DEPARTMENT OF PUBLIC WORKS & HIGHWAYS

Contract ID No.: 24OB0426


Contract Name: Construction of Multi-Purpose Building including Facilities at Highway Hills Integrated School, Mandaluyong City
Location of the Contract: Mandaluyong City
BILL OF QUANTITIES
No. ________

Part No. ______________ Part Description: ________________


ITEM UNIT PRICE AMOUNT
DESCRIPTION UNIT QUANTITY
NO. (Pesos) (Pesos)
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
PART I FACILITIES FOR THE ENGINEER - -
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
Provision of Field Office for the _________________________________ _________________________________
A.1.1(8) month 5.00
Engineer (rental basis) _________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
PART II OTHER GENERAL REQUIREMENTS - -
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
B.5(1) Project Billboard/Signboard set 1.00
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
Occupational Safety and Health _________________________________ _________________________________
B.7(1) l.s. 1.00
Program _________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
B.9(1) Mobilization/Demobilization l.s. 1.00
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
CIVIL, MECHANICAL, ELECTRICAL _________________________________ _________________________________
PART III - -
AND SANITARY / PLUMBING WORKS _________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
PART A. EARTHWORKS - - _________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
Removal of Structures and _________________________________ _________________________________
101(1) l.s. 1.00
Obstruction _________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
803(1)c Structure Excavation (Solid Rock) cu.m. 416.44
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
Embankment from _________________________________ _________________________________
_________________________________ _________________________________
804(1)a Roadway/Structure Excavation cu.m. 196.12
_________________________________ _________________________________
(Common Soil) _________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
PLAIN AND REINFORCED CONCRETE _________________________________ _________________________________
PART B. - -
WORKS _________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
SUB-TOTAL

GRAND TOTAL
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS

Contract ID No.: 24OB0426


Contract Name: Construction of Multi-Purpose Building including Facilities at Highway Hills Integrated School, Mandaluyong City
Location of the Contract: Mandaluyong City

BILL OF QUANTITIES
No. ________

Part No. ______________ Part Description: ________________

ITEM UNIT PRICE AMOUNT


DESCRIPTION UNIT QUANTITY
NO. (Pesos) (Pesos)
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
Structural Concrete (4,000 PSI, Class _________________________________ _________________________________
900(1)h cu.m. 20.32
A, 14 Days) _________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
901(1) Lean Concrete cu.m. 4.93
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
Reinforcing Steel (Deformed, Grade _________________________________ _________________________________
902(1)a1 kgs. 1,487.37
40) _________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
Reinforcing Steel (Deformed, Grade _________________________________ _________________________________
902(1)a2 kgs. 1,654.58
60) _________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
903(1) Formworks and Falseworks l.s. 1.00
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
Formworks and Falseworks (Vertical _________________________________ _________________________________
903(2) sq.m. 103.24
Shoring) _________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
FINISHINGS AND OTHER CIVIL _________________________________ _________________________________
PART C. - -
WORKS _________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
C.1 FABRICATED MATERIALS - -
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
1047(7) Structural Steel l.s. 1.00
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
C.2 FINISHING WORKS - -
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
1027(1) Cement Plaster Finish sq.m. 360.38
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
C.3 PLUMBING WORKS - -
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
SUB-TOTAL

GRAND TOTAL
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS

Contract ID No.: 24OB0426


Contract Name: Construction of Multi-Purpose Building including Facilities at Highway Hills Integrated School, Mandaluyong City
Location of the Contract: Mandaluyong City

BILL OF QUANTITIES
No. ________

Part No. ______________ Part Description: ________________

ITEM UNIT PRICE AMOUNT


DESCRIPTION UNIT QUANTITY
NO. (Pesos) (Pesos)
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
1016(1)b Waterproofing (Liquid) sq.m. 87.97
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
1002(28) Cold Water Line l.s. 1.00
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
In Words: Pesos: __________________ In Words: Pesos: __________________
_________________________________ _________________________________
_________________________________ _________________________________
1201(7)a Water Tank set 1.00
_________________________________ _________________________________
_________________________________ _________________________________
In Figures: In Figures:
SUB-TOTAL

GRAND TOTAL

AMOUNT IN WORDS: ____________________________________________________________________________________


___________________________________________________________________________
Submitted By: Date: _____________________
Calendar Days: 150
Name & Signature of Bidder's Representative

Position

Name of Firm

Address
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS

Contract ID No.: 24OB0426


Contract Name: Construction of Multi-Purpose Building including Facilities at Highway Hills Integrated School, Mandaluyong City
Location of the Contract: Mandaluyong City

SUMMARY OF BID PRICE


(All Parts of Bill Quantities)

Contract ID:
Part No. Part Description Total Amount

TOTAL AMOUNT IN WORDS:

Name: _____________________________________________________________________________________ in the capacity as: ________________________

Signed: _____________________________________________________________________________________ Date: ___________________________________

Duly authorized to sign the Bid for and/or in behalf of: ___________________________________________________________________________________
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS

Contract ID No.: 24OB0426


Contract Name: Construction of Multi-Purpose Building including Facilities at Highway Hills Integrated School, Mandaluyong City
Location of the Contract: Mandaluyong City

MINIMUM EQUIPMENT REQUIRED

DESCRIPTION CAPACITY NUMBER OWNED LEASED


Crawler Crane, Standard
- 1
Boom, Hydraulic Operated
Service Truck - 1

Mixer Truck - 1
Portable Breaker Portable
- 1
Petrol Breaker, BHF30S,
One Bagger Mixer - 1

Dump Truck - 1

Elf Truck - 2

Concrete Vibrator - 1

Bar Cutter - 1

Bar Bender - 1

Welding Machine - 1

Chain Block - 1

Jack Hammer - 1

- - -

- - -

- - -

- - -

- - -

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

*Minimum Testing and Equipment Materials in accordance with D.O. # 86 series of 1990*

* SHOW PROOF OF OWNERSHIP.

THE LEASED EQUIPMENT SHALL BE LISTED


IN DETAIL TO INCLUDE THE BRAND, SERIAL NO.,
CAPACITY, AND PRESENT LOCATIONS,