RAIPUR DIVISION-GATI SHAKTI/SOUTH EAST CENTRAL RLY

TENDER DOCUMENT
Tender No: DyCE-GSU-R-T-19-23-24 Closing Date/Time: 10/05/2024 11:00

CPM(GSU)/Raipur acting for and on behalf of The President of India invites E-Tenders against Tender No DyCE-GSU-R-T-19-23-24 Closing Date/Time 10/05/2024 11:00 Hrs. Bidders will be able to submit their
original/revised bids upto closing date and time only. Manual offers are not allowed against this tender, and any such manual offer received shall be ignored.

1. NIT HEADER

Name of Work Major upgradation of Durg Railway Station of SECR on Engineering, Procurement and Construction (EPC) mode.
Bidding type EPC [ Single Stage ]
Tender Type Open Bidding System Two Packet System
Tender Closing Date Time 10/05/2024 11:00 Date Time Of Uploading Tender 02/03/2024 19:22
Pre-Bid Conference Required Yes Pre-Bid Conference Date Time 03/04/2024 11:00
2nd Pre-Bid Conference Required No 2nd Pre-Bid Conference Date Time Not Applicable
Advertised Value 3699015962.00 Tendering Section GSU/WORKS
Bidding Style Single Rate for Each Schedule Bidding Unit
Earnest Money (Rs.) 18495100.00 Validity of Offer ( Days) 120
Tender Doc. Cost (Rs.) 0.00 Period of Completion 36 Months
Contract Type Works Contract Category Expenditure
Bidding Start Date 26/04/2024 Are Joint Venture (JV) firms allowed to bid Yes
Ranking Order For Bids Lowest to Highest Expenditure Type Station Development
Docs. Receipt Confirmation Required

2. SCHEDULE

S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Above/
Schedule A-Major upgradation of Durg Railway Station of SECR. 3699015962.00
Below/Par
Lump Sum 3699015962.00 AT Par 3699015962.00
1
Description :- Major upgradation of Durg Railway Station of SECR.

3. ITEM BREAKUP

No item break up added

4. ELIGIBILITY CONDITIONS

Important : All documents uploaded and remarks / confirmation entered by the bidders against any eligibility condition shall be opened as part of technical bid only

Special Technical Criteria

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading
Technical Capacity : For demonstrating Technical Capacity and experience (the Technical Capacity), the Bidder shall, over the past 5 (five)
Financial Years preceding the Bid Due Date, received payments for construction of Eligible Project(s) such that the amount is atleast; (a) 60%
(sixty percent) of Estimated Project Cost from One Eligible Project, OR, (b) 40% (forty percent) of Estimated Project Cost from each of the
Two Eligible Projects OR, (c) 30% (thirty percent) of Estimated Project Cost from each of the Three Eligible Projects. For the purpose of
Technical Capacity, the projects shall qualify as Eligible Projects, the Eligible Projects if they meet both of the following criteria; 1) Projects
where works contract are directly given to the Bidder by a Govt. Department; or by a Public listed company having average annual turnover of
Rs.500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock
Allowed
1 Exchange, registered at least 5 years back from the date of submission of Bid by the Bidder to the Authority. AND 2) Projects where the No No
(Mandatory)
Bidder have received payments for not less than 75 (seventy five) per cent value of awarded project cost of such project as per the original
agreement under the following categories: (i) Passenger terminals shall mean having a minimum passenger handling capacity of 5000 persons
/day in railway stations, metro stations, airport terminals (with or without related airport infrastructure works), ports, integrated check posts, and
bus terminals; OR (ii) Social and Commercial infrastructure shall mean: (a) Commercial real estate project (such as educational institution,
hospital, hotel, convention centre, mall/shopping complex, sports complex, office complex) at a single site with a minimum built up area of
15,000 (Fifteen thousand) square metres; or (b) Residential real estate project /residential township at a single site with a minimum built up
area of 30,000 (Thirty thousand) square metres;

Special Financial Criteria

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading
Financial Capacity: The Bidder shall have a minimum Net Worth (the Financial Capacity) of 15% (Fifteen percent) of the Estimated Project Allowed
1 No No
Cost at the close of the preceding Financial Year. (Mandatory)

Bidders shall confirm and certify on the behalf of the tenderer including its constituents as under:

S.No. Description
1 I/we the tenderer (s) am/are signing this document after carefully reading the contents.
2 I/We the tenderer(s) also accept all the conditions of the tender and have signed all the pages in confirmation thereof.
I/we hereby declare that I/we have downloaded the tender documents from Indian Railway website www.ireps.gov.in . I/we have verified the content of the document from the website and there is no
3 addition, no deletion or no alteration to the content of the tender document. In case of any discrepancy noticed at any stage i.e. evaluation of tenders, execution of work or final payment of the
contract, the master copy available with the railway Administration shall be final and binding upon me/us.
4 I/we declare and certify that I/we have not made any misleading or false representation in the forms, statements and attachments in proof of the qualification requirements.
5 I/We also understand that my/our offer will be evaluated based on the documents/credentials submitted along with the offer and same shall be binding upon me/us.
I/We declare that the information and documents submitted along with the tender by me/us are correct and I/we are fully responsible for the correctness of the information and documents, submitted
6
by us.
I/we certify that I/we the tenderer(s) is/are not blacklisted or debarred by Railways or any other Ministry / Department of Govt. of India from participation in tender on the date of submission of bids,
7
either in individual capacity or as a HUF/ member of the partnership firm/LLP/JV/Society/Trust.
I/we understand that if the contents of the certificate submitted by us are found to be forged/false at any time during process for evaluation of tenders, it shall lead to forfeiture of the Bid Security
8 and may also lead to any other action provided in the contract including banning of business for a period of upto two year. Further, I/we and all my/our constituents understand that my/our offer shall
be summarily rejected.
I/we also understand that if the contents of the certificate submitted by us are found to be false/forged at any time after the award of the contract, it will lead to termination of the contract, along with
9
forfeiture of Bid Security/Security Deposit and Performance guarantee and may also lead to any other action provided in the contract including banning of business for a period of upto two year.
I/We have read the clause regarding restriction on procurement from a bidder of a country which shares a land border with India and certify that I am/We are not from such a country or, if from such
10 a country, have been registered with the competent Authority. I/We hereby certify that I/we fulfil all the requirements in this regard and am/are eligible to be considered (evidence of valid registration
by the competent authority is enclosed)

Partnership firm/Joint Venture (JV) / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc.

