61 are sequentially selected to see if they meet the requirements.

1. Select 3. Click
Probe Cuv Probe Cuv

Manually rotate the stirring motor, the arc of the


2. Select sample probe movement shall be at the middle of
cuvette number the cuvette
4. Instrument debugging

4.7 Probe to Reagent position confirmation:Click “Maintenance ->Test ->Combine -


>Reagent->Choose reagent number->Reagent,as shown in Figure, the reagent position 1, 15, 31,
and 45 are sequentially selected to see if they meet the requirements.
3. The bottleneck of
the bottle faces
inward, in the same
direction as the icon
1. Select
Reagent

3. Click
Reagent

1. Make sure the Reagent bottle is clean and free of liquid


during confirmation.
2. Check whether the reagent bottle mouth is close to the
2. Select reagent
inside (normally close to the inside).
number
3. Manually rotate the stirring motor, the arc of the sample
probe movement shall be at the middle of the bottle.
4. Instrument debugging

4.8 Sample probe to standard cup position calibration: Click “Maintenance -


>Adjust->Sample probe ->Standard cup” to enter the standard cup position calibration interface, as
shown in Figure.(Note: Make sure the cup is clean and free of liquid during calibration)

Only the last position


2. Select the sample needs to be calibrated,
probe movement 1. Choose other positions are
direction Standard Cup automatically calibrated

1. Manually rotate the stirring motor, the arc of the sample probe
movement shall be at the middle of the cup.
2. Sample probe Z axis limit depth position:After the sample
probe hits the bottom, it is further reduced by 5 steps and 5 steps
until it is reduced to 40 steps when the block is slightly bounced.
3. Select the number of
4. Click Save button
sample needle movement
to save the current
steps to control sample
calibration position
needle movement
4. Instrument debugging

4.9 Sample probe standard cup position confirmation:Click “Maintenance ->Test


->Combine ->Standard -> Choose sample well type ->Choose sample position number->Standard.”
As shown in Figure, the sample position 1, 2, 3, 4, 5 are sequentially selected to see if they meet the
requirements as below.
Lift the standard cup manually,
the bottom of the cup must be
2mm away from the probe tip

4
3 1. Manually rotate the stirring motor, the arc of the sample
probe movement shall be at the middle of the cup.
2. After confirming the 5-well sample tray, use the 9-well
sample tray to confirm the relevant position. Use the 9-well to
switch to the 9-well mode.
3. Calibration and Confirmation procedures for micro cup and
BCT refer to standard cup procedures.
4. Instrument debugging

4.10 Bubble remove position confirmation :Maintenance Adjust Sample


probe Bubble
Observe whether the
1 sample probe is in the
center of the silicon gel
and the anti-collision
block is raised by 2mm

Manually rotate the


mixing motor, the arc
of the sample probe
movement must be at
the center of the
2 silicon gel
5. Preparation before test

5.1 Consumable preparations


Water tank preparations: Fill in the distilled water to the clean water tank,
and connect with the liquid path components, tighten it for later use.
5. Preparation before test

5.2 Parameter settings: Click Setting Choose suitable Sample cup type Choose Sample
tray type
5. Preparation before test

5.3 Prepare the reaction cuvette: Click Monitor Mark  Place the cuvette into the
reaction disk Click the blank space inside the screen of the reaction disk to mark the reaction
cuvette(Can be marked individually or all together)  Save status  Close the reaction disk cover
With the use of the reaction disk
control button, gently place in the 1
reaction cuvette. Do not touch the
side of the reaction cuvette 3

Reaction disk
control button
5. Preparation before test

5.4 Prepare the reagent: Place the reagent into the reagent disk in the direction of the icon Click
Reagent Store Select the position of reagent(Click one by one or click Select all)  Click Reading
1
After open the bottle cap, insert
the reagent in the direction
indicated by the icon (any
position)

3
5. Preparation before test

5.5 Liquid path perfusion:Click maintenance Daily Perfusion( 3 times) Exhaust( 1


time)make sure the liquid path filled with distilled water

Make sure the water flow is


a continuous straight line
6. Calibration

6.1 Calibration, prepare calibrator and distilled water

1、Take out the 2、Take 100ul 3、Pipette it into 4、Pipette 200ul 5、Place the
calibrator. Reconstitute it calibrator the clean tube distilled water into Calibrator and
and wait for 15 mins. another tube distilled water into
any position of
sample rack
6. Calibration

6.2 Calibration application and result check: Select assay Add Input parameter
information Save Rule Select assay Rule setting Save Test Select assay Start
testing Result
5

3 2
4 8
7

6
1
6. Calibration

6.3 Calibration application and result check

9 13

12
11

10

“Y” means calibration


successful
7. Control Test

7.1 Control test, prepare control

1、Take out the 2、Take 100ul 3、 Pipette it into 4、 Place the control
control. Reconstitute it control. the clean tube into any position of
and wait for 15 mins. sample rack
7. Control Test

7.2 Control test application and result check: Click QC Select assay Add Input control
information Save Rule Select assay Select multi-Westgard rule Test  Select assay Start test
 result check
6
1
3
4
5 8

2 7
7. Control Test

7.3 Control test and result check

9 13

12

11

10
8. Sample Test

8.1 Sample test, prepare sample

1、 Pipette it into the clean 2、 Place the sample into any


tube(BCT, Micro cup or EP position of sample rack
tube all support)
8. Sample Test

8.2 Sample test application: Click Sample Select Cup No. Input sample information
Select assay(Single or Combo) Save Start test
4

5
1

3
8. Sample Test

8.3 Sample result check


1

2
3
9. Maintenance

9.1 Daily maintenance

Wipe the probe from up to down Wipe the analysis panel with alcohol gauze
few times with alcohol gauze
9. Maintenance

9.2 Weekly maintenance

Place 3cm depth of 70% alcohol liquid or


cleaning solution into blood collection
tube and put it into sample position 1,
then perform probe wash
10. Software Upgrade

10.1 Upgrade procedure: Insert pan driver into the USB port of the machine, the machine
will pops up “USB disk found !”. Then start upgrade the software. The upgrade sequence should be
Auxiliary routine Lower computer Upper computer.

Click “Maintenance Test 


Upgrade” to enter the Upgrade
interface
10. Software Upgrade

10.2 Auxiliary routine upgrade: Click “Select file” Choose “media” “sda1/sda2” GBA-
1000_TemperatureControl_Application.bin “Open” “Start upgrade”. After finished upgrade, the
machine will pops up a dialog shows upgrade success, then turn off the main power switch and
restart the instrument.
10. Software Upgrade

10.3 Lower computer upgrade: Click “Select file” Choose “media” “sda1/sda2” GBA-
1000_MainControlApplication.bin  “Open” “Start upgrade”. After finished upgrade, the machine
will pops up a dialog shows upgrade success, then turn off the main power switch and restart the
instrument.
10. Software Upgrade

10.4 Upper computer upgrade: Click “Select file” Choose “media” “sda1/sda2”
SPCProject  “Open” “Start upgrade”. After finished upgrade, the machine will pops up a dialog
shows upgrade success, then turn off the main power switch and restart the instrument.
11. Shutdown procedures

Remove the used Cap the reagent bottle Turn off the power Turn off the main
cuvette back into the fridge switch power switch

! Attention!
Make sure the followings before you shut off the analyzer, otherwise it will
result in data loss or instrument failure.
• No test is running, and the analyzer is in standby mode.
• Print completed.
GBA-1000 is successfully installed!