Govt. of Bihar: Section at B - B: Weir Portion
Govt. of Bihar: Section at B - B: Weir Portion
Govt. of Bihar: Section at B - B: Weir Portion
1200
R.C.C M 25 3:1 Boulder Pitching
1250500
1000
:1
R.L +48.50 12. Any discrepancy noticed in the drawing should be brought to
1000
1200
300
R.L +48.30 1
R.L +47.50 the notice of the chief engineer.
300 mm P.C.C M 10
300
1000
1200
13. The minimum cover in bottom raft is 75 mm and in other
1000
component 40 mm.
R.L +45.80
14. Earthen embankment of bund must be negotiated.
500 15. Angle of internal friction of back fill material of wing wall and
abutment should not be less then 30 deg.
R.L +43.00
16. Joint with water seal shall be provided at all junction of
SHEET PILE LINE
structure.
17. The actual dimension of block outs , embedded parts & gate
R.L +40.00 shall be obtained from gate design.
WEIR AXIS
6050 750
R.L +57.15 3750
R.L +56.50
R.L +55.90 R.L +55.90
1200
1
R.L +50.00 R.L +49.80
1000
1200
300
1200
P.C.C M 15
1800
2400
R.L +48.50
1000
300
R.L +47.30
1000
R.L +46.00
3700 13200 300 mm P.C.C M 10 GOVT. OF BIHAR
SHEET PILE LINE WATER RESOURCES DEPARTMENT
R.L +44.00 CHIEF ENGINEER , IRRIGATION CREATION W.R.D DARBHANGA
CONSTRUCTION OF GATED WEIR & ALLIED STRUCTURES IN THE RIVER
8000 3650 6000 4000 2000 6600 12000 7325 15000 SUGERWAY AT MADANPATTI , PHULPARAS BLOCK MADHUBANI
500 500
12150 30600 22825
65575
Western Kosi Canal division Design and Mont. Division Western Kosi Canal Circle
Jhanjharpur Darbhanga Jhanjharpur
Approved by
SECTION AT B - B : WEIR PORTION