S.No. Description
Partnership firm/Joint Venture (JV) / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc. Please submit a certificate in the prescribed format (please download the format
from the link given below). Non submission of the certificate, or submission of certificate either not properly filled in, or in a format other than the prescribed format shall lead to summary rejection of
1
your offer.
( Click here to download the Format of Self Certification)

Pa g e 1 o f 6 Ru n Da te/Time: 14/0 3/2 0 2 4 19 :44:40


RAIPUR DIVISION-GATI SHAKTI/SOUTH EAST CENTRAL RLY
TENDER DOCUMENT
Tender No: DyCE-GSU-R-T-19-23-24 Closing Date/Time: 10/05/2024 11:00

5. COMPLIANCE

Important : All documents uploaded and remarks / confirmation entered by the bidders against any compliance condition shall be opened as part of technical bid only.

Commercial-Compliance

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading
Allowed
1 Please refer RFP Documents for all details. No No
(Mandatory)
Allowed
2 Bidders are requested to quote their Permanent Account Number in the tender offer. No No
(Mandatory)
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully
Allowed
3 indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as No Yes
(Optional)
incorporated in the tender conditions.

General Instructions

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading
1 Please refer RFP Document for all details. No No Not Allowed
2 Bidders are requested to quote rate in Financial offer tab provided for this purpose during submission of e-tender. No No Not Allowed

Undertakings

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading
1 I/We have carefully gone through the entire tender documents, including all the documents attached with the tender. No No Not Allowed
2 I/ We have visited the works site and I / We am / are aware of the site conditions. No No Not Allowed

Physical Docs Mandatory Submission

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading
Allowed
1 Please refer to RFP Document Clause No. 2.11.2 for all details and submit physical mandatory documents accordingly. No No
(Mandatory)

Custom

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading

6. Documents attached with tender

S.No. Document Name Document Description


20 AR STN BLDG SW GRD AND 1ST
1 20ARStationbuildingSW_GroundfirstfloorplanDurg_V3_APPROVE_P29_compressed.pdf
FLR p
2 03lAR184_IS_01_TD_01L01_Surveyplan_APPROVE_P11_1.pdf 03 AR 184 Survey plan
82 AR Views SSE ElecG SSE Works
3 82AR3dViews_SSEElecG_SSEWorksofficeSSEPway_APPROVE_P11.pdf
of
4 85AR184_IS_01_TD_03mD05_3dViews_FacadeLightingSchemes_V1_APPROVE_P7.pdf 85 AR Views Facad Lhng Shm
5 91AR184_IS_01_TD_03sS01_SSEPway_Sectionelevation_APPROVE_P11.pdf 91 AR 184 Pway Section and elevatio
93 AR SSE Works and SSEE lectricG
6 93AR184_IS_01_TD_03tS01_SSE_Works__SSEElectricG_SectionElevation_APPROVE_P11.pdf
a
7 122HVACStationBuildingSouthWestFrontEntry_ConcoursefloorPlans_HVAClayout_V2_APPROVE_P10.pdf 122 HVAC Stn Bldng S West Front Ent
8 127HVACReserveLounge_Allfloorplans_HVAClayout_APPROVE_P6.pdf 127 HVAC Rev Lo All flor plans HVAC
9 130SSE_Works__SSEElectricG_AllFloorPlan-HVAC_APPROVE_P6.pdf 130 SSE Works and SSE ElectricG All
10 134FFStationBuildingSouthWest_RetiringTerracefloorplan_Firefightinglayout_APPROVE_P6.pdf 134 FF Stn Bdng S West Retiring and
11 136FFStationBuildingNorthEast_Concourseterracefloorplan_Firefightinglayout_APPROVE_P5.pdf 136 FF Stn Blng North East Conco an
12 137FF184_IS_01_TD_FF_06dP01_Concourse_level_plan_Firefightinglayout_APPROVE_P5.pdf 137 FF Concourse level plan Firefi
13 154StationBuildingSouthWestFrontEntry_GroundFirstfloorPlans_Electricallayout_APPROVE_P4.pdf 154 Stn Bldg S West Front Entry Gr
14 155ELStationBuildingSouthWest_GroundFirstfloorPlans_Informationsystem_APPROVE_P6.pdf 155 EL Stn Bldg S West G and F floo
15 157ELStationBuildingSouthWestConcoursefloorPlans_Informationsystem_V2_APPROVE_P10.pdf 157 EL Stn Bldg S West Concourse f
16 159ELStationBuildingSouthWest_ServiceretiringfloorPlans_Informationsystem_APPROVE_P6.pdf 159 EL Stn Bldg S West Service and
17 160ELStationBuildingNortheastRearEntry_GroundFirstfloorPlans_Electricallayout_APPROVE_P4.pdf 160 EL Stn Bldg N East Rear Entry G
18 160ELStationBuildingSouthWest_Concoursefloorplan_Electrical_APPROVE_P4.pdf 160 EL Stn Blng S West Con flor pla
19 161ELStationBuildingNortheastGroundFirstfloorPlans_Informationsystem_APPROVE_P6.pdf 161 EL Stn Bldg N east G and F floo
20 169EL184_IS_01_TD_EL_07jP01a_RPFBarracksMale_Allfloorplans_Informationsystemlayout_APPROVE_P7.pdf 169 EL Baracks Male All floor plans
21 170ELRPFBarracksFemale_Allfloorplans_Electricallayout_APPROVE_P4.pdf 170 EL RPF Baracks Femal Al flor pl
22 171ELRPFBarracksFemale_Allfloorplans_Informationsystemlayout_APPROVE_P7.pdf 171 EL RPF Barks Female All flor pl
23 172EL184_IS_01_TD_EL_07jP03_RPFPost_Allfloorplans_Electricallayout_APPROVE_P4.pdf 172 EL 184 RPF Post All floor plans
24 177EL184_IS_01_TD_EL_07mP01a_CrewLobby_Allfloorplans_Informationsystemlayout_APPROVE_P7.pdf 177 EL 184 TD Crew Loby Al flor pl
178 EL SSE Works and SSE EletricG
25 178ELSSE_Works__SSEElectricG_Allfloorplans_Electricallayout_APPROVE_P4.pdf
A
26 181EL184_IS_01_TD_EL_07nP01a_SSEPwayoffice_Allfloorplans_Informationsystemlayout_APPROVE_P7.pdf 181 EL 184 SSE Pway offce Al flor p
27 84AR184_IS_01_TD_03mD04b_StationBuilding_NorthEast_ExclusiveArtwork_APPROVE_P7.pdf 84 AR 184 Stn Bldg North East Exclu
28 81AR184_IS_01_TD_03mD03j_3dViews_CrewLobby_APPROVE_P11.pdf 81 AR 184 Views Crew Loby
29 79AR184_IS_01_TD_03mD03h_3dViews_PublicToilet_APPROVE_P11.pdf 79 AR 184 TD View Pblc Tolet
30 75AR184_IS_01_TD_03mD03d_3dViews_ResidentialBuildings_APPROVE_P12.pdf 75 AR 184 Views Rdial Bdng
31 73184_IS_01_TD_03mD03b_3dViews_StationfrontrearBuildingarialviews_V1_APPROVE_P14.pdf 73 184 views Stn frt a rear Bdng ar
32 05AR184_IS_01_TD_01L02a_Superimposeplan_V2_APPROVE_P15.pdf 05 AR 184 Superimpose plan
33 12AR184_IS_01_TD_02L03aiCirculationPlan_SWfrontentry_GroundFirstfloorplan_APPROVE_P12_compressed_compressed1_11zon2.pdf 12 AR Circu Plan SW fro ent Gro And
34 24ARStationBuilding_SouthWest_SectionsDURG_V2_APPROVE_P23.pdf 24 AR Stat Buil Sout Wes Sect DURG
35 25ARStationBuilding_Southwest_elevation-Front_V3_APPROVE_P25.pdf 25 AR Stat Buil Sou west ele Fron
36 28AR184_IS_01_TD_03bS01_StationBuilding_NorthEastRearEntry_Section_V2_APPROVE_P16.pdf 28 AR Sta Bui Nor East Rear Ent Sec
37 29AR184_IS_01_TD_03bE01_StationBuilding_NorthEastRearEntry_Elevation_V3_APPROVE_P16.pdf 29 AR Stat Buil Nor East Rea Entr E

