Ppd-Zamboanga 3 Storey Warehouse - Rev00 - 20.12.2022
Ppd-Zamboanga 3 Storey Warehouse - Rev00 - 20.12.2022
Ppd-Zamboanga 3 Storey Warehouse - Rev00 - 20.12.2022
TOTAL DRAWING: 14
A B C D E F G H I J
7
REMARK: 7
1.DESIGN STANDARDS & CALCULATED LOADINGS: 2.3 BOLT CATEGORY 3. FABRICATION STANDARDS: REVISION
2.3.1 ANCHOR BOLT
1.1 DESIGN STANDARDS:
L
T2 T1
DxP
SAB W
PROJECTION MIN 5MM TACK WELD @3POINT N
REV.
1.2 CALCULATED LOADINGS: (OR 2 THREAD PICH) H (MIN 12xD) PRO DATE DESCRIPTION DRAW. CHECK PPD.
2. FABRICATED MATERIAL: 2.3.2 PRIMARY BOLT (HIGH STRENGTH) T.M.L VIET NAM Co.,Ltd
5 5
5.2 - PURLIN C:
PHAN THANH LONG
4 4
TECHNICAL MANAGER
CHECKER
S1 (mm) <=4 5-6 7-9 10 - 15 16-21 22-30
Hh (mm) >3 >4 >5 >6 >7 >8
S2
Eng.
s Eng.
t
200
2
50
t Q DRAWING
t/4 f 19 6 t 4035° 7. METHOD TO JOINT STEEL:
0 5 t 19 L=100mm
7.1 JOINT STEEL SHAPE (I, H, U)
Eng.
PROJECT
LOCATION: PHILIPPINES
ITEM:
g
e (mm) 7 8 9
b
g (mm) 1.5 1.5 2
DRAWING NAME:
GENERAL NOTE
1 1
A B C D E F G H I J
A B C D E F G H I J
7 7
BLOCK WALL (BY OTHER)
REVISION
5651
6 6
B PROPOSAL DRAWINGS
5500
C/C OF STEEL COLUMN
C
5438
5 5
D
12th FLOOR, HAI AU BUILDING, 39B TRUONG SON, WARD 04
TAN BINH DISTRICT, HO CHI MINH CITY, VIET NAM
5911
GENERAL DIRECTOR
E
PHAN THANH LONG
4 4
TECHNICAL MANAGER
5000 5000 5000 6000 6000 6000 6000 6000 3200
48200
C/C OF STEEL COLUMN M.ENG HUONG THANH KHANG
CHECKER
1 2 3 4 5 6 7 8 9 10
Eng.
DESIGNER
COLUMN PLAN SC: 1/175
3 3
NOTE: Eng.
DRAWING
L Eng.
T2 T1 PROJECT
DxP
ZAMBOANGA 3 STOREY WAREHOUSE
TACK WELD @3POINT SAB W
2 PROJECTION MIN 5MM N 2
A (OR 2 THREAD PICH) H (MIN 12xD) PRO
LOCATION: PHILIPPINES
TYPICAL COLUMN DETAIL SECTION A - A M36 SAB:36 M36 x 4.0 190 45 750 130
No. : REV: 00 LEV:
M42 SAB:42 M42 x 4.5 230 55 870 160
M48 SAB:48 M48 x 5.0 260 60 980 180 DATE: 20/12/2022 No. Dra: D02 Job No.063.22.34
A B C D E F G H I J
A B C D E F G H I J
7 7
OFFICE
REVISION
5651
6 6
B PROPOSAL DRAWINGS
5500
C/C OF STEEL COLUMN
C
5438
5 5
D
12th FLOOR, HAI AU BUILDING, 39B TRUONG SON, WARD 04
TAN BINH DISTRICT, HO CHI MINH CITY, VIET NAM
5911
GENERAL DIRECTOR
E
PHAN THANH LONG
4 4
TECHNICAL MANAGER
5000 5000 5000 6000 6000 6000 6000 6000 3200
48200
C/C OF STEEL COLUMN M.ENG HUONG THANH KHANG
CHECKER
1 2 3 4 5 6 7 8 9 10
Eng.
3 3
NOTE: Eng.
DRAWING
Eng.
PROJECT
LOCATION: PHILIPPINES
150
ITEM:
STEEL STRUCTURE
JOIST
DRAWING NAME:
A B C D E F G H I J
A B C D E F G H I J
7 7
REVISION
10%
10%
REV. DATE DESCRIPTION DRAW. CHECK PPD.
