B

PLINTH BEAM P.L. BABBAR

as applicable
P.L.
RESIDENCE
PLINTH BEAM TYPICAL PEDESTAL DETAILS
N.G.L. N.G.L.
N.G.L.

12"
PEDESTAL GENERAL NOTES

3"
1.
PEDESTAL BARS PEDESTAL TIES PEDESTAL 2.
PEDESTAL TIES 3.

12"
4'-0"
10 Ø @ 5" C/C

18"
PEDESTAL BARS COL.

4'-0"
AST

D
15"

3"
d
12"

D
5"
P:C:C: 1:5:10

d
3" 9" 3"
3" LXB 3"

5"
P:C:C: 1:5:10
LxB 3" BARS8-:1-0Ø
DETAIL OF FOOTING SECTION AT A-A
9"
10 Ø @ 5" C/C 10 Ø @ 5" C/C TE
I8-:Ø2elgged@6"cc/
TYPICAL FOOTING FOR SEC. AT-B-B
TOP PLAN OF OF FOOTING TYPICAL PEDESTAL DETAILS
9"

1
4 2"

3"
DETAIL OF PLINTH BAND P.L.
4 - T 12 PLINTH BEAM P.L.

12"
as applicable
9"

PLINTH BEAM COL.


TIE :- 8 Ø 2 legged @ 6" c/c
9" N.G.L.

3"
PB-A
N.G.L. N.G.L.
4 - T 12 PEDESTAL

12"
PEDESTAL 3" 9" 3"
PEDESTAL TIES
TIE :- 8 Ø 2 legged @ 6" c/c

12"
DPC PEDESTAL BARS PEDESTAL TIES PEDESTAL BARS
FFL BARS8-:1-0Ø

8'-0"
8'-0"
10 Ø @ 5" C/C AST
PLINTH 1
arch drg

4 2" TE
I8-:Ø2elgged@6"cc/
AS per

BAND 12"

D
D
15"
FFL

d
d
DPC
N.G.L.

ARCH DRG

5"
5"
PB-A P:C:C: 1:5:10 P:C:C: 1:5:10

AS PER
LxB 3"
3" LXB 3"

N.G.L. DETAIL OF FOOTING SECTION AT D-D TYPICAL FOOTING FOR SEC. AT-C-C
3'-0"

1
132" FOOTING SCHEDULE FOR COLUMNS STARTS FROM B.F.L.
5" 6" 6" 6" 6"

9"
5" 6" 6" 6"

18"
1 1 THICKNESS OF REINF. IN
2'-6"

222" 132" FOOTING SIZE OF P.C.C. SIZE OF R.C.C. REFER SEC.


FOUNDATION BASE BOTHWAY
EQ EQ NO. LXB LXB
27" EQ 18" EQ
d D AST
PCC 1:5:10 PCC 1:5:10 F-1 3'-3" x 5'-6" 3'-0" x 5'-0" 9" 12" 10 Ø @ 5" C/C SEC -A-A
3'-0" 2'-6"
5'-0" x 5'-0"
F-2 5'-6" x 5'-6" 9" 15" 10 Ø @ 5" C/C SEC -A-A
DETAIL OF FOOTING DETAIL OF FOOTING REFERENCE/REVISIONS
AT 9" THK. BK WALL (W.F.-1)
AT 412" THK. BK WALL(W.F.-2) F-3 3'-3" x 5'-6" 3'-0" x 5'-0" 9" 18" 10 Ø @ 5" C/C SEC -C-C DATE
NO. REVISION/ISSUE

F-4 6'-0" x 6'-0" 5'-6" x 5'-6" 9" 18" 10 Ø @ 5" C/C SEC -D-D

TITLE :-
NOTES Conjuction with the architecture drawings. (3) BEAMS = 20 mm (4) SLABS = 20 mm FOUNDATION DETAIL

1. Contractor to Check & verify all dimensions 7. In case of any ambiguty in structure DRG. NO. : ST.202
10. LAP LENGTH / ANCHORAGE LENGTH
drawing clerification may be sorted. DATE:-15/04/2022 SCALE : NTS
before execution of the work. i ) 50 d IN CASE OF FOUND., BEAM & SLAB
2. Figured dimensions shall be followed. 8a. Conc mix to be used as follow: S.NO. : 01 DEALT BY:SUSHMA
ii )45 d IN CASE OF COLUMN
a. M25 for foundation ARCHITECT OWNER
3. All dimensions are given in FEET & INCHES b. M25 for columns & Retaining walls WHERE d IS DIA SWATI GROVER JITENDER BABBAR

4. Brick used in masnory shall have Crushing c. M25 for slab beams 11. FOUNDATION IS DESIGNED FOR
strength not less than 100kg/Cm2. d. M25 for slab. G.F. + F.F.+ S.F.
5. The reinforcement shall be of high strength 9. Minimum nominal cover to all reinforcement 12. FOUNDATION IS DESIGNED FOR SAFE
deformed bars as per I.S.1786-1985 LINKS IF ANY I/C. BEARING CAPACITY 11 TON/M2 * ARCHITECTS *PLANNERS * CONSULTANTS *
* INTERIOR DESIGNERS *
Fe 500N/mm2. SHALL BE AS PER IS 456-2000 AS UNDER:- 1.2 MTS DEPTH #1006, Sector-10, Panchkula, Haryana.
6. The structure drawings should be read in (1) FOUN. = 50 mm. (2) COLUMN = 40 mm M No. +91- 9988256953.

You might also like