Pa g e 2 o f 6 Ru n Da te/Time: 14/0 3/2 0 2 4 19 :44:40


RAIPUR DIVISION-GATI SHAKTI/SOUTH EAST CENTRAL RLY
TENDER DOCUMENT
Tender No: DyCE-GSU-R-T-19-23-24 Closing Date/Time: 10/05/2024 11:00

38 41ARTYPE-3SECTIONELEVATION_V2_APPROVE_P23.pdf 41 AR TYPE 3 SEC And ELE


39 67ARConcourselvlPlatformlevel_ReferenceImage_of_Furniture_Layout1_APPROVE_P5.pdf 67 AR Conc lvl Plat level Refer of
40 68ARParcelPostOffice_ReferenceImage_of_Furniture_APPROVE_P5.pdf 68 AR Parc And Post Offi Refer of F
69 AR RPF Barr And RPF Post Ref
41 69AR184_IS_01_TD_03mD02e_RPFBarracksRPFPost_ReferenceImage_of_Furniture_APPROVE_P6.pdf
Fur
42 72AR184_IS_01_TD_03mD03a_InteriorViews_APPROVE_P12_compressed.pdf 72 AR TD Interior Views
43 74AR184_IS_01_TD_03mD03d_3dViews_Stationbuildingconcourse_APPROVE_P5_compressed.pdf 74 AR TD Vie Stat buil And con
44 86AR184_IS_01_TD_03nD01_Busstop_Plananddetail_APPROVE_P12.pdf 86 AR Bus stop Plan and deta
45 151ELSubstation_Drawing_NorthSideRear_V1_APPROVE_P6.pdf 151 EL Sub Drawi North Side Rear
46 26ARStationbuildingNE_GroundfirstfloorplanDurg_V3_APPROVE_P29_compressed.pdf 26 AR Stat buil NE Gro And firs flo
47 34AR184_IS_01_TD_03dP01_TypeII_Stiltfloorplan_V1_APPROVE_P14.pdf 34 AR Type Stilt floor plan
48 35ARType2_TypicalFloorPlan_V4_APPROVE_P26_compressed.pdf 35 AR Type 2 Typical Floor Plan
49 36ARType2_TerracelFloorPlan_V4_APPROVE_P27.pdf 36 AR Type Terra Flo Plan
50 37ARTYPE-2SECTION_V3_APPROVE_P23_compressed.pdf 37 AR TYPE 2 SECTION
51 38ARTYPE-2ELEVATIONDURG_V2_APPROVE_P23.pdf 38 AR TYPE 2 ELEVATION DURG
52 50ARRPFBarracksmaleallfloorplansDurg_V2_APPROVE_P27.pdf 50 AR RPF Barr male all flo pla Dur
53 88AR184_IS_01_TD_03rP01_CrewLobby_AllFloorPlan_V1_APPROVE_P11.pdf 88 AR Crew Lobby All Flo Plan
54 144FFRPFBarracksFemaleGroundFirstTerracefloorplansFirefightinglayout_APPROVE_P5_compressed.pdf 144 FF RPF Barr Fem Grou First And
55 09ARPhasingPlansModel.pdf 09 AR Phasing Plans Model
11 AR Circulation plan Site level
56 11ARCirculationplanSitelevelDURG.pdf
DURG
13 AR Circulation Plan SW Front Entry
57 13ARCirculationPlanSWFrontEntryConcourseflrplan.pdf
Concourse flr plan
15 AR Circulation Plan NE 2nd Entry
58 15ARCirculationPlanNE2ndEntryConcourseflrplan.pdf
Concourse flr plan
59 17ARRoadDrivewaylayt.pdf 17 AR Road Driveway layt
21 AR Stn Blg S W Concourse flor
60 21ARStnBlgSWConcourseflorplan.pdf
plan
27 AR Stn Bldg N E Concrse and
61 27ARStnBldgNEConcrseandTeraceflrplan.pdf
Terace flr plan
62 30AR184TDPlatformlevelplan.pdf 30 AR 184 TD Platform level plan
63 58AR184ParcelFOB.pdf 58 AR 184 Parcel FOB
64 61ARPlatformsplans.pdf 61 AR Platforms plans
65 64ARTypicalplatformdetail.pdf 64 AR Typical platform detail
66 86AR1PUBLICTOILET.pdf 86 AR 1 PUBLIC TOILET
96 PL Master plan Schematic diagram
67 96PLMasterplanSchematicdiagramsewagelayout.pdf
sewage layout
98 PL Stn Blg S W Concrse flor plan
68 98PLStnBlgSWConcrseflorplanPlumbinglayout.pdf
Plumbing layout
69 121HVACStnblngSWGroundFirstFlorPlanHVAClayout.pdf 121 HVAC Stn blng S W GF AND FF
124 HVAC Stn bldg N E G and F Flor
70 124HVACStnbldgNEGandFFlorPlanHVAClayout.pdf
Plan HVAC layout
125 HVAC Stn Bdg N E Concourse
71 125HVACStnBdgNEConcourseflorplan.pdf
flor plan
126 HVAC Stn Bldg N E Terance flor
72 126HVACStnBldgNETeranceflorplanHVAClayout.pdf
plan HVAC layout
152 SSE Pway Office All Flor Plans
73 152SSEPwayOfficeAllFlorPlansFireProtection.pdf
Fire Protection
162 EL Stn Bldg N E Conrse flr plan
74 162ELStnBldgNEConrseflrplanElectricallayout.pdf
Electrical layout
163 EL Stn Bldg N E Concoe flr plan
75 163ELStnBldgNEConcoeflrplanInformationsystem.pdf
Information system
164 Concourse level plan Electrical
76 164ConcourselevelplanElectricallayout.pdf
layout
165 EL Concourse level plan Infotion
77 165ELConcourselevelplanInfotionsystemlayout.pdf
system layout
167 EL Parcel Post Ofice All flr plans
78 167ELParcelPostOficeAllflrplansInformationsystemlayout.pdf
Information system layout
175 EL Reserve Lounge ground flr
79 175ELReserveLoungegroundflrplanInformationsystemlayout.pdf
plan Information system layout
179 EL SSE Works and SSE Electric
80 179ELSSEWorksandSSEElectricGAllflorplansInformationsystemlayout.pdf G All flor plans Information system
layout
208 CCTV Stn Bldg South West
81 208CCTVStnBldgSouthWestConcorsflorplanCCTVPAsystemPlan.pdf Concors flor plan CCTV and PA
system Plan
04 AR 184IS01TD01L02Demolition
82 04AR184_IS_01_TD_01L02_Demolitionplan_V2_APPROVE_P18_compressed.pdf
plan
83 08AR184_IS_01_TD_01L05_Sitesection_V1_APPROVE_P13_compressed.pdf 08 AR 184IS01TD01L05Site section
31 AR
84 31AR184_IS_01_TD_03cP02_Concourse_level_plan_APPROVE_P12_compressed.pdf
184IS01TD03cP02Concourselevelplan
85 16ARParkinglayoutDURG_V1APPROVE_P20.pdf 16 AR Parking layout DURG
18 AR 1TD Driveway and road
86 18AR184_IS_01_TD_02L06_DrivewayroadsectionsLayout_V1_APPROVE_P15.pdf
sections Layout
215 FAN TD Platform plans Fan layout
87 215FAN184_IS_01_TD_F_12aP01_Platform_plans_FanlayoutPlan_V2_APPROVE_P9.pdf
Plan
88 19AR184_IS_01_TD_02L07_Landscapedetails_V2_APPROVE_P15.pdf 19 AR 184 TD Landscape
14 AR CIRCU PL N E 2ND EN G F
89 14ARCIRCULATIONPLANNORTHEAST2NDENTRYGROUNDFLOORANDFIRSTFLOORDURG_V2_APPROVE_P23.pdf
And F
90 22ARStationbuildingSW_ServiceRetiringfloorplanDurg_V3_APPROVE_P29.pdf 22 AR Station building SW S And R

Pa g e 3 o f 6 Ru n Da te/Time: 14/0 3/2 0 2 4 19 :44:40


RAIPUR DIVISION-GATI SHAKTI/SOUTH EAST CENTRAL RLY
TENDER DOCUMENT
Tender No: DyCE-GSU-R-T-19-23-24 Closing Date/Time: 10/05/2024 11:00

91 23ARStationbuildingSW_TerracefloorplanDurg_V3_APPROVE_P29_.pdf 23 AR Station building SW T F P Dur