5651
10%
10%
6 6
B PROPOSAL DRAWINGS
5500
C/C OF STEEL COLUMN
C
5438
5 5
D
12th FLOOR, HAI AU BUILDING, 39B TRUONG SON, WARD 04
TAN BINH DISTRICT, HO CHI MINH CITY, VIET NAM
5911
GENERAL DIRECTOR
E
PHAN THANH LONG
4 4
TECHNICAL MANAGER
5000 5000 5000 6000 6000 6000 6000 6000 3200
48200
C/C OF STEEL COLUMN M.ENG HUONG THANH KHANG
CHECKER
1 2 3 4 5 6 7 8 9 10
Eng.
3 3
NOTE: Eng.
DRAWING
Eng.
PROJECT
LOCATION: PHILIPPINES
150
ITEM:
STEEL STRUCTURE
JOIST
DRAWING NAME:
A B C D E F G H I J
A B C D E F G H I J
7 7
REVISION
5651
6 6
10%
10%
10%
B PROPOSAL DRAWINGS
5500
C/C OF STEEL COLUMN
C
5438
5 5
10%
10%
10%
D
12th FLOOR, HAI AU BUILDING, 39B TRUONG SON, WARD 04
TAN BINH DISTRICT, HO CHI MINH CITY, VIET NAM
5911
GENERAL DIRECTOR
E
PHAN THANH LONG
4 4
TECHNICAL MANAGER
5000 5000 5000 6000 6000 6000 6000 6000 3200
48200
C/C OF STEEL COLUMN M.ENG HUONG THANH KHANG
CHECKER
1 2 3 4 5 6 7 8 9 10
Eng.
3 3
NOTE: Eng.
DRAWING
Eng.
PROJECT
LOCATION: PHILIPPINES
SECTION A ITEM:
A E
STEEL STRUCTURE
DRAWING NAME:
ROOF PLAN
1 1
A B C D E F G H I J
A B C D E F G H I J
7 7
REVISION
5651
6 6
B PROPOSAL DRAWINGS
5500
C/C OF STEEL COLUMN
C
5438
5 5
D
12th FLOOR, HAI AU BUILDING, 39B TRUONG SON, WARD 04
TAN BINH DISTRICT, HO CHI MINH CITY, VIET NAM
5911
GENERAL DIRECTOR
E
PHAN THANH LONG
4 4
TECHNICAL MANAGER
5000 5000 5000 6000 6000 6000 6000 6000 3200
48200
C/C OF STEEL COLUMN M.ENG HUONG THANH KHANG
CHECKER
1 2 3 4 5 6 7 8 9 10
Eng.
DESIGNER
ROOF BRACING PLAN SC: 1/175
3 3
NOTE: Eng.
DRAWING
Eng.
PROJECT
LOCATION: PHILIPPINES
ITEM:
STEEL STRUCTURE
DRAWING NAME:
A B C D E F G H I J
A B C D E F G H I J
7 7
REVISION
5651
6 6
B PROPOSAL DRAWINGS
5500
C/C OF STEEL COLUMN
C
5438
5 5
D
12th FLOOR, HAI AU BUILDING, 39B TRUONG SON, WARD 04
TAN BINH DISTRICT, HO CHI MINH CITY, VIET NAM
5911
GENERAL DIRECTOR
E
PHAN THANH LONG
4 4
TECHNICAL MANAGER
5000 5000 5000 6000 6000 6000 6000 6000 3200
48200
C/C OF STEEL COLUMN M.ENG HUONG THANH KHANG
CHECKER
1 2 3 4 5 6 7 8 9 10
Eng.
ROOF BRACING PLAN SC: 1/175 DESIGNER
3 3
NOTE: Eng.
DRAWING
Eng.
PROJECT
LOCATION: PHILIPPINES
ITEM:
STEEL STRUCTURE
DRAWING NAME:
A B C D E F G H I J
A B C D E F G H I J
7 7
REVISION
5651
6 6
B PROPOSAL DRAWINGS
5500
C/C OF STEEL COLUMN
C
5438
5 5
D
12th FLOOR, HAI AU BUILDING, 39B TRUONG SON, WARD 04
TAN BINH DISTRICT, HO CHI MINH CITY, VIET NAM
5911
GENERAL DIRECTOR
E
PHAN THANH LONG
4 4
TECHNICAL MANAGER
5000 5000 5000 6000 6000 6000 6000 6000 3200
48200
C/C OF STEEL COLUMN M.ENG HUONG THANH KHANG
CHECKER
1 2 3 4 5 6 7 8 9 10
Eng.
