SERVICE PROCEDURE:

NOTE: It is NOT necessary to contact Powertrain Call Center (PCC) for approval. A
VCAN is not required.
For KICKS:

1. Replace the CVT Assembly per the ESM: TRANSMISSION & DRIVELINE > CVT:
RE0F11B > UNIT REMOVAL AND INSTALLATION, TRANSMISSION ASSEMBLY >
Removal and Installation.

2. Also follow Inspection & Adjustment Before and After Installation ESM:
TRANSMISSION & DRIVELINE > TRANSAXLE & TRANSMISION > CVT: RE0F11B >
UNIT REMOVAL AND INSTALLATION, TRANSMISSION ASSEMBLY > Inspection and
Adjustment.

 Using the ESM procedure, follow all Warnings, Cautions, Notes and Torque
requirements during the Removal and Installation procedure.

WARNING: Do not remove the coolant reservoir tank cap when the engine is hot.
Serious burns could occur from high pressure engine coolant escaping from the
reservoir tank. Wrap a thick cloth around the cap. Slowly turn it a quarter turn to
allow built-up pressure to escape. Carefully remove the cap by turning it all the way.

CAUTION:
 Perform these steps after the coolant temperature has cooled sufficiently.
 When replacing transaxle assembly, perform “ADDITIONAL SERVICE WHEN
REPLACING TRANSAXLE ASSEMBLY”.

NOTE: When removing components such as hoses, tubes/lines, etc., cap or plug
openings to prevent fluid from spilling.

*These CVTs will be placed on parts return back to the Field Quality Center.
Please direct the parts attention to “FQA” while following the standard
campaign parts return process.

1/4
For VERSA:

1. Replace the CVT Assembly per the ESM: TRANSMISSION & DRIVELINE >
TRANSAXLE & TRANSMISSION > CVT: RE0F11B > UNIT REMOVAL AND
INSTALLATION, TRANSMISSION ASSEMBLY > Removal and Installation.

2. Also follow Inspection & Adjustment Before and After Installation ESM:
TRANSMISSION & DRIVELINE > TRANSAXLE & TRANSMISION > CVT: RE0F11B
> UNIT REMOVAL AND INSTALLATION, TRANSMISSION ASSEMBLY > Inspection
and Adjustment.

 Using the ESM procedure, follow all Warnings, Cautions, Notes and
Torque requirements during the Removal and Installation procedure.

WARNING: Do not remove the coolant reservoir tank cap when the engine is hot.
Serious burns could occur from high pressure engine coolant escaping from the
reservoir tank. Wrap a thick cloth around the cap. Slowly turn it a quarter turn to
allow built-up pressure to escape. Carefully remove the cap by turning it all the way.

CAUTION:
 Perform these steps after the coolant temperature has cooled sufficiently.
 When replacing transaxle assembly, perform “ADDITIONAL SERVICE WHEN
REPLACING TRANSAXLE ASSEMBLY”.

NOTE: When removing components such as hoses, tubes/lines, etc., cap or plug
openings to prevent fluid from spilling.

*These CVTs will be placed on parts return back to the Field Quality Center.
Please direct the parts attention to “FQA” while following the standard
campaign parts return process.

2/4
PARTS INFORMATION:
Description Part # Quantity
AUTOMATIC TRANSAXLE 31020-50X5A 1
NUT 01223-00231 4
NUT 01225-N0011 2
NUT 01225-N2011 2
WASHER DRAIN 11026-JA00A 1
GASKET-INTAKE MANIFOLD 14035-5RL0A 1
GASKET-INTAKE MANIFOLD 16175-5RB0A 1
CLAMP 16439-7S01E 2
NUT-FIX, EXHAUST TUBE 20602-9U20B 2
GASKET-EXHAUST 20691-19B0A 1
GASKET-EXHAUST 20692-1HA0A 1
SEAL-O RING 31084-3Z000 1
PIN-COTTER 40073-0L700 2
NUT-LOCK, FRONT WHEEL B 40262-4M400 2
NUT 54588-1HA0C 4
NS-3 CVT FLUID 999MPCV0NS3 12
NISSAN LONG LIFE 999MPL25500P 3
COOLANT BLUE

3/4
CLAIMS INFORMATION

Submit claim using the following claims coding:

Work Order Line Type: “CM” Campaign

Campaign: PM963
Claim Type: CM

PNC: PM963

Symptom: ZZ

Diagnosis: 99

Flat Parts Expense


Op
Description: Rate Required Code
Codes
Time on claim Required

Replace CVT Assembly (Versa) PM9630 7.5 Hr Yes NO

Replace CVT Assembly (KICKS) PM9631 7.3 Hr YES NO