92 32ARRooflevelplanDurg_V2_APPROVE_P27.pdf 32 AR Roof level plan Durg
93 33ARConcourseSECTIONANDELEVATION_V3_APPROVE_P23_.pdf 33 AR Concourse S AND E
94 39ARType3_GroundFloorPlan_V2_APPROVE_P23.pdf 39 AR Type 3 G F Plan
95 40ARType3_TerracelFloorPlan_V2_APPROVE_P24.pdf 40 AR Type 3 T F Plan
96 42ARType4_GroundFloorPlan_V2_APPROVE_P24.pdf 42 AR Type 4 G F Plan
97 43ARType4_TerracelFloorPlanDurg_V2_APPROVE_P25.pdf 43 AR Type 4 T F Plan Durg
44 AR TYPE 4 ELEVATION AND
98 44ARTYPE-4ELEVATIONANDSECTIONS_V2_APPROVE_P23.pdf
SECTIONS
99 45ARType5_GroundFloorPlanDurg_V2_APPROVE_P25.pdf 45 AR Type 5 Ground Floor Plan Durg
100 46ARType5_TerracelFloorPlanDurg_V2_APPROVE_P25.pdf 46 AR Type 5 Terracel Floor Plan Du
47 AR TYPE 5 SECTION AND
101 47ARTYPE-5SECTIONANDELEVATIONDURG_V1_APPROVE_P22.pdf
ELEVATION
48 AR Parcel POST OFFICE ALL
102 48ARParcelPOSTOFFICEALLFLOORPLAN_V3_APPROVE_P25.pdf
FLOOR
49 AR Parcel building SECTION AND
103 49ARParcelbuildingSECTIONANDELEVATION_V2_APPROVE_P16.pdf
E
104 51AR184_IS_01_TD_03iP01b_RPFBarracksFemale_V2_APPROVE_P14.pdf 51 RPF Barracks Female
105 52AR184_IS_01_TD_03iP02_RPFPost_APPROVE_P12.pdf 52 AR 184 IS 01 TD 03iP02 RPF Post
106 53ARRPFBarracksMALESECTIONANDELEVATION_V1_APPROVE_P23.pdf 53 AR RPF Barracks MALE S AND E
54 AR RPF Barracks FEMALE S AND
107 54ARRPFBarracksFEMALESECTIONELEVATION_V2_APPROVE_P23.pdf
E
108 55ARRPFPostSECTIONANDELEVATIONDurg_V1_APPROVE_P21.pdf 55 AR RPF Post S AND E Durg
109 56ARReserveloungeDurg_V4_APPROVE_P31.pdf 56 AR Reserve lounge Durg
57 AR Reserve lounge S AND E
110 57ARReserveloungeSECTIONANDELEVATIONDDURG_V2_APPROVE_P23.pdf
DURG
111 65AR184_IS_01_TD_03mD02a_StationBuilding_Southwest_ReferenceImage_of_Furniture_V1_APPROVE_P7_.pdf 65 Station Building South west Refe
112 66AR184_IS_01_TD_03mD02b_StationBuilding_NorthEast_ReferenceImage_of_Furniture_V1_APPROVE_P7_.pdf 66 Station Building North East R oF
113 106PL184_IS_01_TD_PL_04eP01_TypeIII_GroundFloorPlan_PlumbingLayout_APPROVE_P5_.pdf 106 PL Type III Ground F P Plumbing
114 107PL184_IS_01_TD_PL_04eP02_TypeIII_Terracefloorplan_Plumbinglayout_APPROVE_P5_.pdf 107 PL TD PL Type III Terrace Fr Pn
115 108PL184_IS_01_TD_PL_04fP01_TypeIV_GroundFloorPlan_PlumbingLayout_APPROVE_P5_.pdf 108 PL 184 TD IV G F Plan Pg L
116 109PL184_IS_01_TD_PL_04fP02_TypeIV_TerraceFloorPlan_PlumbingLayout_APPROVE_P5_.pdf 109 PL Type IV T F P Plumbing Layo
117 110PL184_IS_01_TD_PL_04gP01_TYPEV_GroundFloorPlan_PlumbingLayout_APPROVE_P5_.pdf 110 PL TD PL TYPE V G F Plan
111 PL TD PL TYPE V T F P
118 111PL184_IS_01_TD_PL_04gP02_TYPEV_TerraceFloorPlan_PlumbingLayout_APPROVE_P5_.pdf
Plumbing
119 114PLRPFBarracksFemaleGroundfirstTerracefloorplansPlumbinglayout_APPROVE_P5_.pdf 114 PL RPF B Female G first AND Ter
120 115PL184_IS_01_TD_PL_04iP03_RPFPost_Allfloorplans_PlumbingLayout_APPROVE_P5_.pdf 115 PL RPF Post All F P Plumbing La
121 138FF184_IS_01_TD_FF_06fP01_TypeIII_Groundfloorplan_Firefightinglayout_APPROVE_P5.pdf 138 FF TD FF Type III G f plan Fire
122 139FF184_IS_01_TD_FF_06fP02_TypeIII_Terracefloorplan_Firefightinglayout_APPROVE_P5.pdf 139 FF TD FF Type III Ter flo Pn Fi
123 140FF184_IS_01_TD_FF_06gP01_TypeIV_Groundfloorplan_Firefightinglayout_APPROVE_P51.pdf 140 FF TDType IV G F P Firefightin
124 141FF184_IS_01_TD_FF_06gP02_TypeIV_Terracefloorplan_Firefightinglayout_APPROVE_P5.pdf 141 FF Terrace floor plan Fire layo