DESIGNER
ROOF PURLIN PLAN SC: 1/175
3 3
NOTE: Eng.
DRAWING
Eng.
PROJECT
LOCATION: PHILIPPINES
ITEM:
A B C D E F G H I J
A B C D E F G H I J
7 7
REVISION
5651
6 6
B PROPOSAL DRAWINGS
5500
C/C OF STEEL COLUMN
C
5438
5 5
D
12th FLOOR, HAI AU BUILDING, 39B TRUONG SON, WARD 04
TAN BINH DISTRICT, HO CHI MINH CITY, VIET NAM
5911
GENERAL DIRECTOR
E
PHAN THANH LONG
4 4
TECHNICAL MANAGER
5000 5000 5000 6000 6000 6000 6000 6000 3200
48200
C/C OF STEEL COLUMN M.ENG HUONG THANH KHANG
CHECKER
1 2 3 4 5 6 7 8 9 10
Eng.
ROOF PURLIN PLAN SC: 1/175 DESIGNER
3 3
NOTE: Eng.
DRAWING
Eng.
PROJECT
LOCATION: PHILIPPINES
ITEM:
A B C D E F G H I J
A B C D E F G H I J
7 7
REVISION
+9.000
3000
6
+6.000 6
9000
3000
PROPOSAL DRAWINGS
+3.000
3000
±0.000
T.M.L VIET NAM Co.,Ltd
5 5
48200
C/C OF STEEL COLUMN
1 2 3 4 5 6 7 8 9 10
12th FLOOR, HAI AU BUILDING, 39B TRUONG SON, WARD 04
TAN BINH DISTRICT, HO CHI MINH CITY, VIET NAM
X-BRACING
3000
+6.000 Eng.
DESIGNER
9000
3000
3 3
+3.000
Eng.
3000
DRAWING
±0.000
Eng.
5000 5000 5000 6000 6000 6000 6000 6000 3200
PROJECT
48200
C/C OF STEEL COLUMN ZAMBOANGA 3 STOREY WAREHOUSE
2 2
1 2 3 4 5 6 7 8 9 10
LOCATION: PHILIPPINES
ITEM:
DRAWING NAME:
A B C D E F G H I J
A B C D E F G H I J
7 7
REVISION
10% 10%
6 6
+6.000
PROPOSAL DRAWINGS
3000
5 5
+3.000
6000
GENERAL DIRECTOR
Eng.
DESIGNER
3 3
±0.000
Eng.
DRAWING
5651
Eng.
A B PROJECT
LOCATION: PHILIPPINES
ITEM:
STEEL STRUCTURE
DRAWING NAME:
A B C D E F G H I J
A B C D E F G H I J
7 7
REVISION
6 6
10% 10%
PROPOSAL DRAWINGS
+9.000
5 5
+6.000
3000
GENERAL DIRECTOR
+3.000
PHAN THANH LONG
4 4
TECHNICAL MANAGER
3000
±0.000
Eng.
DESIGNER
3 3
5651 5500 5438 5911
Eng.
DRAWING
22500
C/C OF STEEL COLUMN
Eng.
A B C D E
PROJECT
2
ELEVATION GL.10 SC: 1/75 ZAMBOANGA 3 STOREY WAREHOUSE
2
LOCATION: PHILIPPINES
ITEM:
STEEL STRUCTURE
DRAWING NAME:
ELEVATION GL.10
1 1
NOTE:
A B C D E F G H I J
A B C D E F G H I J
7 7
REVISION
10% 10%
PROPOSAL DRAWINGS
3000
5 5
GENERAL DIRECTOR
Eng.
DESIGNER
±0.000
3 3
Eng.
DRAWING
5651
A B
Eng.
PROJECT
LOCATION: PHILIPPINES
ITEM:
STEEL STRUCTURE
DRAWING NAME:
A B C D E F G H I J
A B C D E F G H I J
7 7
REVISION
6
* * * * 6
* * * *
* * PROPOSAL DRAWINGS
+9.000
5 +6.000 5
3000
GENERAL DIRECTOR
+3.000
Eng.
5651 5500 5438 5911 DESIGNER
3 3
22500 Eng.
C/C OF STEEL COLUMN
DRAWING
A B C D E
Eng.
LOCATION: PHILIPPINES
ITEM:
STEEL STRUCTURE
DRAWING NAME:
A B C D E F G H I J