Electrical (SB) Hr-9th Floor
Electrical (SB) Hr-9th Floor
Electrical (SB) Hr-9th Floor
PROJECT NO. -
SB-1A 1 1350
SB-1B 1 IN FUR
(ABOVE TABLE TOP)
SB-1C 1 IN FUR
CHIEF CABIN (BELOW TABLE TOP)
SB-1D 1 IN FUR
(ABOVE TABLE TOP)
SB-1E 1
SB-1F 1 900
SB-1G 1 1350
SB-1H 1 1350
SB-2A 1 1350
SB-2B 10 IN FUR
(ABOVE TABLE TOP)
SB-2C 10 IN FUR
(BELOW TABLE TOP)
SB-2E 1 1350
1
1
SB-2F 1 1350
1
1
SB-3A 5 1350
SB-3B 5 IN FUR
(ABOVE TABLE TOP)
TRUST & LEGAL &LD
CABIN & DY CHIEF
CABIN & HEAD
CABIN, TA CABIN SB-3C 5 IN FUR
(BELOW TABLE TOP)
SB-3D 5 IN FUR
(ABOVE TABLE TOP)
SB-3E 5
SB-3F 5 900
SB-4A 1 1350
SB-4B 21 IN FUR
(ABOVE TABLE TOP)
SB-4C 21 IN FUR
HCM (BELOW TABLE TOP)
WORKSTATION
SB-4D 1 1350
WORKSTATION
SB-4E 1 1350
SB-4F 1 1350
SB-5A 1 1350
SB-5B 15 IN FUR
(ABOVE TABLE TOP)
SB-5C 15 IN FUR
(BELOW TABLE TOP)
SB-5D 1 1350
TA WORKSTATION
SB-5E 1 1350
SB-5F 1 1350
SB-5G 1 1350
SB-5H 1 1350
AD, PUNE.
REQUIRED STANDARD
COMMENTS MODULE
MODULES MODULES