125 172STStationBuildingSouthWest_GroundFloorFirstFloorPlan_StructureDrawing_APPROVE_P4.pdf 172 ST Sta Buil South West Gro Flo
126 173STStationBuildingSouthWest_ConcourseServiceFloorPlan_StructureDrawing_APPROVE_P4.pdf 173 ST Sta Buil Sou Wes Con And Ser
127 174STStationBuildingSouthWest_RetiringTerraceFloorPlan_StructureDrawing_APPROVE_P4.pdf 174 ST Sta Bui S W Reti And Terr Fl
128 SignageGuidelinesforRailwayStations.pdf Signage Guidelines for Railway Stat
129 MASTERPLANOFDURG_1.pdf MASTER PLAN OF DURG
130 59AR184_IS_01_TD_03kP02_Arrival_FOB02_APPROVE_P8_1.pdf 59 AR 184 TD Arrival FOB
131 60AR184_IS_01_TD_03kP03_Arrival_FOB03_APPROVE_P8_1.pdf 60 AR 184 TD
132 62AR184_IS_01_TD_03mD01b_Typicalsheddetail_APPROVE_P8.pdf 62 AR 184 TD
133 78AR184_IS_01_TD_03mD03g_3dViews_AncillaryBuildingReserveLounge_APPROVE_P8.pdf 78 AR 184 TD Ancillary Building Res
134 80AR184_IS_01_TD_03mD03i_3dViews_BusStop_APPROVE_P8.pdf 80 AR 184 TD 3dViews Bus Stop
135 94PL184_IS_01_TD_PL_04aL01_Masterplan_Externaldrainagelayout_APPROVE_P5.pdf 94 PL 184 TD PL Master plan Externa
136 117PL184_IS_01_TD_PL_04dP01_Concourse_level_plan_Plumbinglayout_APPROVE_P5.pdf 117 PL 184 TD PL Concourse level pl
123 HVAC Stn Bldg SW Service and
137 123HVACStationBuildingSW_ServiceRetiringfloorPlans_HVAClayout_APPROVE_P6.pdf
Re
138 131FF184_IS_01_TD_FF_06aP01Siteplan_firefightinglayout_APPROVE_P5.pdf 131 FF 184 TD FF Siteplan firefight
139 133FFStationBuildingSouthWest_ConcourseServicefloorplan_Firefightinglayout_V2_APPROVE_P7.pdf 133 FFStation Bldg South West Con a
140 158ELStationBuildingSW_ServiceretiringfloorPlans_Electricallayout_APPROVE_P4.pdf 158 EL Station Building SW Service
141 166ELParcelPostOffice_Allfloorplans_Electricallayout_APPROVE_P4.pdf 166 EL Parcel Post Office All floor
142 174ELReserveLounge_groundfloorplan_Electricallayout_APPROVE_P4.pdf 174 EL Reserve Lounge ground floor
143 214184_IS_01_TD_MA_11aP01_Platformplans_Pressurisedmistingsystem_APPROVE_P7.pdf 214 184 TD MA Platform plans Pressu
144 GuidlinesforProcurmentofTMTsteel.pdf Guidlines for Procurment of TMT ste
145 2EPCAgreementDurgStation02.03.24.pdf EPC Agreement Durg Station
146 SCHEDULEA-P02.03.24_compressed.pdf SCHEDULE A to P ex D
147 03-ScheduleDA02.03.24.pdf Schedule DA
148 04-SheduleDB02.03.24.pdf Schedule DB
149 83AR184_IS_01_TD_03mD04a_StationBuilding_SouthWest_ExclisiveArtwork_APPROVE_P7.pdf 83 AR Stn Bldg South West Exclis A
150 89AR184_IS_01_TD_03rS01_CrewLobby_Sectionselevations_APPROVE_P11.pdf 89 AR Crew Loby Section elevation
151 90AR184_IS_01_TD_03sP01_SSEPway_GroundFloorPlans_V1_APPROVE_P11.pdf 90 AR SSE Pway Ground Floor Plans
92 AR SSE Works and SSE
152 92AR184_IS_01_TD_03tP01_SSE_Works__SSEElectricG_AllFloorPlan_V2_APPROVE_P14.pdf
ElectricbG
153 95AR184_IS_01_TD_PL_04aL02_Masterplan_Watersupplylayout_V1_APPROVE_P7.pdf 95 AR Master plan Water suply layou
154 103PL184_IS_01_TD_PL_04eP01_TypeII_Stiltfloorplan_Plumbinglayout_APPROVE_P5.pdf 103 PL TD PL Type II Stilt floor pl
155 105PL184_IS_01_TD_PL_04eP03_TypeII_Terracefloorplan_Plumbinglayout_APPROVE_P7.pdf 105 PL Type II Terrace floor plan P
156 113PL184_IS_01_TD_PL_04jP01_RPFBarracksMale_Allfloorplans_PlumbingLayout_APPROVE_P5.pdf 113 PL 184 RPF Barracks Male All fl
157 116PL184_IS_01_TD_PL_04kP01_Reservelounge_AllfloorPlans_PlumbingLayout_APPROVE_P5.pdf 116 PL 184 Reserve lounge All flor

Pa g e 4 o f 6 Ru n Da te/Time: 14/0 3/2 0 2 4 19 :44:40


RAIPUR DIVISION-GATI SHAKTI/SOUTH EAST CENTRAL RLY
TENDER DOCUMENT
Tender No: DyCE-GSU-R-T-19-23-24 Closing Date/Time: 10/05/2024 11:00

158 118PL184_IS_01_TD_PL_04mP01_CrewLobby_AllFloorPlan_PlumbingLayout_APPROVE_P7.pdf 118 PL 184 Crew Loby All Flor Plan


159 120PL184_IS_01_TD_PL_04nP01_SSEPwayOffice_AllFloorPlans_PlumbingLayout_APPROVE_P7.pdf 120 PL 184SSE Pway Office All Floor
160 128HVACCrewLobby_AllFloorPlan_HVAClayout_V1_APPROVE_P8.pdf 128 HVAC Crew Lobby All Floor Plan
161 146FFRPFBarracksMale_Allfloorplans_FirefightingLayout_APPROVE_P5.pdf 146 FF RPF Barracks Male All floor
162 148FF184_IS_01_TD_FF_06jP03_RPFPost_Allfloorplans_Firefightinglayout_APPROVE_P5.pdf 148 FF 184 RPF Post All floor plans
149 FF 184 TD FF Reserve lounge
163 149FF184_IS_01_TD_FF_06kP01_ReserveloungeDurg_Allfloorplans_FirefightingLayout_APPROVE_P5.pdf
Dur
164 150184_IS_01_TD_FF_06mP01_CrewLobby_AllFloorPlan_FirefightingLayout_APPROVE_P5.pdf 150 184 FF Crew Lobby All Floor Pl
151 FF SSE Works and SSEElectricG
165 151FFSSE_Works__SSEElectricG_AllFloorPlan_Firefightinglayout_APPROVE_P5.pdf
A
166 05-ScheduleDC02.03.24_1.pdf Schedule DC
167 1RFPDocumentDurgVol102.03.24_1.pdf RFP Document Durg Vol 1
168 63AR184_IS_01_TD_03mD01c_TypicalPlatformdetail01_V2_APPROVE_P10.pdf 63 AR 184 Typ Plat detail
132 FF Stn Bldng S West G F floor
169 132FFStationBuildingSouthWest_GroundFirstfloorPlan_Firefightinglayout_APPROVE_P5.pdf
Plan Firefighting layout
135 Stn Bldg N East Ground First floor
170 135FFStationBuildingNorthEast_GroundFirstfloorPlan_Firefightinglayout_APPROVE_P5.pdf
Plan Firefighting
171 06AR184_IS_01_TD_01L03_Relocationplan_V1_APPROVE_P13.pdf 06 AR 184 Relocation plan
172 10ARStationDevelopmentArea_V2_APPROVE_P22.pdf 10 AR Station Development Area
70 Reserve lounge ReferImage of
173 70AR184_IS_01_TD_03mD02f_Reservelounge_ReferenceImage_of_Furniture_APPROVE_P4_compressed.pdf
Furniture
76 Views Ancillary Bldg Parcel bldg
174 76AR3dViews_AncillaryBuildingParcelbuildingRPFpost_APPROVE_P12_compressed.pdf
RPF post
77 Views Ancillary Bldg RPF baracks
175 77AR3dViews_AncillaryBuildingRPFbarracks-MaleFemale_APPROVE_P12_compressed.pdf
Male Female
99 PL Stn Bldg South West Fnt Entry
176 99PLStationBuildingSouthWestFrontEntry_ServiceRetiringfloorPlans_Plumbinglayout_APPROVE_P5.pdf Service Retiring flor Plns Plumbing
layout
100 PL Stn Bldg South West Front
177 100PLStationBuildingSouthWestFrontEntry_TerracefloorPlan_PlumbingLayout_APPROVE_P5.pdf
Entry Terace flor Plan Plubg Lyt
101 PL Stn Bldg North East Rear
178 101PLStationBuildingNorthEastRearEntryGroundFirstFloorPlanPlumbinglayout_APPROVE_P5_compressed.pdf
Entry GrudFirst Flor Plan Plbng layout
102 PL Stn Bldg North East Course
179 102PLStationBuildingNorthEast_Concourseterracefloorplan_Plumbinglayout_APPROVE_P5.pdf
terace flor pln Plubing layout
119 PL SSE Wks SSE Electric G All
180 119PLSSEWorksSSEElectricGAllFloorPlanPlumbinglayout_APPROVE_P5.pdf
Flor Plan Plubing layout
168 EL RPF Barracks Male All flor
181 168EL184_IS_01_TD_EL_07jP01_RPFBarracksMale_Allfloorplans_Electricallayout_APPROVE_P4.pdf
plans Elal layout
176 EL 184 Crew Lobby All floor plans
182 176EL184_IS_01_TD_EL_07mP01_CrewLobby_Allfloorplans_Electricallayout_APPROVE_P4.pdf
Electrical layout
180 SSE Pway office All floor plans
183 180EL184_IS_01_TD_EL_07nP01_SSEPwayoffice_Allfloorplans_Electricallayout_APPROVE_P4.pdf
Electrical layout
184 TD ST Crew Loby All Flor Plan
184 184_IS_01_TD_ST_08mP01_CrewLobby_AllFloorPlan_StructureDrawing_APPROVE_P4_1.pdf
Strture Dwg
185 STR Stn Bldg North East Rear
185 185STRStationBuildingNorthEastRear_GroundFloorFirstFloorPlan_StructureDrawing_APPROVE_P4.pdf
Gnd Flr and Fst Flor Plan Sture Dwg
186 STR Stn Blg North East Rear
186 186STRStationBuildingNorthEastRear_ConcourseTerraceFloorPlan_StructureDrawing_APPROVE_P4.pdf Course and Terace Flor Plan Strur
Dwg
187 Air Concourse level GA Pln Stre
187 187STR184_IS_01_TD_ST_08cP01_AirConcourse_Concourselevel_GA_Plan_StructureDrawing_V1_APPROVE_P6.pdf
Dwg
188 Airv Conurse Through Roof level
188 188STR184_IS_01_TD_ST_08cP02_AirConcourse_ThroughRooflevel_GA_Plan_StructureDrawing_APPROVE_P4.pdf
GA Plan Strue Dwg
189 197STR184_IS_01_TD_ST_08gP02_TypeV_TerraceFloorPlan_StructureDrawing_APPROVE_P4.pdf 197 STR Terce Floor Plan Strture Dwg
198 STR Parcel Post office All Flor
190 198STR184_IS_01_TD_ST_08hP01_ParcelPostoffice_AllFloorPlan_StructureDrawing_V1_APPROVE_P6.pdf
Plan Srture Dwg
202 STR Reserve lounge All flor plans
191 202STR184_IS_01_TD_ST_08jP01_Reservelounge_Allfloorplans_Structuredrawing_APPROVE_P4.pdf
Strture dwg
203 STR Parcel FOB Arival FOB
192 203STRParcel_FOB01Arrival_FOB02Arrival_FOB03_StructureDrawing_V1_APPROVE_P6.pdf
Arrival FOB Sture Dwg
205 STR Works SSE Electric G All
193 205STR184_IS_01_TD_ST_08pP01_SSE_Works__SSEElectricG_AllFloorPlan_Structuredrawings_APPROVE_P4.pdf
Flor Plan
206 STR SSE Pway Office All Floor
194 206STR184_IS_01_TD_ST_08nP01_SSEPwayOffice_AllFloorPlan_StructureDrawing_APPROVE_P4.pdf
Plan Sture Dwg
207 CCTV Stn Bldg South West Grnd
195 207CCTVStationBuildingSouthWest_GroundFirstfloorPlan_CCTVPAsystemPlan_APPROVE_P5_11zon.pdf
and First flor Plan
209 CCTV Stn Bldg S W Service and
196 209CCTVStationBuildingSouthWest_ServiceRetiringroom_CCTVPAsystemPlan_APPROVE_P5.pdf
Retiring room CCTV PA system Plan
197 210CCTVStationBuildingSouthWest_terracefloorplan_CCTVPAsystemPlan_APPROVE_P5.pdf 210 CCTV Stn Bdg S W terace flr plan
211 CCTV Stn Bldg N E Ground and
198 211CCTVStationBuildingNorthEast_GroundFirstfloorPlan_CCTVPAsystemPlan_APPROVE_P5_compressed_11zon2.pdf
Frt flr Plan CCTV PA system Plan
212 Stn Bldg N E Concourse and
199 212StationBuildingNorthEast_ConcourseTerracefloorPlan_CCTVPAsystemPlan_APPROVE_P5.pdf
Terace flor Plan CCTV
213 CCTV Parcel FOB Arrival FOB
200 213CCTVParcel_FOB01Arrival_FOB02Arrival_FOB03_CCTVPAsystemPlan_APPROVE_P5.pdf
and Arrival FOB03 CCTV
201 05AR184_IS_01_TD_01L02a_Superimposeplan_V2_APPROVE_P15_compressed.pdf 05 AR 184 Superimpose plan
97 PL Stn Bldg S W Front Entry Grnd
202 97PLStationBuildingSouthWestFrontEntry_GroundFirstfloorPlans_PlumbingLayout_APPROVE_P5.pdf
and First flr Plans Plumbing Layout
145 FF Parcel Post office All Floor
203 145FF184_IS_01_TD_FF_06iP01_ParcelPostoffice_AllFloorPlan_Firefightinglayout_APPROVE_P5.pdf
Plan Firefighting layout
173 EL RPF Post All flor plans
204 173ELRPFPost_Allfloorplans_Informationsystemlayout_APPROVE_P6.pdf
Information system layout

Pa g e 5 o f 6 Ru n Da te/Time: 14/0 3/2 0 2 4 19 :44:40


RAIPUR DIVISION-GATI SHAKTI/SOUTH EAST CENTRAL RLY
TENDER DOCUMENT
Tender No: DyCE-GSU-R-T-19-23-24 Closing Date/Time: 10/05/2024 11:00

201 str 184 RPF Post All Floor Plan


205 201str184_IS_01_TD_ST_08iP03_RPFPost_AllFloorPlan_StructureDrawing_APPROVE_P4.pdf
Str Dwg
206 SoilInvestigationReportofDurgStation.pdf Soil Investigation Report of Durg S
207 71AR184_IS_01_TD_03mD02g_Street_furniture_APPROVE_P5.pdf 71 AR Street furniture
208 104PL184_IS_01_TD_PL_04eP02_TypeII_Typicalfloorplan_Plumbinglayout_APPROVE_P5_compressed.pdf 104 PL Type Tycal flr plan Plbing l
209 135FF184_IS_01_TD_FF_06eP01_TypeII_Stiltfloorplan_Firefightinglayout_APPROVE_P5_compressed.pdf 135 FF Stilt flr plan Fiefihting la
210 136FF184_IS_01_TD_FF_06eP02_TypeII_Typicalfloorplan_Firefightinglayout_APPROVE_P5.pdf 136 FF Typcal flr plan Firfighting
211 137FF184_IS_01_TD_FF_06eP03_TypeII_Terracefloorplan_Firefightinglayout_APPROVE_P5_compressed.pdf 137 FF Terace flr plan Fireghting l
212 179ST184_IS_01_TD_ST_08dP01_TypeII_StiltFloorPlan_StructureDrawing_APPROVE_P4.pdf 179 ST Stilt Flr Plan Struture Dwg
213 181ST184_IS_01_TD_ST_08dP02_TypeII_TypicalFloorPlan_StructureDrawing_APPROVE_P4.pdf 181 ST Typcal Flr Plan Struture Dwg
214 182ST184_IS_01_TD_ST_08dP03_TypeII_TerraceFloorPlan_StructureDrawing_APPROVE_P4.pdf 182 ST Terace Flr Plan Strture Dwg
215 183ST184_IS_01_TD_ST_08eP01_TypeIII_GroundFloorPlan_StructureDrawing_APPROVE_P4.pdf 183 ST Grnd Flr Plan Strcture Dwg
216 184ST184_IS_01_TD_ST_08eP02_TypeIII_TerraceFloorPlan_StructureDrawing_APPROVE_P4.pdf 184 ST Terrace Flr Plan Strture Dwg
217 185ST184_IS_01_TD_ST_08fP01_TypeIV_GroundFloorPlan_StructureDrawing_APPROVE_P4.pdf 185 ST Ground Floor Plan Stcture Dw
218 186ST184_IS_01_TD_ST_08fP02_TypeIV_TerraceFloorPlan_StructureDrawing_APPROVE_P4.pdf 186 ST Terrace Floor Plan Strture D
219 187ST184_IS_01_TD_ST_08gP01_TypeV_GroundFloorPlan_StructureDrawing_APPROVE_P4.pdf 187 ST Grnd Flr Plan Strture Dwg
220 190ST184_IS_01_TD_ST_08iP01_RPFBarracksmale_AllFloorPlan_StructureDrawing_APPROVE_P4.pdf 190 RPF Barcks male All Flr Plan St
221 191ST184_IS_01_TD_ST_08iP02_RPFBarracksfemale_AllFloorPlan_StructureDrawing_APPROVE_P4.pdf 191 ST RPF Bracks fmle All Flr Pln

This tender complies with Public Procurement Policy (Make in India) Order 2017, dated 15/06/2017, issued by Department of Induswww Promotion and Policy, Ministry of Commerce,
circulated vide Railway Board letter no. 2015/RS(G)/779/5 dated 03/08/2017 and 27/12/2017 and amendments/ revisions thereof.

As a Tender Inviting Authority, the undersigned has ensured that the issue of this tender does not violate provisions of GFR regarding procurement through GeM.

Signed By: ASHISH MISHRA

Designation : CPM/GSU/R

Pa g e 6 o f 6 Ru n Da te/Time: 14/0 3/2 0 2 4 19 :44:40

You might also like